THIS PROJECT IS TO INSPECT BUILDING 1900 ROOF AND EXTERIOR ENVELOPE AND DESIGN REQUIRED REPAIRS TO THE PROJECT. A/E TO DESIGN THE CONSTRUCTION DOCUMENTS REQUIRED TO PROVIDE A FULL BID SET OF DRAWINGS AND SPECIFICATIONS.