THE CONTRACTOR SHALL RE-CIRCUIT AND RE-ARRANGE EXISTING CIRCUITS FROM MAIN SWITCHBOARD (MSB) AND RECONNECT CIRCUITRY TO EXISTING DISTRIBUTION PANELBOARD DPH, SO THE ENTIRE BUILDING POWER LOAD CAN BE BACKED UP 100% BY THE EXISTING GENERATOR.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed