Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| BLDG 209 - MC-00012-1J. PAINTING&REPAIR FOR 7 DAU BLDGS. | WGP INCORPORATED | $258,000 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 238320Painting and Wall Covering Contractors | Z139 | Sep 30, 2011 | Sep 29, 2011 | Apr 30, 2012 | ||
| OPTION YEAR TWO | NIKOH SANGYO CO., LTD. | $128,610 | DEPT OF DEFENSE EDUCATION ACTIVITY (DODEA) | DEPT OF DEFENSE EDUCATION ACTIVITY (DODEA) | — | 561210Facilities Support Services | Z139 | Sep 30, 2011 | Oct 1, 2011 | Sep 30, 2012 | ||
| PROJECT NO LXFB 04-1263, CONSTRUCT SHOWER FACILITY, B45022, KADENA AIR BASE, OKINAWA,JAPAN; THE WORK ENCOMPASSES THE FOLLOWING: ALL PLANT, LABOR, AND MATERIALS REQUIRED TO RECONSTRUCT STUDENT SANITARY AND SHOWER FACILITY. REPLACE SEVERELY CORRODED SHEET METAL STRUCTURE WITH REINFORCED CONCRETE WALLS, ROOF SLAB AND PARTITIONS. KEEP INTERIOR STRUCTURAL FINISHES TO A MINIMUM WITH NO DROP CEILING. REPLACE ALL INADEQUATE INTERIOR PLUMBING FIXTURES SUCH AS SHOWER HEADS, URINALS, LAVATORIES, SINK AND WATER CLOSETS. ALSO, REPLACE DETERIORATE AIR CONDITIONING UNIT, EXHAUST FANS, INTERIOR AND EXTERIOR LIGHTING FIXTURES AND GFI POWER OUTLET. PROVIDE SHOWER ROOM WITH CERAMIC FLOOR AND WALL. INSTALL ELECTRIC WATER HEATER, PIPE FITTINGS AND INSULATIONS, AND OTHER SUPPORT WORK TO PROVIDE A COMPLETE AND USABLE FACILITY. | AMERICAN ENGINEERING CORPORATION | $0 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 238990All Other Specialty Trade Contractors | Z139 | Sep 30, 2011 | Sep 30, 2011 | Sep 16, 2013 | ||
| REMOVE AND REPLACE CYLINDER ASSEMBLY, RENOVATE/REPAIR ELEVATOR, BUILDING 262, FLETC, GLYNCO, GA | NORTHCON INC | $52,728 | FEDERAL LAW ENFORCEMENT TRAINING CENTER | FEDERAL LAW ENFORCEMENT TRAINING CENTER | — | 236220Commercial and Institutional Building Construction | Z139 | Sep 29, 2011 | Sep 29, 2011 | Dec 14, 2011 | ||
| REPLACE HVAC FOR WRIGHT BROTHERS NATIONAL MEMORIAL,NC***THIS WAS AN 8(A) SETASIDE, BUT THE VENDOR "GRADUATED" FROM THE PROGRAM IN THE FOLLOWING DAYS. GSA WILL NOT ALLOW THE PROFILE TO CHANGE SO WE CAN PROCESS THIS UNDER 8(A), SO ARE DOING UNDER SDWOB. | ASSOCIATES ROOFING & CONSTRUCTION INC | $124,700 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 238220Plumbing, Heating, and Air-Conditioning Contractors | Z139 | Sep 26, 2011 | Sep 26, 2011 | Jan 17, 2012 | ||
| REPAIRS AT BODIE ISLAND STORAGE HOUSE&VISITOR CENTER AND REPAIR DAMAGED OCRACOKE ISLAND HOUSING UNITS, CAPE HATTERAS NATIONAL SEASHORE, NC***THIS WAS AN 8(A) SETASIDE, BUT THE VENDOR "GRADUATED" FROM THE PROGRAM IN THE FOLLOWING DAYS. GSA WILL NOT ALLOW THE PROFILE TO CHANGE SO WE CAN PROCESS THIS UNDER 8(A), SO ARE DOING UNDER SDWOB. | ASSOCIATES ROOFING & CONSTRUCTION INC | $81,020 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 238220Plumbing, Heating, and Air-Conditioning Contractors | Z139 | Sep 26, 2011 | Sep 26, 2011 | Jan 9, 2012 | ||
