• ⌘ + K
  • Home
  • 0
    Inbox
Explore
  • Browse All
  • Health
  • FedCiv
  • Defense
  • Events
Work
  • Teaming Hub
  • Watchlists
  • Bookmarks
  • Notes
Research
  • Grants
    • Contracts
    • Vehicles
    • OTAs
    • OTIDVs
  • Agencies
  • NAICS
  • PSC
  • DOGE Tracker

Federal Contract Awards

14awards

Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.

Awardee
is
EUJSKQHMPLR5
Award ID
Description
Recipient
Total Value
Awarding Agency
Funding Agency
Set Aside
NAICS
PSC
Award Date
Start Date
End Date
FA330025C0060
REPAIR INTERIOR FLOOR BLDG 1431 IN ACCORDANCE WITH THE SUMMARY OF WORK (SOW) AND SUBJECT TO THE TERMS AND CONDITIONS OF THE CONTRACT.BERT CONSTRUCTION INC$197,543DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—236220Commercial and Institutional Building ConstructionZ1AZMAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGSSep 26, 2025Oct 1, 2025Mar 31, 2026
FA330025C0038
THE CONTRACTOR SHALL FURNISH ALL NECESSARY PLANT, LABOR, EQUIPMENT, AND MATERIALS, AND PERFORM ALL WORK REQUIRED FOR PNQS 25-1844 TRAFFIC LIGHT REPAIRS.BERT CONSTRUCTION INC$554,594DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—238210Electrical Contractors and Other Wiring Installation ContractorsJ062MAINT/REPAIR/REBUILD OF EQUIPMENT- LIGHTING FIXTURES AND LAMPSSep 25, 2025Sep 30, 2025May 28, 2026
FA330025C0037
THE CONTRACTOR SHALL FURNISH ALL NECESSARY PLANT, LABOR, EQUIPMENT, AND MATERIALS, AND PERFORM ALL WORK REQUIRED FOR JUBJ 25-1847 REPAIR GUNTER-ANNEX TRAFFIC LIGHTS.BERT CONSTRUCTION INC$235,154DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—238210Electrical Contractors and Other Wiring Installation ContractorsJ062MAINT/REPAIR/REBUILD OF EQUIPMENT- LIGHTING FIXTURES AND LAMPSSep 25, 2025Sep 1, 2025Apr 14, 2026
FA330025C0056
CONTRACTOR SHALL PROVIDE ALL NECESSARY LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION TO COMPLETE THE PAINT AND REFINISHING OF FAITH CHAPEL (BLDG 155) IN ACCORDANCE WITH (IAW) THE SPECIFICATIONS (SPECS) WO 101552055 AND B155 SITE MAP.BERT CONSTRUCTION INC$20,308DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—236220Commercial and Institutional Building ConstructionZ1AZMAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGSSep 19, 2025Oct 1, 2025Nov 30, 2025
FA330025C0053
OTS TRAINING SITE CONEX REPAIR: BERT CONSTRUCTION PROPOSAL DATED 11 SEPTEMBER 2025 IS HEREBY INCORPORATED BY REFERENCE.BERT CONSTRUCTION INC$744,900DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—238390Other Building Finishing Contractors5410PREFABRICATED AND PORTABLE BUILDINGSSep 18, 2025Sep 18, 2025Jan 30, 2026
FA330025C0052
FURNISH ALL PLANT, LABOR, MATERIALS AND EQUIPMENT NECESSARY TO PERFORM ALL WORK IN CONNECTION WITH BUILDING 1403 (MAX) PLUMBING - SEWER PIPE RESTRICTIONS, MAXWELL AFB.BERT CONSTRUCTION INC$61,672DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—238220Plumbing, Heating, and Air-Conditioning ContractorsJ045MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENTSep 16, 2025Oct 1, 2025Jan 30, 2026
FA330025C0041
FURNISH ALL PLANT, LABOR, MATERIALS AND EQUIPMENT NECESSARY TO PERFORM ALL WORK IN CONNECTION WITH MINOR INTERIOR REFRESH, BLDG 800 RM 254 IN ACCORDANCE WITH (IAW) PNQS 24-5297 SPECIFICATIONS AND DRAWINGS.BERT CONSTRUCTION INC$93,828DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—236220Commercial and Institutional Building ConstructionZ1AZMAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGSSep 3, 2025Sep 8, 2025Oct 31, 2025
FA330025C0023
INSTALL 3 POWER LINES AND 4 ELECTRICAL OUTLETS IN BUILDING 714, MAXWELL AFB IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK (SOW).BERT CONSTRUCTION INC$5,899DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—238210Electrical Contractors and Other Wiring Installation Contractors5935CONNECTORS, ELECTRICALJun 12, 2025Jun 17, 2025Jun 30, 2025
FA330024C0055
THE WORK COVERED BY THESE SPECIFICATIONS CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT AND MATERIALS AND PERFORMING ALL OPERATIONS IN CONNECTION WITH THE SECURITY UPGRADES OF BUILDING 84 AT MAXWELL AFB/BUILDING 802 GUNTER ANNEX OF MAXWELL AFB.BERT CONSTRUCTION INC$51,506DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—238350Finish Carpentry ContractorsZ2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGSSep 25, 2024Oct 15, 2024Feb 28, 2025
FA330024C0062
AFLCMC HAS A REQUIREMENT TO PURCHASE AND INSTALL CARPET, AS WELL AS TO RENOVATE BOTH BUILDING 892 SUITE 110 AND THE AUDITORIUM.BERT CONSTRUCTION INC$497,467DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—236220Commercial and Institutional Building ConstructionZ2AAREPAIR OR ALTERATION OF OFFICE BUILDINGSSep 25, 2024Oct 15, 2024Mar 23, 2025
FA330024C0054
FURNISH ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO REMOVE CARPET AND FINISH CONCRETE FLOOR IN THE BLDG. 800 BASEMENT AT MAXWELL AFB IAW SPECIFICATIONS, DRAWINGS, AND CONTRACT TERMS.BERT CONSTRUCTION INC$361,164DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—238330Flooring ContractorsZ2AAREPAIR OR ALTERATION OF OFFICE BUILDINGSSep 24, 2024Oct 15, 2024May 2, 2025
FA330024C0029
FY24 PNQS 24-3992 REPLACE LOCALIZER PAD, BLDG. 2076BERT CONSTRUCTION INC$135,677DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—238110Poured Concrete Foundation and Structure ContractorsY1BZCONSTRUCTION OF OTHER AIRFIELD STRUCTURESAug 5, 2024Aug 15, 2024Feb 11, 2025
FA330024C0025
PROJECT TITLE: FY 24 PNQS 24-3706 REPAIR SEWER LINESBERT CONSTRUCTION INC$227,311DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—237110Water and Sewer Line and Related Structures ConstructionZ2NDREPAIR OR ALTERATION OF SEWAGE AND WASTE FACILITIESJul 3, 2024Jul 13, 2024Feb 28, 2025
FA330023P0056
THIS REQUIREMENT IS TO PURCHASE A CURTAIN MOTORS.BERT CONSTRUCTION INC$36,827DEPT OF THE AIR FORCEDEPT OF THE AIR FORCE—314120Curtain and Linen Mills6105MOTORS, ELECTRICALAug 14, 2023Aug 9, 2023Oct 13, 2023
Page 1 of 1
  • Previous
  • Next