Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
IGF::OT::IGF DEMOLITION-- DISCONNECTION FROM ELECTRICAL AND CONTROLS SYSTEM INCLUDING REMOVAL FROM SITE THE EXISTING COILING OVERHEAD DOOR LOCATED AT THE EXISTING DOCK : THE TWO DOORS ARE AS FOLLOWS: EXISTING DOOR A IS 21'-11 1/8 WIDE X 13-11 5/8 HIGH EXISTING DOOR B IS 9'-11" WIDE X 14'-1/2" HIGH NEW WORK-- FURNISH AND INSTALL RYTEC SPIRAL HIGH SPEED DOOR 1 EACH SPIRAL L/R 9-0 WIDE X 9-0 HIGH (DUMPSTER) WITH SPIRAL PAINTED SLATS, STD, RAL7037 DUSTY GREY ONE COLOR (BOTH SIDES-SP UP TO 16'W X 9', NEMA 4X CONTROL BOX STANDARD, ON/OFF KEY SWITCH, PATH WATCH SAFELY SYSTEM AND SPIRAL SLATS, BRACKETS&HARDWARE TO FILL IN UPPER 60" OF OPENING. FURNISH AND INSTALL RYTEC SPIRAL HIGH SPEED DOOR 1 EACH SPIRAL US/R 21'-3" WIDE X 14-0 HIGH (LOADING DOCK) WITH SPIRAL PAINTED SLATS, STD, RAL 7037 DUSTY GREY ONE COLOR (BOTH SIDES-SP UP TO 16" + 26"W X 14', RIGHT HAND MOTOR MOUNT NEMA 4X CONTROL BOX STANDARD, ON/OFF KEY SWITCH, PATH WATCH SAFELY SYSTEM. WORK ON EACH DOOR TO INCLUDE FREIGHT TO WORK SITE UNLOADING, ALL REQUIRED PREPARATION FOR INSTALLATION OF NEW DOORS INCLUDING MECHANICAL, ELECTRICAL&FILLER SLAT INSTALLATION AND FINAL CONNECTION TO EXISTING PUSHBUTTONS FOR ACTIVATION. ALL IN ACCORDANCE WITH QUOTE DATED 7/18/14 THE WORK CAN BE DONE DURING NORMAL BUSINESS HOURS (MF 7:00AM TO 5:00PM. THE GSA WILL PROVIDE NEW ELECTRICAL DISCONNECTS AND NEW LOCATIONS CENTER CONTROL BOXES AND RELOCATION OF EXISTING DUCT FOR A MINIMUM OF 45" FROM GARAGE BAY DOORS TO ALLOW FOR OVERHEAD DOOR INSTALLATION. SAFETY--ALL WORK SHALL COMPLY WITH APPLICABLE STATE AND MUNICIPAL SAFETY AND HEALTH REQUIREMENTS. WHERE THERE IS A CONFLICT BETWEEN APPLICABLE REGULATIONS, THE MOST STRINGENT WILL APPLY. THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY AND LIABILITY FOR COMPLIANCE WITH ALL APPLICABLE REGULATIONS PERTAINING TO THE HEALTH AND SAFETY OF THE PERSONNEL DURING THE EXECUTION OF WORK, AND SHALL HOLD THE GOVERNMENT HARMLESS FOR ANY ACTION ON ITS PART OR THAT OF ITS EMPLOYEES OR SUBCONTRACTORS, WHICH RESULTS IN ILLNESS OR DEATH. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY SAFETY EQUIPMENT AND ENSURE THAT SUCH EQUIPMENT AND ALL RELEVANT SAFETY PROCEDURES ARE ADEQUATE FOR THE JOB BEING PERFORMED AND ARE UTILIZED PROPERLY.
Estimated months remaining until end of performance.
Task order obligations
Period of performance
100% of period elapsed
Awarding Agency
PBPUBLIC BUILDINGS SERVICE
Code: 4740
Funding Agency
PBPUBLIC BUILDINGS SERVICE
Code: 4740
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|