| REPAIR YOUTH CHALLENGE CLASSROOMS BUILDING 25, LOS ALAMITOS, CA | ALPINE DIVERSIFIED INCORPORATED | $1,648,326 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 236220Commercial and Institutional Building Construction | Z139 | Sep 24, 2011 | Sep 24, 2011 | Jun 12, 2012 | ||
| UPGRADE HVAC SYSTEM B45002 MUNS KADENA AB; WORK INCLUDES INSTALLATION OF SPLIT TYPE A/C UNITS, ELECTRICAL POWER SUPPLY/CONTROLS, REMOVAL OF EXISTING WINDOW TYPE A/C UNITS AND OTHER NECESSARY SUPPORT WORK. EXISTING A/C SYSTEM CONSISTS OF OUTDATED INDIVIDUAL WINDOW UNITS, WHICH ARE NOISY AND DO NOT PROVIDE SUFFICIENT TEMPERATURES OR BALANCED AIR CIRCULATION. | AMERICAN ENGINEERING CORPORATION | $35,052 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 238990All Other Specialty Trade Contractors | Z139 | Sep 23, 2011 | Sep 23, 2011 | Nov 24, 2011 | ||
| MASONRY/ELECTRIC WORK AT O'HARA HALL LOCKER ROOM. | TR WENIGER INC | $31,385 | MARITIME ADMINISTRATION | MARITIME ADMINISTRATION | — | 238140Masonry Contractors | Z139 | Sep 22, 2011 | Sep 22, 2011 | Feb 17, 2012 | ||
| RENOVATE BUILDING 743 PHASE II | TEJAS PREMIER BUILDING CONTRACTOR, INC | $1,514,400 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 236220Commercial and Institutional Building Construction | Z139 | Sep 22, 2011 | Sep 22, 2011 | Jun 25, 2012 | ||
| DEMO CHILLED WATER LINES FOR STRI-PANAMA | DESIGN INSTALLATION AND CONSULTING ENGINEERING COMPANY INC.(DICEC) | $191,054 | SMITHSONIAN INSTITUTION | SMITHSONIAN INSTITUTION | — | 236220Commercial and Institutional Building Construction | Z139 | Sep 21, 2011 | Sep 21, 2011 | Jul 30, 2013 | ||
| REPAIR EXHAUST SYSTEM B1956 | GCC ENTERPRISES INC. | $653,822 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 238220Plumbing, Heating, and Air-Conditioning Contractors | Z139 | Sep 21, 2011 | Sep 21, 2011 | Apr 10, 2013 | ||
| ABG 75, INSTALL WAINSCOTING AT CHILD CARE CENTERS, BLDGS 111 AND 44, USAG HOHENFELS | BUNDESAMT FR BAUWESEN UND RAUMORDNUNG | $91,436 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 238290Other Building Equipment Contractors | Z139 | Sep 20, 2011 | Oct 1, 2011 | Feb 13, 2013 | ||
| PAINT EXTERIOR OF LAND HALL. | CASABLANKA CONTRACTORS, INC | $53,412 | MARITIME ADMINISTRATION | MARITIME ADMINISTRATION | — | 238320Painting and Wall Covering Contractors | Z139 | Sep 20, 2011 | Sep 20, 2011 | Jan 10, 2012 | ||
| REPAINT INTERIOR OF CDC, BLDG S-693 | PINEWOOD INC. | $29,230 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 811412Appliance Repair and Maintenance | Z139 | Sep 19, 2011 | Sep 19, 2011 | Nov 18, 2011 | ||
| REPLICATE AND INSTALL THE COAST GUARD NEED BUILDING'S EXTERIOR SHUTTERS AND ASSOCIATED HARDWARE AT COAST GUARD BEACH, CAPE COD NATIONAL SEASHORE, EASTHAM, MA | BEECH RIVER MILL | $23,375 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 321918Other Millwork (including Flooring) | Z139 | Sep 15, 2011 | Sep 15, 2011 | May 15, 2012 | ||
