• ⌘ + K
  • Home
  • 0
    Inbox
Explore
  • Browse All
  • Health
  • FedCiv
  • Defense
  • Events
Work
  • Teaming Hub
  • Watchlists
  • Bookmarks
  • Notes
Research
  • Grants
    • Contracts
    • Vehicles
    • OTAs
    • OTIDVs
  • Agencies
  • NAICS
  • PSC
  • DOGE Tracker

Federal Contract Awards

266awards

Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.

PSC Codes
is
Award ID
Description
Recipient
Total Value
Awarding Agency
Funding Agency
Set Aside
NAICS
PSC
Award Date
Start Date
End Date
80NSSC20P1871
THIS IS FOR LUNAR SUIT IMPACT ANALYSIS OF ACTIVE RESPONSE GRAVITY OFFLOAD SYSTEM (ARGOS), TESTING SUPPORT, SAFE FALLS OF HUMAN TEST SUBJECTS IN THE NASA/ARGOS FACILITY PER THE ATTACHED QUOTE 08192020.VIRGINIA POLYTECHNIC INSTITUTE & STATE UNIVERSITY$46,468NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541380Testing Laboratories and ServicesAR25Sep 28, 2020Sep 28, 2020Jul 31, 2022
FA880820C0045
ACCELERATOR FOR SPACE PROGRAMSSTARBURST ACCELERATOR, LLC$249,900DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—541990All Other Professional, Scientific, and Technical ServicesAR25Jul 20, 2020Jul 20, 2020Mar 31, 2021
75D30119P05831
IBM/WEATHER CHANNEL MOBILE WEATHER APPLICATIONINTERNATIONAL BUSINESS MACHINES CORPORATION$52,000CENTERS FOR DISEASE CONTROL AND PREVENTIONCENTERS FOR DISEASE CONTROL AND PREVENTION—541511Custom Computer Programming ServicesAR25Sep 12, 2019Sep 11, 2019Sep 28, 2021
FA865019C9212
SMALL PIXEL SENSORS FOR SPACEATTOLLO ENGINEERING, LLC$1,497,877DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)AR25Apr 29, 2019Apr 29, 2019Aug 23, 2021
80ARC018C0002
IGF::OT::IGF THE PHASE A EFFORT FOR SAO WILL CONSIST OF DETAILED DEFINITION OF THE MISSION INCLUDING THE SCIENCE INSTRUMENT, SPACECRAFT, GROUND STATION, AND SCIENCE DATA PROCESSING AND PIPELINE. PROGRAM PLANS WILL BE PREPARED AND DETAILED RISK ASSESSMENTS WILL BE PERFORMED ON ALL TECHNICAL AND SCHEDULE ASPECTS OF THE PROGRAM. THIS EFFORT WILL INCLUDE WORK BY PARTNERS AMES RESEARCH CENTER (ARC), ORBITAL ATK (OATK), THE MASSACHUSETTS INSTITUTE OF TECHNOLOGY (MIT) AND PENN STATE UNIVERSITY (PSU). SAO WILL PREPARE SUBCONTRACTS FOR MIT AND PSU UPON AWARD NOTIFICATION. THE PRIMARY GOAL OF THE PHASE A EFFORT IS TO PRODUCE A CSR TO SUBMIT TO THE EXPLORERS PROGRAM OFFICE. THE CSR WILL INCLUDE A DETAILED SCHEDULE, BUDGET AND COST PROPOSAL COVERING PROJECT PHASES B/C/D/E, IN ADDITION TO IN-DEPTH TECHNICAL CONTENT. ARCUS IS AN X-RAY GRATING SPECTROSCOPY EXPLORER MISSION. THE ARCUS MISSION IS MANAGED BY NASA AMES RESEARCH CENTER (ARC), WITH THE PRINCIPAL INVESTIGATOR AT THE SMITHSONIAN ASTROPHYSICAL OBSERVATORY (SAO). ARCUS CONSISTS OF AN X-RAY TELESCOPE, PROVIDED