Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
IGF::OT::IGF A/E BRIDGE INSPECTIONS - SUBASE KINGS BAY GA AND MCLB ALBANY GA. TASKING FIELD INSPECTION: THE A-E SHALL PERFORM BRIDGE INSPECTIONS IN ACCORDANCE WITH THE NAVY REQUIREMENTS DESCRIBED IN REFERENCE (A). IN CASES WHERE THERE ARE NO SPECIFIC NAVY REQUIREMENTS, THE WORK SHALL MEET THE MINIMUM REQUIREMENTS OF THE NBIS (REFERENCE B). THE INSPECTION TYPE REQUIRED FOR EACH STRUCTURE IS LISTED IN THE BRIDGE SCHEDULE . THE A-E SHALL INSPECT AND DETERMINE THE STRUCTURAL CONDITION OF ALL BRIDGE COMPONENTS INCLUDING FRACTURE CRITICAL DETAILS WHEN APPLICABLE. IN ADDITION, THE A-E SHALL DOCUMENT ANY COMPLETED REPAIRS AND NOTE ANY CONDITIONS THAT HAVE CHANGED SINCE PREVIOUS INSPECTION REPORTS. ALL COMPONENTS WILL REQUIRE AN ARM S LENGTH VISUAL INSPECTION USING SIMPLE TOOLS, MEASURING DEVICES, AND RECORDING METHODS. THE A-E SHALL BE RESPONSIBLE FOR PROVIDING ALL ACCESS EQUIPMENT. DURING ROUTINE INSPECTIONS, THE INSPECTION TEAM MUST VERIFY ALL DATA, CORRECT INCONSISTENCIES, AND/OR UPDATE THE DATA ON THE SI&A FORM. UNDERWATER INSPECTION: NOT APPLICABLE FOR THIS TASK ORDER. SCOUR ASSESSMENT: DURING THE INSPECTION PROCESS, THE A-E SHALL OBTAIN ALL PERTINENT DATA REQUIRED TO DETERMINE IF A FULL SCOUR ANALYSES IS WARRANTED. SOUNDINGS OF THE CHANNEL BOTTOM SHALL BE TAKEN AROUND EACH OF THE SUBSTRUCTURE UNITS ACROSS THE CHANNEL, ALONG THE UPSTREAM AND DOWNSTREAM FASCIAS OF THE STRUCTURE AT A MINIMUM. IF DEEMED NECESSARY AT THE TIME OF INSPECTION, ADDITIONAL SOUNDINGS SHOULD BE TAKEN ALONG LINES PARALLEL TO THE UPSTREAM AND DOWNSTREAM FASCIAS. SEISMIC ASSESSMENT: DURING THE INSPECTION PROCESS, THE A-E SHALL OBTAIN ALL PERTINENT DATA REQUIRED TO DETERMINE IF A FULL SEISMIC ANALYSES IS WARRANTED BASED ON CURRENT SEISMIC REQUIREMENTS FOR THE STATE OR GOVERNING REGION. BRIDGE INSPECTION REPORT: BRIDGE INSPECTION REPORTS WILL BE CREATED UTILIZING INSPECTTECH SOFTWARE, THE NAVY S BRIDGE REPORT GENERATION UTILITY. THE A-E WILL POPULATE ALL FIELDS AS APPLICABLE. STRUCTURAL INVENTORY AND APPRAISAL (SI&A) SHEET: THE SI&A SHEET SHALL BE CREATED USING THE INSPECTTECH SOFTWARE AND SHALL CONTAIN ALL ITEMS REQUIRED BY FHWA IN THE LATEST EDITION OF REFERENCE (C). THE SI&A SHALL INCLUDE ALL RELATED MEASUREMENTS IN UNITS OF METERS. ITEM 16 (LATITUDE) AND ITEM17 (LONGITUDE) SHALL BE IN UNITS OF DEGREES, MINUTES, AND SECONDS TO THE NEAREST HUNDREDTH OF A SECOND USING GPS METHODS. INFORMATION ON AVERAGE DAILY TRAFFIC (ADT) MUST BE PROVIDED. SI&A DATA SHALL BE CHECKED WITH THE LATEST VERSION OF THE FHWA EDIT/ UPDATE PROGRAM AND CORRECTIONS TO THE DATA MADE BEFORE SUBMITTAL.
Estimated months remaining until end of performance.
Task order obligations
Period of performance
100% of period elapsed
Awarding Agency
DODEPT OF THE NAVY
Code: 1700
Funding Agency
DODEPT OF THE NAVY
Code: 1700
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|