Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
THIS PHASE I RESEARCH WILL RESULT IN A PROTOTYPE HIGH TEMPERATURE PRESSURE SENSING CELL BASED ON THE PIEZORESISTIVE PROPERTIES OF PLATINUM:TUNGSTEN ALLOYS. THE ELTRON RESEARCH&DEVELOPMENT SENSOR WILL BE BASED ON A FLEXIBLE, CIRCULAR NICKEL-ALLOY DIAPHRAGM ONTO WHICH THE SENSOR ELECTRODES WILL BE DEPOSITED VIA SPUTTER COATING. A SERIES OF INSULATING AND CONDUCTING THIN-FILMS WILL COMPRISE THE PRESSURE SENSING ELEMENT AND AN INERT PROTECTIVE TOP-COAT WILL PROTECT THE UNDERLYING MATERIALS FROM OXIDIZING/REDUCING ENVIRONMENTS AND POTENTIAL DEGRADATION FROM SPACE WEATHER. THE PROTOTYPE SENSOR WILL MAKE EXCLUSIVE USE OF HIGH-TEMPERATURE MATERIALS IN ORDER TO FACILITATE CONTINUOUS OPERATION IN THE 550 1200 DEG. C RANGE (SIGNIFICANTLY HIGHER THAN CURRENTLY AVAILABLE COMMERCIAL PRESSURE SENSORS). A TECHNOLOGY READINESS LEVEL (TRL) OF 4 WILL BE ACHIEVED BY THE CONCLUSION OF PHASE I. PHASE II RESEARCH WILL PACKAGE THE PROTOTYPE CELL INTO APPROPRIATE HARDWARE WITH ALL OF THE NECESSARY ON-BOARD ELECTRONICS FOR FULL TRANSDUCER OPERATION AND PROCEED TOWARDS TRL 8.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
NANATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Code: 8000
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|