Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
THIS PROJECT WOULD REPLACE TWO (2) BOAT DOCKS HAVING WOODEN FRAMING AND SUBSTRUCTURE WITH METAL FRAMING AND SUBSTRUCTURE. BOTH DOCKS WILL HAVE THE SAME SQUARE FOOT SURFACE AREA FOR BOAT DOCKING, SIMILAR CONFIGURATION AND SIZE OF THE EXISTING DOCK, AND WILL USE THE EXISTING PILINGS AND LOCATION FOR STABILIZATION. EACH DOCK WOULD UTILIZE THE EXISTING CONCRETE ABUTMENTS WITH RECONFIGURING HINGES FOR THE NEW DOCKS. EACH DOCK WILL HAVE AN ADDITIONAL RAMP SEGMENT ADDED FROM THE ABUTMENT TO FACILITATE LESS STEEP ACCESS TO THE DOCK AREA.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
BOBUREAU OF LAND MANAGEMENT
Code: 1422
Funding Agency
BOBUREAU OF LAND MANAGEMENT
Code: 1422
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|