THE PURPOSE OF THIS REQUIREMENT IS FOR THE CONTRACTOR TO DESIGN A FOUNDATION BASED ON THE GEOTECHNICAL ENGINEERING REPORT, DESIGN A GROUNDING SYSTEM WITH A RECOMMENDED DIAMETER AND DEPTH BASED ON THE LOCATION AND GEOTECHNICAL ENGINEERING REPORT, AND
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
FEFEDERAL EMERGENCY MANAGEMENT AGENCY
Code: 7022
Funding Agency
FEFEDERAL EMERGENCY MANAGEMENT AGENCY
Code: 7022