Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
IGF::OT::IGF SWITCHGEAR, DISTRIBUTION EQUIPMENT REPLACEMENT, AND CHILLER REPLACEMENT (RIA00135/RIA00136) 316-320 6TH STREET SIOUX CITY, IA PROJECT DESCRIPTION: THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, THE FOLLOWING: INSTALLATION OF A NEW 480Y/277VAC SERVICE ENTRANCE/MAIN DISTRIBUTION PANEL WITH INTEGRAL 208Y/120VAC STEP-DOWN TRANSFORMER AND 208Y/120VAC DISTRIBUTION PANEL AND THE REPLACEMENT OF THE EXISTING MOTOR CONTROL CENTER (MCC). THIS WORK INCLUDES SOME MINOR BUILDING MODIFICATIONS. THIS WORK INCLUDES SOME MINOR BUILDING MODIFICATIONS. UPGRADE REFRIGERATION EVACUATION SYSTEM, INCLUDING EXHAUST AND MAKE-UP AIR PATHWAYS, TO MEET CURRENT CODE REQUIREMENTS.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
PBPUBLIC BUILDINGS SERVICE
Code: 4740
Funding Agency
PBPUBLIC BUILDINGS SERVICE
Code: 4740
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|