BY SAO, INTEGRATED WITH A SPACECRAFT, PROVIDED BY ORBITAL-ATK (OATK). THE INTEGRATION AND ENVIRONMENTAL TESTING OF THE COMBINED SPACECRAFT AND TELESCOPE (I.E. OBSERVATORY) IS THE RESPONSIBILITY OF OATK. THE ARCUS MISSION INCLUDES THE DESIGN, PRODUCTION, TEST, INTEGRATION, LAUNCH, COMMISSIONING AND SCIENCE OPERATIONS OF THE OBSERVATORY, AS DESCRIBED IN THE SAO PROPOSAL TITLED: ARCUS- EXPLORING THE FORMATION AND EVOLUTION OF CLUSTERS, GALAXIES, AND STARS.SMITHSONIAN INSTITUTION$25,707,537NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)AR25Nov 28, 2017Nov 28, 2017Jun 30, 2019
80ARC018C0001
IGF::OT::IGF OATK SUPPORT FOR ARCUS PHASE A ARCUS IS AN X-RAY GRATING SPECTROSCOPY EXPLORER MISSION. THE ARCUS MISSION IS MANAGED BY NASA AMES RESEARCH CENTER (ARC), WITH THE PRINCIPAL INVESTIGATOR AT THE SMITHSONIAN ASTROPHYSICAL OBSERVATORY (SAO). ARCUS CONSISTS OF AN X-RAY TELESCOPE, PROVIDED BY SAO, INTEGRATED WITH A SPACECRAFT, PROVIDED BY ORBITAL-ATK (OATK). THE INTEGRATION AND ENVIRONMENTAL TESTING OF THE COMBINED SPACECRAFT AND TELESCOPE (I.E. OBSERVATORY) IS THE RESPONSIBILITY OF OATK. THE ARCUS MISSION INCLUDES THE DESIGN, PRODUCTION, TEST, INTEGRATION, LAUNCH, COMMISSIONING AND SCIENCE OPERATIONS OF THE OBSERVATORY, AS DESCRIBED IN THE SAO PROPOSAL TITLED: ARCUS- EXPLORING THE FORMATION AND EVOLUTION OF CLUSTERS, GALAXIES, AND STARS.ORBITAL SCIENCES LLC$550,037NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)AR25Oct 25, 2017Oct 25, 2017Jun 30, 2019
F17STO4000000366482
IGF::OT::IGFPRESIDENT AND FELLOWS OF HARVARD COLLEGE$27,630SMITHSONIAN INSTITUTIONSMITHSONIAN INSTITUTION—611310Colleges, Universities, and Professional SchoolsAR25Dec 22, 2016Dec 22, 2016May 31, 2017
NNG16PX48C
IGF::OT::IGF NASA RESEARCH ANNOUNCEMENT AWARD FOR EFFORT TITLED: BETTII:THE BALLOON EXPERIMENTAL TWIN TELESCOPE FOR INFRARED INTERFEROMETRY (PHASE 2) THE BALLOON EXPERIMENTAL TWIN TELESCOPE FOR INFRARED INTERFEROMETRY (BETTII) IS AN EIGHT-METER BASELINE FAR-INFRARED INTERFEROMETER TO FLY ON A HIGH ALTITUDE BALLOON. THE COMBINATION OF THE LONG BASELINE WITH A DOUBLE-FOURIER INSTRUMENT ALLOWS BETTII TO SIMULTANEOUSLY GAIN BOTH SPATIAL AND SPECTRAL INFORMATION; BETTII IS DESIGNED FOR SPATIALLY-RESOLVED SPECTROSCOPY. THE UNIQUE DATA OBTAINED WITH BETTII WILL BE VALUABLE FOR UNDERSTANDING HOW STARS FORM WITHIN DENSE CLUSTERS, BY ISOLATING INDIVIDUAL OBJECTS THAT ARE UNRESOLVED BY PREVIOUS SPACE TELESCOPES AND MY MEASURING THEIR SPECTRAL ENERGY DISTRIBUTIONS. BETTII WILL BE ALSO USED IN FUTURE FLIGHTS TO UNDERSTAND THE PROCESSES IN THE CORES OF ACTIVE GALACTIC NUCLEI. IN ADDITION TO THESE SCIENTIFIC GOALS, BETTII SERVES AS A MAJOR STEP TOWARDS ACHIEVING THE VISION OF SPACE-BASED INTERFEROMETRY.GLOBAL SCIENCE & TECHNOLOGY, LLC$39,268NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541712AR25Aug 9, 2016Aug 9, 2016Sep 30, 2016
