Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
DESIGN AND CONSTRUCTION TO REPLACE AND REHABILITATE SEWER LIFT STATIONS AND SEWER PIPELINES IN THE COLLECTION SYSTEM OF THE APRA HARBOR WASTEWATER TREATMENT PLANT (AHWWTP). ANTIQUATED SEWAGE LIFT STATIONS (SLS) SHALL BE REPLACED WITH NEW FACILITIES THAT FACILITATE OPERATIONS AND MAINTENANCE ACTIVITIES. UPGRADE FACILITIES TO PROVIDE INCREASED CAPACITY AND SYSTEM RELIABILITY. PUMP STATION CONTROLS AND EMERGENCY GENERATORS SHALL BE PLACED IN STRUCTURES HARDENED FOR TYPHOONS. ADD SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) SYSTEM THAT FEEDS BACK TO THE BASE SYSTEM AT THE APRA HARBOR WASTEWATER TREATMENT PLANT TO ALL STATIONS. SUSTAINABLE DESIGN PRINCIPLES WILL BE INTEGRATED INTO THE DESIGN, DEVELOPMENT, AND CONSTRUCTION OF THE UTILITY PLANT BUILDING IN ACCORDANCE WITH EXECUTIVE ORDER 13123 AND OTHER DIRECTIVES. ANTI-TERRORISM FORCE PROTECTION MEASURES ARE NOT REQUIRED FOR THE PROJECT BECAUSE THE STRUCTURES ARE CLASSIFIED AS UNINHABITED.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
DODEPT OF THE NAVY
Code: 1700
Funding Agency
DODEPT OF THE NAVY
Code: 1700
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|