Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
TWO FULLY HYBRIDIZED AND PACKAGED GE:SB349 FOCAL- PLANE ARRAYS THE GOAL OF THIS PROJECT IS TO CONSTRUCT A 32X32 GE:SB FOCAL-PLANE ARRAY (FPA) HYBRIDIZED, BY THE PLANAR BUMP-BOND TECHNIQUE, TO A SB349 CTIA READOUT. AS DEPICTED IN THE FIGURE BELOW. THIS DESIGN IS IDENTICAL TO WHAT IS COMMONLY USED FOR CONSTRUCTING LARGE FORMAT NEAR AND MID INFRARED FPAS BUT HAS NEVER BEEN IMPLEMENTED ON SUCH A SCALE FOR FABRICATING FAR INFRARED FPAS. THE DETECTOR MATERIAL AND THE READOUT ARE BUMP BONDED FACE-TO-FACE AND ARE IN INTIMATE CONTACT AND THE ASSEMBLY IS SUPPORTED BY A SUBSTRATE MADE OF ALUMINA OR OTHER SUITABLE MATERIAL.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
NANATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Code: 8000
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|