NNM14AB60D
IGF::OT::IGF ENGINEERING AND INTEGRATION WORK FOR MATERIAL SCIENCE RESEARCH RACK (MSRR), MICROGRAVITY SCIENCE GLOVEBOX (MSG) AND INTERNATIONAL SPACE STATION SERVIR ENVIRONMENTAL RESEARCH AND VISUALIZATION SYSTEM (ISERV) THIS DELIVERY ORDER COVERS WORK FOR MSFC MANAGED FACILITIES AND PAYLOADS. THE FACILITIES CONSIST OF THE MICROGRAVITY SCIENCES GLOVEBOX (MSG) AND THE MATERIALS SCIENCE RESEARCH RACK 1 (MSRR-1). THE PAYLOADS CONSIST OF THE INTERNATIONAL SPACE STATION (ISS) SERVIR ENVIRONMENTAL RESEARCH AND VISUALIZATION (ISERV) PATHFINDER, WHICH IS CURRENTLY OPERATING IN THE WINDOW OBSERVATIONAL RESEARCH FACILITY (WORF). THE MICROGRAVITY SCIENCE GLOVEBOX (MSG), LOCATED IN THE UNITED STATES (U.S.) DESTINY LABORATORY MODULE, ENABLES SCIENTISTS FROM MULTIPLE DISCIPLINES TO PARTICIPATE ACTIVELY IN THE ASSEMBLY AND OPERATION OF EXPERIMENTS IN SPACE WITH MUCH THE SAME DEGREE OF INVOLVEMENT THEY HAVE IN THEIR OWN RESEARCH LABORATORIES. DEVELOPED BY THE EUROPEAN SPACE AGENCY (ESA) AND MANAGED BY THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION S (NASA'S) MARSHALL SPACE FLIGHT CENTER (MSFC). THE MSG WAS LAUNCHED ON THE SPACE SHUTTLE ENDEAVOR, STS-111, ISS FLIGHT UF2, IN JUNE 2002. THIS FACILITY OFFERS AN ENCLOSED 255-LITER (9 CUBIC FOOT) WORK AREA ACCESSIBLE TO THE CREW THROUGH GLOVE PORTS AND TO GROUND-BASED SCIENTISTS THROUGH REAL-TIME DATA LINKS AND VIDEO. BECAUSE THE WORK AREA IS SEALED AND HELD AT A NEGATIVE PRESSURE, THE CREW CAN MANIPULATE EXPERIMENT HARDWARE AND SAMPLES WITHOUT THE DANGER OF SMALL PARTS, PARTICULATES, FLUIDS, OR GASSES ESCAPING INTO THE OPEN LABORATORY MODULE. THE MATERIALS SCIENCE RESEARCH RACK (MSRR) LAUNCHED ABOARD SPACE SHUTTLE ATLANTIS ON STS -128 ON AUGUST 28, 2009. MSRR ALLOWS FOR STUDY OF A VARIETY OF MATERIALS INCLUDING METALS, CERAMICS, SEMICONDUCTOR CRYSTALS AND GLASS ABOARD THE ISS. MSRR IS HOUSED IN THE U.S. DESTINY LABORATORY MODULE. MATERIALS SCIENCE IS AN INTEGRAL PART OF DEVELOPMENT OF NEW MATERIALS FOR EVERYDAY LIFE HERE ON EARTH. THE DEVELOPMENT OF THE RESEARCH RACK WAS A COOPERATIVE EFFORT BETWEEN THE MARSHALL CENTER AND THE EUROPEAN SPACE AGENCY. THE MATERIALS BEING STUDIED ARE FLOWN AND PROCESSED IN SAMPLE CARTRIDGE ASSEMBLIES (SCAS). DEVELOPMENT OF NEW SCAS IS CURRENTLY UNDERWAY. THE ISERV PATHFINDER LAUNCHED ON JULY 21, 2012 ABOARD HTV-3. THE ISERV SUB-RACK PAYLOAD IS AN EARTH OBSERVING HIGH-RESOLUTION SYSTEM BASED PRIMARILY ON MODIFIED COMMERCIAL OFF-THE-SHELF (COTS) COMPONENTS, WHICH WERE DEVELOPED BY