Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
REMOVE THREE (3) EXISTING RETURN AIR DUCTS. PATCH/REPAIR WALL (TO MATCH EXISTING CONSTRUCTION) AT THE REMOVED DUCTS. INSTALL TWO (2) NEW Z-DUCTWORK RETURN AIR PATHWAYS WITH MANBARS AND VIEWPORTS SIZED FOR FLOOR AREA SERVED. PATCH AND REPAIR MISCELLANEOUS HOLES IN THE SUITE DEMISING WALL LOCATED ABOVE THE SUSPENDED CEILING (APPROXIMATELY 4 LOCATIONS). REFINISH EXISTING TAPE JOINTS (TO LEVEL 3 FINISH)AND PAINTING OF BOTH SIDES OF THE SUITES DEMISING WALL LOCATED ABOVE THE SUSPENDED CEILING, IDENTIFIED ON THE DID'S.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
PBPUBLIC BUILDINGS SERVICE
Code: 4740
Funding Agency
FBFEDERAL BUREAU OF INVESTIGATION
Code: 1549
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|