Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
HA - DESIGN BUILD CONSTRUCTION MULTIPLE AWARD TASK ORDER CONTRACT (MATOC), INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) FOR DESIGN-BUILD CONSTRUCTION. IT IS THE GOVERNMENTS INTENTION TO AWARD AT LEAST ONE (1) AND UP TO THREE (3) CONTRACTS TO FULFILL THE REQUIRED DESIGN-BUILD CONSTRUCTION SERVICES. BASE PERIOD: 08 JULY 2010 07 JULY 2011 THE INITIAL CUMULATIVE AMOUNT OF TASK ORDERS PER MATOC CONTRACT SHALL NOT EXCEED $3,000,000.00. THE AWARD OF THE FIRST TASK ORDER WILL MEET THE MINIMUM GUARANTEE FOR THIS CONTRACT. PLEASE PROVIDE LABOR RATE/COST FOR THE ABOVE REFERENCED PROJECT: THE FOLLOWING PROJECT-SPECIFIC INFORMATION IS PROVIDED. IT SHOULD BE NOTED THAT THE PROJECT CONTAINS ADDITIVE ITEMS THAT ARE TO BE INCLUDED AS OPTIONS WITHIN THE CONTRACTORS PROPOSAL. THE ADDITIVE ITEMS PRICES SHALL BE CLEARLY SEPARATED FROM THE BASE PRICES. THESE ITEMS ARE INCLUDED TO ALLOW THE GOVERNMENT FLEXIBILITY IN ADDING PROJECT-SPECIFIC WORK BASED ON FUNDS AVAILABLE. MULANKAVIL DISTRICT HOSPITAL: THE CONTRACTOR SHALL SITE-ADAPT DESIGN AND CONSTRUCT THE MULANKAVIL DISTRICT HOSPITAL (DH) AS DETAILED IN THIS SOW AND ASSOCIATED ATTACHMENTS. IN SUMMARY, THE MULANKAVIL DH SHALL BE A SINGLE STORY FACILITY, 845 SQUARE METERS IN SIZE, EQUIPPED WITH FURNISHINGS, CONNECTED TO GENERATOR POWER, AND WATER SUPPLY. THE FACILITY SHALL BE PLACED AS CLOSE AS POSSIBLE TO THE EXISTING DRUG STORE BUT SHALL NOT BE CONNECTED.. THE NECESSARY FILL MATERIAL SHALL BE PROVIDED TO ENSURE PROPER ELEVATION AND DRAINAGE. THE FOLLOWING SPECIFIC ITEMS SHALL ALSO BE INCLUDED BY THE CONTRACTOR: OPTIONAL ITEM(S): OPTION TASK 1 PUBLIC WASH BUILDING THE CONTRACTOR SHALL PROVIDE AN OPTIONAL COST FOR CONSTRUCTING A PUBLIC WASH BUILDING WITH A FLOOR PLAN AS DETAILED IN ATTACHMENT B. WATER AND ELECTRICITY SHALL BE CONNECTED TO THE WASH BUILDING. THE WASH BUILDING SHALL BE SEPARATED INTO TWO SIDES, EACH WITH TWO SQUAT TOILETS, ONE WESTERN TOILET, AND TWO WASH BASINS. OPTION TASK 2 KITCHEN A KITCHEN BUILDING SHALL BE DESIGNED AND CONSTRUCTED THAT INCLUDES A COOKING AREA AND WASH BASIN. WATER AND ELECTRICITY CONNECTION SHALL BE INCLUDED. THE FLOOR LAYOUT IS PROVIDED IN ATTACHMENT B.
Estimated months remaining until end of performance.
Task order obligations
Period of performance
100% of period elapsed
Awarding Agency
DODEPT OF THE ARMY
Code: 2100
Funding Agency
DODEPT OF THE ARMY
Code: 2100
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|