Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW.
Estimated months remaining until end of performance.
Task order obligations
Period of performance
100% of period elapsed
Awarding Agency
DODEPT OF THE ARMY
Code: 2100
Funding Agency
DODEPT OF THE AIR FORCE
Code: 5700
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|