THE NASA-SERVIR PROJECT FOR OPERATION IN THE WORF RACK. THE NASA-SERVIR PROJECT SUPPORTS HUMANITARIAN AID AND DISASTER RESPONSE FOR DEVELOPING NATIONS BY PROVIDING EARTH SCIENCE INFORMATION AND DECISION SUPPORT DATA PRODUCTS. CURRENTLY, SERVIR DOES NOT OWN/CONTROL ANY EARTH OBSERVATION RESOURCES AND MUST TASK COMMERCIAL AND PUBLIC ASSETS FOR DATA ACQUISITION RESULTING IN DELAYS AND MISSED OPPORTUNITIES. THE ISERV PAYLOAD IS THE FIRST STEP IN MITIGATING THIS SITUATION. ISERV IS A PATHFINDER PAYLOAD CHARACTERIZED AS A DEVELOPMENTAL FLIGHT TEST WITH THE PRIMARY PURPOSE OF DEVELOPING OPERATIONAL EXPERIENCE WITH AN ISS-BASED REMOTE SENSING SYSTEM. THE EXPERIENCE GAINED WITH ISERV WILL FACILITATE THE DEVELOPMENT AND IMPLEMENTATION OF AN OPERATIONAL EXTERNALLY MOUNTED IMAGING SYSTEM ABOARD THE ISS. THE PRIMARY OBJECTIVES OF THE ISERV PATHFINDER PAYLOAD INCLUDE: A. DEVELOPMENT OF GENERAL TASKING, UTILIZATION, GROUND COMMANDING, DATA ACQUISITION, AND PROCESSING EXPERIENCE. B. DEVELOPMENT OF IMAGE ACQUISITION, PROCESSING, AND ANALYSIS CAPABILITIES. C. DEVELOPMENT OF FULL COMMANDING, ACQUISITION, AND PROCESSING OPERATIONS CAPABILITIES FOR ISERV HUMANITARIAN AID AND DISASTER MONITORING AND ASSESSMENT OPERATIONAL REQUIREMENTS. D. INFORMING THE DEFINITION OF REQUIREMENTS APPLICABLE FOR A POTENTIAL EXTERNALLY MOUNTED ISERV IMAGING SYSTEM. E. APPLICATION OF ACQUIRED IMAGES FOR SERVIR PURPOSES.TELEDYNE BROWN ENGINEERING, INC.$38,365,366NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541712AR25Mar 31, 2014Apr 1, 2014Apr 13, 2019
FA880214C0001
IGF::CL::IGF AEROSPACE FFRDC CONTRACT FROM 1 OCT 2013 TO 30 SEPT 2018THE AEROSPACE CORPORATION$4,384,421,827DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—541712AR25Oct 1, 2013Oct 1, 2013Jan 19, 2019
F12STO4000000242589
SCIENTIFIC RESEARCHPRESIDENT AND FELLOWS OF HARVARD COLLEGE$24,000SMITHSONIAN INSTITUTIONSMITHSONIAN INSTITUTION—541712AR25Dec 5, 2011Dec 5, 2011Sep 30, 2012
NNK10EA98P
ASTROBOTICS HAS APPROACHED ISRU ABOUT A PAYLOAD FOR THEIR X-PRIZE MISSION TO A LUNAR REGION WHERE ICE IS BELIEVED TO LIE UNDER METER OF SOIL. WE PROPOSE TO DEVELOP A METHOD OF INSERTING A SENSOR THROUGH THE SOIL/ICE TO VERIFY THE PRESENCE, NATURE, AND CONCENTRATION OF ICE, WHICH WILL REVOLUTIONIZE SPACE EXPLORATION. THE TECHNOLOGY TO INSERT THE SENSOR WILL LIKEWISE BE REVOLUTIONARY. WE WILL USE A COMBINATION OF MECHANICAL PERCUSSION AND/OR GAS-PULSING. PRELIMINARY TESTS INDICATE EITHER WILL EASILY CUT THROUGH THE ICY REGOLITH, SO THAT EVEN A VERY LIGHTWEIGHT ROVER IN 1/6 GEE WILL HAVE ADEQUATE WEIGHT TO DO THE INSERTION. HOWEVER, THE PRESENCE OF ICE CREATES SIGNIFICANT UNCERTAINTY, WHICH WILL BE ADDRESSED IN THIS RESEARCH. WE