Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
WINDOW FILM DEPOT, INC. IS TO 1 JB 75315.00 75315.00 PROVIDE ALL SUPERVISION, TOOLS, MATERIALS, AND LABOR FOR THE INSTALLATION OF BALLISTIC SAFETY FILM. WINDOW FILM DEPOT, INC. WILL PROVIDE INSTALLATION OF BALLISTIC SAFETY FILM ON ALL WINDOWS IN ACCORDANCE WITH STATEMENT OF WORK (SOW). AN ESTIMATED 10,055.41 SQUARE FEET OF WINDOW GLASS SURFACE IS TO RECEIVE THE 3M BRAND ULTRA PRESTIGE SAFETY AND SECURITY WINDOW FILM #ULTRA PR S70 INSTALLATION AT A COST OF $7.49 PER SQUARE FOOT. APPLICATION WILL BE ON THE FOLLOWING BUILDINGS AND CONNECTING CORRIDORS WINDOWS: BLDG 1 WITH THE EXCEPTION OF WARD 1A, WEST WING, 1ST FLOOR. BLDG 3 CONNECTING CORRIDOR BETWEEN BLDGS 1 AND 2 CONNECTING CORRIDOR BETWEEN BLDGS 1 AND 3 BLDG 7 BLDG 5 BLDG 4 IGF::OT::IGF
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
VAVETERANS AFFAIRS, DEPARTMENT OF
Code: 3600
Funding Agency
VAVETERANS AFFAIRS, DEPARTMENT OF
Code: 3600
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|