Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
ENGINEERING OFFICE IT INSTALLATION 1) CC-OPS PROVIDES LIFECYCLE PROJECT MANAGEMENT SERVICES UTILIZING THIER PMO CONSULTANT 2) CC-OPS WILL CONFIGURE AND INSTALL 20-7942 ROUTER SWITCHES 4-7962 ROUTER SWITCHES 1-7937 ROUTER SWITCH CC_OPS WILL PROVIDE ALL REQUIRED FS DOCUMENTATION 3) CC_OPS WILL PROVIDE A LOW-LEVEL DESIGN, DIAL PLAN WORKSHEET, IMPLEMENTATION PLAN AND TEST PLAN IN SUPPORT OF THE IMPLEMENTATION. CC-OPS WILL PROVIDE A CONSULTANT (24HRS) 4) CC-OPS PROVIDES ON-SITE IMPLEMENTATION AS DESCRIBED IN THE DESIGN PLAN AND IMPLEMENTATION PLAN. CC-OPS WILL ALSO INSTALL EQUIPMENT AS INDENTIFIED IN THE HIGH-LEVEL DESIGN OR TSDP AND WILL PROVIDE TESTING AND TRAINING AS DESCRIBED. CC-OPS WILL ALSO PROVIDE KNOWLEDGE TRANSFER DURING THIS PHASE. CONSULTANT (32 HRS) TELECOMMUNICATIONS SPECIALIST II (32 HRS) 5) CC-OPS WILL PROVIDE DAY TWO SUPPORT (ON-SITE), PUNCH LIST MANAGEMENT IF NEEDED, AND COMPLETE THE AS-BUILT DOCUMENTATION. CONSULTANT (24 HRS) 6) MILAGE AND PER DIEM NOT TO EXCEED $5,000.00. 7) TRIPP LITE SMART 2200RMXL2U SMART PRO RACK UPS 8) PATCH CORDS 12 ARROW WIRE&CABLE 5' - BLUE CAT 6 15 ARROW WIRE&CABLE 7' - BLUE CAT 6 24 ARROW WIRE&CABLE 10'- BLUE CAT 6 PRINTER CABLES AS NEEDED. ALL TERMS, CONDITIONS AND PROVISIONS OF GSA CONTRACT # GS-35F-0030U APPLY TO SUBJECT ORDER.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
FSFOREST SERVICE
Code: 12C2
Funding Agency
FSFOREST SERVICE
Code: 12C2
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|