WILL INVESTIGATE WHETHER AN ULTRASONIC PIEZOELECTRIC WAFER IS NEEDED NEAR THE TIP TO CUT THROUGH ROCK AND ICE, OR A HEATER IS NEEDED TO MELT THROUGH ICE. A STRAIN CELL WILL EXTRACT FORCE DATA, PROVIDING AN INFERENCE OF ICE CONTENT AT ALL DEPTHS. THE COMPANION PROPOSAL (ISDS FOR WATER DETECTION ON THE LUNAR SURFACE) WILL DEVELOP THE DIELECTRIC/THERMAL SENSOR TO POSITIVELY IDENTIFY THE ICE. OUTLINE OF EACH OF THE SPECIFIC TASKS: 1. PREPARE ICE-SIMULANT MIXTURES, USING VIBRATIONAL COMPACTORS TO ACHIEVE LUNAR SOIL DENSITIES AND A LIQUID NITROGEN BATH TO FREEZE THE MIXTURE TO CRYOGENIC TEMPERATURES. 2. MEASURE BULK DENSITY AND ICE CONTENT, AND TEST MECHANICAL STRENGTH USING A STANDARD CONE PENETROMETER AND SHEAR VANE APPARATUS 3. MODIFY PROCEDURE UNTIL SEVERAL ICE CONTENT/DENSITY STATES CAN BE REPEATEDLY ACHIEVED. 4. MODIFY EXISTING, INSTRUMENTED CONE PENETROMETER TO INCLUDE GAS PULSING AND PERCUSSION AND VERIFY OPERATION ON DRY SOIL (NO ICE). 5. PERFORM TESTING ON ICY REGOLITH AND MODIFY PULSING/PERCUSSION PARAMETERS TO MINIMIZE PENETRATION RESISTANCE. 6. REPEAT TESTING ON SEVERAL SOIL MIXTURES TO OBTAIN CORRELATION OF MECHANICAL DATA WITH ICE CONTENT/DENSITY. 7. WRITE A FINAL REPORT.HONEYBEE ROBOTICS, LTD.$0NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541712AR25Aug 2, 2010Aug 2, 2010Sep 30, 2010
NNJ10HC33P
SBIR PHASE III- BUILD ANOTHER PRE-PROTOTYPE THAT DEMONSTRATES IN SERIES ELECTROLYSIS AND SABATIER REACTORS WITH ENOUGH DATA TO ASCERTAIN CONVERSION IN A NOMINAL CASE. HUMAN SPACE EXPLORATION REQUIRES TWO THINGS: 1) PROVIDING CONSUMABLE RESOURCES (SUCH AS OXYGEN AND WATER) TO SUSTAIN HUMAN LIFE, 2) MAINTAINING A HABITABLE ENVIRONMENT THROUGH CONTROL OF METABOLICALLY PRODUCED CARBON DIOXIDE (CO2). OXYGEN IS TYPICALLY PROVIDED TO A SPACECRAFT DIRECTLY FROM TANKS CARRIED ON THE VEHICLE OR BY ELECTROLYZING WATER (ALSO CARRIED IN TANKS ON THE VEHICLE), BUT THIS METHOD OF DELIVERY IS LARGE AND HEAVY, ADDING SIGNIFICANTLY TO LAUNCH MASS. AFTER A COUPLE WEEKS, THE MASS FOR CARRYING THE NECESSARY RESOURCES FOR THE CREW BECOMES TOO GREAT AND OXYGEN EITHER NEEDS TO BE RESUPPLIED OR REGENERATED. NON-REGENERABLE METHODS OF CO2 REMOVAL, LIKE LITHIUM HYDROXIDE, ARE BULKY AND REQUIRE A LOT OF MASS BOTH IN LAUNCH WEIGHT (AS THE CO2 REMOVAL DEVICE) AND RETURN WEIGHT (AS EXPENDED CARTRIDGE WASTE). CURRENT METHODS OF REGENERABLE SYSTEMS EMPLOY SILVER OXIDE, SOLID AMINES, AND MOLECULAR SIEVES ALL OF WHICH VENT THE CO2 TO SPACE VACUUM. THEREFORE, IN ORDER TO REDUCE LAUNCH MASS OF THE LIFE SUPPORT SYSTEMS, REDUCE THE AMOUNT OF RESUPPLY TO LONG DURATION HABITATS (LIKE THE INTERNATIONAL SPACE STATION (ISS)), AND ALLOW FOR LONG-TERM CREWED SPACE