EMERGENCY NTP TO REPAIR THE AHU/MCC COMPONENTS TO GALLUP FB, NM DUE TO EXTREME HIGH WINDS THAT CAUSE POWER SURGES DAMAGES TO THE MCC COMPONENTS AND CAUSE THE LOSS OF POWER TO AHU TO THE BUILDING.