Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
IGF::OT::IGF REPAIR BRAKES ON MANITOWOC CRANE FOR THE ILLINOIS WATERWAY WHICH IS USED ON CRANE BARGE 9. THE CONTRACTOR SHALL REMOVE FRONT PLANETARY AND REPLACE BRAKE ASSEMBLY, BEARINGS, O RINGS AND SEALS. REMOVE FRONT DRUM ASSEMBLY AND BRAKE, RELINE BRAKE AND REPLACE BEARINGS AND SEALS. REMOVE REAR PLANETARY AND RESEAL OUTPUT SHAFT, REPLACE BEARINGS AND BRAKE ASSEMBLY. CHECK ALL SHAFT RETAINERS. REASSEMBLE BOTH PLANETARY AND FRONT DRUM AND TEST UNIT FOR PROPER OPERATION.
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
DODEPT OF THE ARMY
Code: 2100
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|