EXPLORATION, OXYGEN MUST BE RECOVERED FROM EXPIRED CO2 (AS WELL AS METABOLICALLY PRODUCED WATER VAPOR). IN 2006, PARAGON SPACE DEVELOPMENT CORPORATION WAS AWARDED SBIR PHASE 1 (NNJ06JD56C), AND SUBSEQUENT PHASE 2 (NNJ07JA12C), CONTRACT TO DEVELOP A SOLID OXIDE ELECTROLYSIS (SOE) SYSTEM FOR DEMONSTRATION ON ISS AND FOR FUTURE PROGRAMS. WHILE SOE ITSELF IS NOT A NOVEL TECHNOLOGY, PARAGON SPACE DEVELOPMENT CORPORATION HAS INTEGRATED SOE WITH A SABATIER REACTOR IN ORDER TO CREATE AN OXYGEN PRODUCTION SYSTEM WITH NO MOVING PARTS, COMPARABLE ENERGY USAGE TO STATE OF THE ART SYSTEMS, AND NO HYDROGEN HANDLING, PUMPING, OR PHASE SEPARATION ISSUES. THE SBIR PHASE 2 CONTRACT, NNJ07JA12C, ENDS MARCH 31, 2010. HOWEVER, DUE TO THE DIFFICULT NATURE OF SEALING THE INDEPENDENT FUNCTIONS WITHIN A SINGLE UNIT THAT OPERATES AT TEMPERATURES BETWEEN 750 DEG C TO 900 DEG C, THE DESIRED CAPABILITIES OF THE 100% OXYGEN REGENERATION SYSTEM HAVE NOT YET BEEN ACHIEVED. A FOLLOW-ON SBIR PHASE III CONTRACT WITH PARAGON SPACE DEVELOPMENT CORPORATION IS NEEDED TO EXTEND THE DEVELOPMENT PREVIOUSLY PERFORMED OF THIS SYSTEM.PARAGON SPACE DEVELOPMENT CORPORATION$0NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541712AR25Mar 29, 2010Mar 29, 2010Nov 12, 2010
FA880209C0001
AEROSPACE FFRDC CONTRACTTHE AEROSPACE CORPORATION$4,362,651,400DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—541712AR25Oct 31, 2008Oct 31, 2008Sep 30, 2018
NND06PS01C
THE SUPPLIER SHALL COMPLY WITH ALL REQUIREMENTS IN THE SOFIA CAVITY DOOR DRIVE SYSTEM, TECHNICAL SPECIFICATION AND REQUIREMENTS, DOCUMENT NUMBER USRA-DAL-1163-00 (LATEST REVISION) THE SUPPLIER SHALL FURNISH ALL LABOR, MATERIALS, TOOLS AND PERFORM ALL OPERATIONS NECESSARY FOR THE ENGINEERING, DETAILING, FABRICATION, INSPECTION, TESTING, VALIDATION, DOCUMENTATION AND DELIVERY OF THE UPPER RIGID DOOR (URD) AND APERTURE ASSEMBLY (AA)/LOWER FLEXIBLE DOOR (LFD) ACTUATOR UNITS AND CONTROL UNIT. THE CONTRACTOR SHALL HAVE COMPLETE RESPONSIBILITY FOR ALL EQUIPMENT AND ACCESSORIES INCLUDED IN THIS SPECIFICATION. THIS RESPONSIBILITY SHALL INCLUDE THE VERIFICATION OF DATA FURNISHED BY THE MANUFACTURER OF CONTRACTOR PROCURED COMPONENTS. THE CAVITY DOOR DRIVE SYSTEM SHALL MEET THE OVERALL DESIGN REQUIREMENTS AS SPECIFIED IN THE SOFIA CAVITY DOOR DRIVE SYSTEM TECHNICAL SPECIFICATION AND REQUIREMENTS, DOCUMENT NUMBER USRA-DAL-1163-00. THE SYSTEM SHALL BE DESIGNED, FABRICATED, ASSEMBLED AND TESTED. AS A MINIMUM THE URD AND AA/LFT ACTUATION SYSTEM SHALL INCLUDE: MOTORS, PLANETARY GEAR REDUCTION AND IDLER GEAR, COMMUTATION AND CONTROL FEEDBACK DEVICES AS REQUIRED. PACKAGING INTO LINE REPLACEABLE UNIT(S) (LRU) SHALL BE DETERMINED IN THE DESIGN CYCLE