| LIGHTNING PROTECTION | RLC CONTRACTORS, INC. | $446,301 | FEDERAL EMERGENCY MANAGEMENT AGENCY | FEDERAL EMERGENCY MANAGEMENT AGENCY | — | 238210Electrical Contractors and Other Wiring Installation Contractors | Z139 | Sep 14, 2011 | Sep 14, 2011 | Feb 14, 2012 | ||
| THE PROJECT WILL REPLACE OR REFURBISH THE INTERIOR FIXTURES OF THE TWO APPROXIMATELY 500 SQUARE FOOT RESTROOMS AT THE CHARLES PINCKNEY NATIOANL HISTORIC SITE VISITOR COMFORT STATION. THE PROJECT WILL REPLACE ALL WORN OR AGED COUNTER TOPS, SOAP DISPENSERS, ETC. THE INTERIOR WILL ALSO HAS ROOF REPAIRS ON THE COMFORT STATION AND MAIN HOUSE. | FREELAND CONSTRUCTION COMPANY, INC. | $53,120 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 236220Commercial and Institutional Building Construction | Z139 | Sep 14, 2011 | Sep 14, 2011 | Oct 30, 2011 | ||
| REMOVE&REPLACE CABINETS, COUNTERTOPS AND SINKS AT WESTERN CHILDCARE CENTER | CROWN CONTRACTING, INC. | $29,920 | BUREAU OF ECONOMIC ANALYSIS | NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION | — | 238990All Other Specialty Trade Contractors | Z139 | Sep 13, 2011 | Sep 13, 2011 | Mar 13, 2012 | ||
| REPAIR RUNWAY 11/29, MILL AND OVERLAY | ONEIDA TOTAL INTEGRATED ENTERPRISES LLC | $4,634,158 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 237310Highway, Street, and Bridge Construction | Z139 | Sep 13, 2011 | Sep 8, 2011 | Aug 19, 2012 | ||
| INDEFINITE DELIVERY -INDEFINITE QUANTITY - ROOF REPAIR BLDG. 314 | CO. CER. SOCIETA' COOPERATIVA | $49,232 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 238160Roofing Contractors | Z139 | Sep 1, 2011 | Aug 31, 2011 | Nov 14, 2011 | ||
| ABG 75, REPLACE CONTROL SYSTEM FOR HVAC (HEATING/VENTILATION/AIR CONDITION SYSTEM) | BUNDESAMT FR BAUWESEN UND RAUMORDNUNG | $167,497 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 238220Plumbing, Heating, and Air-Conditioning Contractors | Z139 | Sep 1, 2011 | Sep 30, 2011 | Dec 19, 2012 | ||
| PAINT WORTHINGTON HOUSE, MONOCACY NATIONAL BATTLEFIELD | SUMERSETT CONSTRUCTION INC. | $13,600 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 236220Commercial and Institutional Building Construction | Z139 | Aug 26, 2011 | Aug 26, 2011 | Oct 12, 2011 | ||
| PH283 INSTALL INTERIOR WALLS | BECKMAN CONSTRUCTION COMPANY | $48,271 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 236220Commercial and Institutional Building Construction | Z139 | Aug 24, 2011 | Aug 24, 2011 | Jan 31, 2012 | ||
| TOHONO O'ODHAM HIGH SCHOOL ROOF REPAIRS, BUILDING 803 GYMNASIUM. | A&B REMEDIES CONSTRUCTION REMODELING & RESTORATION, LLC | $35,005 | BUREAU OF INDIAN AFFAIRS | BUREAU OF INDIAN AFFAIRS | — | 238160Roofing Contractors | Z139 | Aug 23, 2011 | Aug 23, 2011 | Jan 17, 2012 |