Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
TAS::96 3135::TAS CONSTRUCTION OF WATER TREATMENT, NITRATE REMOVAL FACILITY AND POTABLE WATER STORAGE TANK AT CHARBONNEAU PARK, ICE HARBOR DAM, BURBANK, WASHINGTON. THE 24'X 28' MASONRY STRUCTURE WILL HOUSE A BOOSTER PUMP STATION WITH PRESSURE TANK, AIR COMPRESSOR AND DRYER, ONE (1) 300GPH REVERSE OSMOSIS UNIT, TABLET CHLORINATOR, LIMESTONE CONTACTOR, ANTI-SCALANT DRUM AND METERING PUMP AND OTHER MISCELANEOUS ITEMS. THE POTABLE WATER STORAGE TANK WILL BE A ROOFED 20' ROUND, 20' HIGH REINFORCED CONCRETE STRUCTURE.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
DODEPT OF THE ARMY
Code: 2100
Funding Agency
DODEPT OF THE ARMY
Code: 2100
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|