AND FINALIZED BY THE PDR. THE DESIGN SHALL CONSIDER EASE OF MAINTENANCE, INSPECTION AND REPLACEMENT OF EQUIPMENT AND SOFTWARE AS FOLLOWS: (1) ADEQUATE ACCESS FOR THE INSPECTION, SERVICE, MAINTENANCE, AND REPLACEMENT OF LRUS. (2) FULLY INTERCHANGEABLE COMPONENTS. (3) THE DESIGN SHALL REQUIRE NO SCHEDULED OVERHAUL OF COMPONENTS AND MINIMAL SCHEDULED MAINTENANCE OR SERVICE TO MAINTAIN OPERATION WITHIN THE SPECIFIED PERFORMANCE REQUIREMENTS. (4) THE DESIGN SHALL PROVIDE FOR ON-AIRCRAFT ISOLATION OF COMPONENT FAILURES AND VERIFICATION OF SYSTEM AND COMPONENT FAULTS USING EITHER AIRCRAFT OR EXTERNAL POWER. (5) THE DESIGN SHALL ALLOW ON-AIRCRAFT MAINTENANCE TO BE PERFORMED USING COMMON TOOLS AND/OR SUPPORT EQUIPMENT CONSISTENT WITH THE SUPPORT RESOURCES AVAILABLE AT THOSE AIRPORTS COMPATIBLE WITH THE OPERATION OF THE AIRCRAFT. (6) ANY SPECIAL TOOLS REQUIRED FOR INSTALLATION OR REMOVAL SHALL BE FULLY DETAILED IN THE DESIGN. (7) THE DESIGN SHALL CONTAIN FEATURES THAT ELIMINATE THE POSSIBILITY OF INCORRECT INSTALLATION, OR THE INADVERTENT CROSSING OF CONNECTIONS. (8) THE SOFTWARE SHALL BE OF A MODULAR DESIGN AND ALL COMPONENTS OF THE DEVELOPMENT AND VERIFICATION ENVIRONMENT IDENTIFIED. THE SUPPLIER SHALL ASSIST NASA IN PLANNING AND CONDUCTING A MAINTAINABILITY DEMONSTRATION TO VERIFY THAT THE SPECIFIED MAINTAINABILITY REQUIREMENTS HAVE BEEN MET. THE MAINTAINABILITY DEMONSTRATION SHALL BE PLANNED AND SCOPED TO: (1) DISCLOSE POTENTIAL PROBLEM AREAS IN THE DESIGN THAT COULD AFFECT THE MAINTAINABILITY AND SUPPORT OF THE FIELDED SYSTEM (2) VALIDATE ON-AIRCRAFT AND OFF-AIRCRAFT MAINTENANCE CONCEPTS AND REPAIR PROCEDURES REQUIRED TO SUCCESSFULLY OPERATE THE SYSTEM (3) VALIDATE GROUND SUPPORT EQUIPMENT REQUIREMENTS AND THE NUMBER OF PERSONNEL AND SPECIAL SKILLS REQUIRED FOR MAINTENANCE PUBLICATIONS AND TRAINING DATA THE SUPPLIER SHALL INSTALL ON, AND THEN REMOVE FROM, AN AIRCRAFT MOCK-UP, DEVELOPMENT FIXTURE OR PRODUCTION AIRCRAFT ONE OF EACH TYPE OF PRODUCTION UNITS TO VALIDATE INSTALLATION PROCEDURES AND ON-AIRCRAFT MAINTAINABILITY REQUIREMENTS.MPC PRODUCTS CORPORATION$13,311,823NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—336413Other Aircraft Parts and Auxiliary Equipment ManufacturingAR25Feb 8, 2007Feb 8, 2007Jun 30, 2012
NNJ06HG15G
AGGIE SAT2: AUTONOMOUS RENDEZVOUS AND DOCKINGTEXAS A&M ENGINEERING EXPERIMENT STATION$650,000NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION——AR25Sep 28, 2006Sep 28, 2006Sep 30, 2016
NNJ06HF81D
WING LEADING EDGE APPL/ENHANCED WIDEBAND MICRO-TRI-AXIAL ACCELEROMETER UNIT (EWBMTAU) L91 LITHIUM/IRONINVOCON, INC.$68,772NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesAR25Sep 25, 2006Sep 25, 2006Dec 31, 2007
