Average obligated amount per year since period start.
Portion of total contract value already obligated.
Share of total value represented by subawards.
IGF::OT::IGF SZCQ139905: CONSTRUCT ADDITIONS TO AND ALTER EXISTING AIRFIELD PAVEMENTS AND HYDRANT SYSTEMS TO ACCOMMODATE THE KC-46A. REPAIR SUPPORTING UTILITIES, INFRASTRUCTURE AND PAVEMENTS. ALTER HYDRANT SYSTEM FOR 8 FUEL PITS AND HYDRANTS, MARK PAVEMENTS AND INSTALL REQUIRED GROUNDING POINTS. THE WORK INCLUDES: MINOR EARTHWORK AND GRADING; FUELING SYSTEM REPAIR AND CONSTRUCTION; PAVEMENT DEMOLITION AND REPAIR OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALTIC PAVEMENTS; AND AIRFIELD STRIPING AND MARKING. SZCQ152910: REPAIR AIRCRAFT PARKING APRON TO INCLUDE REPLACEMENT OF 14 INCH THICK CONCRETE APRON WITH HIGH FLEXURAL STRENGTH PC CONCRETE, REPLACEMENT OF 42 INCH STORM DRAINAGE SYSTEM. INCLUDES PAVEMENT MARKING (TAXIWAY, DRIVING LANES, RESTRICTED AREA, STOP BLOCKS AND RESTRICTED AREA SIGNS) AND JOINT SEALANT. THE WORK INCLUDES: MINOR EARTHWORK AND GRADING; PAVEMENT DEMOLITION AND REPAIR OF PORTLAND CEMENT CONCRETE (PCC); AND AIRFIELD STRIPING AND MARKING. LOCATION OF CONSTRUCTION: PEASE AIR NATIONAL GUARD BASE 302 NEWMARKET STREET NEWINGTON, NH 03803
Task order obligations
Estimated months remaining until end of performance.
Period of performance
100% of period elapsed
Awarding Agency
DODEPT OF THE ARMY
Code: 2100
Funding Agency
DODEPT OF THE AIR FORCE
Code: 5700
Loading contract activity data...
Modification ID | Description | Action Date | Obligated Amount | Action Type |
|---|---|---|---|---|
Subaward # | Subawardee | Description | Amount | Action Date |
|---|---|---|---|---|