Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
THE SCOPE OF WORK FOR THIS PROJECT INCLUDES DESIGN FEE TO PROVIDE ALL NECESSARY LABOR, MATERIAL AND RELATED COSTS TO PRODUCE DESIGN DOCUMENTS IN ACCORDANCE WITH THE REQUIREMENTS THAT ARE IDENTIFIED IN THE STATEMENT OF WORK AND ASSOCIATED ATTACHMENTS. THE SCOPE OF WORK FOR THIS PROJECT ALSO INCLUDES ALL LABOR, MATERIAL AND RELATED COSTS REQUIRED TO REPLACE THE EXISTING FREIGHT ELEVATOR LOCATED AT F.945. INCLUDES REPLACEMENT OF ELEVATOR MACHINERY, CONTROLS, DOORS, DOOR CONTROLLERS, PANELS, CAR DOORS AND FINISHES. THE REPAIR EFFORT ALSO INCLUDES OTHER NECESSARY CIVIL, MECHANICAL AND ELECTRICAL INFRASTRUCTURE AND MACHINERY WORK, AND RELATED APPURTENANCES PER THE APPROVED FINAL CONSTRUCTION DOCUMENTS. FINALLY, THE SCOPE OF WORK FOR THIS PROJECT INCLUDES ALL LABOR, MATERIAL AND RELATED COSTS REQUIRED TO REPLACE THE EXISTING PASSENGER ELEVATOR LOCATED AT F.381. INCLUDES REPLACEMENT OF ELEVATOR MACHINERY, CONTROLS, DOORS, DOOR CONTROLLERS, PANELS, CAR DOORS AND FINISHES. THE REPAIR EFFORT ALSO INCLUDES OTHER NECESSARY CIVIL, MECHANICAL AND ELECTRICAL INFRASTRUCTURE AND MACHINERY WORK, AND RELATED APPURTENANCES PER THE APPROVED FINAL CONSTRUCTION DOCUMENTS. PERFORMANCE SHALL BE IN ACCORDANCE WITH THE GENERAL PROVISIONS OF THE BASIC CONTRACT AND THE GOVERNMENT'S STATEMENT OF WORK TO PROJECT MUHJ 10-4012 INCLUDING THE FOLLOWING ATTACHMENTS: AMENDMENTS 01 AND 02. WAGE RATES THE ATTACHED DAVIS BACON WAGE DECISION APPLICABLE TO THIS PROCUREMENT IS GENERAL DECISION NUMBER VA20080018, DATED 20 AUGUST 2010 HEAVY. LIQUIDATED DAMAGES: IN ACCORDANCE WITH FAR CLAUSE 52.211-12, THE LIQUIDATED RATE FOR THIS PROJECT IS ESTABLISHED AT $394.73.
Estimated months remaining until end of performance.
Task order obligations
Period of performance
100% of period elapsed
Awarding Agency
DODEPT OF THE AIR FORCE
Code: 5700
Funding Agency
DODEPT OF THE AIR FORCE
Code: 5700
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|