0011
ENGINEERING SERVICES, CET 06-649, LUNAR CRATER OBSERVATION AND SENSING SATELLITE (LCROSS) SHEPHERD SPACECRAFT.NORTHROP GRUMMAN SYSTEMS CORPORATION$8,800,801DEFENSE MICROELECTRONICS ACTIVITY (DMEA)NATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541710AR25Sep 22, 2006Sep 22, 2006Mar 31, 2008
FA880206M0001
200610!000285!5700!FA8802!SMC/PKR !FA880206M0001 !A!N! !N! ! !20060802!20060930!009553637!009553637!009553637!N!THE AEROSPACE CORPORATION !2350 E EL SEGUNDO BLVD !EL SEGUNDO !CA!90245!22412!037!06!EL SEGUNDO !LOS ANGELES !CALIFORNIA!+000000105426!N!N!000000000000!AR25!RDTE/SPACE-SCIENCE APPLICATIONS-ENG/MANUF DEVEL !A2 !MISSILE AND SPACE SYSTEMS !000 !NOT DISCERNABLE !541710!E! !9! ! ! ! ! !99990909!C! ! !N!Z!A!N!J!1!001! ! !Z!N!Z! ! !N!Z!N! ! ! ! ! !A!A!000!A!B!N! ! ! ! ! ! !0001! !THE AEROSPACE CORPORATION$0DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—541710AR25Aug 2, 2006Aug 2, 2006—
NNK06MB61P
MODULE DEVELOPMENTQUEST TECHNICAL SOLUTIONS$90,000NATIONAL AERONAUTICS AND SPACE ADMINISTRATION——334290Other Communications Equipment ManufacturingAR25Jul 25, 2006Jul 25, 2006Jan 24, 2008
NNG06HX20C
THE CONTRACTOR WILL DEVELOP A PROTOTYPE RADAR HIGH-ALTITUDE IMAGING WIND AND RAIN AIRBORNE PROFILER (HIWRAP)REMOTE SENSING SOLUTIONS, INC.$0NATIONAL AERONAUTICS AND SPACE ADMINISTRATION——334511Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument ManufacturingAR25May 18, 2006May 18, 2006Apr 30, 2010
FA880205M0001
200511!000206!5700!FA8802!SMC/PKR !FA880205M0001 !A!N! !N! ! !20050729!20050930!009553637!009553637!009553637!N!THE AEROSPACE CORPORATION !2350 E EL SEGUNDO BLVD !EL SEGUNDO !CA!90245!22412!037!06!EL SEGUNDO !LOS ANGELES !CALIFORNIA!+000000090576!N!N!000000000000!AR25!RDTE/SPACE-SCIENCE APPLICATIONS-ENG/MANUF DEVEL !A2 !MISSILE AND SPACE SYSTEMS !000 !* !541710!E! !9! ! ! ! ! !20200930!C! ! !N!Z!B!N!J!1!001! ! !Z!N!Z! ! !N!Z!N! ! ! ! ! !A!A!000!A!B!N! ! ! ! ! ! !0001! !THE AEROSPACE CORPORATION$0DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—541710AR25Jul 29, 2005Jul 29, 2005—
NNG05CA29C
CODE V SOFTWARE SEAT LICENSESOPTICAL RESEARCH ASSOCIATES$500,000NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—511210AR25Apr 7, 2005Apr 7, 2005Mar 21, 2010
NNG05EB38D
TASK ORDER 5 - SYSTEM ANALYSIS AND ENGINEERING SERVICESNOBLIS, INC.$169,456NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541330Engineering ServicesAR25Dec 30, 2004Dec 30, 2004Mar 31, 2008
NNM04AB15C
4200060990 SBIR PROG 2000 PHASE III PURCHASE RITAL S/WCONCEPTS ETI INC.$28,250NATIONAL AERONAUTICS AND SPACE ADMINISTRATION——541512Computer Systems Design ServicesAR25Jun 22, 2004Jun 23, 2004Aug 22, 2004
Page 1 of 11
  • Previous
  • Next