• ⌘ + K
  • Home
  • 0
    Inbox
Explore
  • Browse All
  • Health
  • FedCiv
  • Defense
  • Events
Work
  • Teaming Hub
  • Watchlists
  • Bookmarks
  • Notes
Research
  • Grants
    • Contracts
    • Vehicles
    • OTAs
    • OTIDVs
  • Agencies
  • NAICS
  • PSC
  • DOGE Tracker

Federal Contract Awards

54awards

Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.

Awardee
is
F2HGS3DAHEK4
Award ID
Description
Recipient
Total Value
Awarding Agency
Funding Agency
Set Aside
NAICS
PSC
Award Date
Start Date
End Date
140P4224P0029
COLO REPLACE FUEL GUAGING SYSTEMTOTAL ENVIRONMENTAL CONCEPTS, INC.$25,575NATIONAL PARK SERVICENATIONAL PARK SERVICE—333914Measuring, Dispensing, and Other Pumping Equipment ManufacturingZ1NAMAINTENANCE OF FUEL SUPPLY FACILITIESApr 26, 2024Apr 26, 2024Jun 21, 2024
75N99023F00001
C104552 - FOLLOW-ON TO ADDRESS ABATEMENT OF ACM PIPE INSULATION, CHARISSA COOPER [23-000541]TOTAL ENVIRONMENTAL CONCEPTS, INC.$20,869NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONNov 15, 2022Nov 15, 2022Dec 16, 2022
75N99022F00002
C110004 - ABATEMENT OF BLDG 38 -NLM 1ST FLOOR PHASE 2 PRIOR TO UPCOMING RENOVATION PROJECT - CHARISSA COOPERTOTAL ENVIRONMENTAL CONCEPTS, INC.$1,956,494NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF999OTHER ENVIRONMENTAL SERVICESSep 27, 2022Sep 27, 2022Mar 31, 2025
75N99022F00003
C110006-PHASE 2 ABATEMENT OF MEZZANINE LEVEL BLDG 38 NLM PRIOR TO RENOVATION PROJECT - CHARISSA COOPERTOTAL ENVIRONMENTAL CONCEPTS, INC.$330,936NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONSep 27, 2022Sep 27, 2022Jul 31, 2023
12305B22P0160
REPAIR/REPLACE - DISPENSER BOOT KITS FOR TWO (2) FUEL DISPENSERS AND TWO UNDERGROUND TANK SUMPS.TOTAL ENVIRONMENTAL CONCEPTS, INC.$19,503AGRICULTURAL RESEARCH SERVICEAGRICULTURAL RESEARCH SERVICE—811219Z1DBMAINTENANCE OF LABORATORIES AND CLINICSSep 6, 2022Sep 6, 2022Nov 30, 2022
75N99022F00001
C106619 - ASBESTOS ABATEMENT OF BLDG 38 MEZZANINE LEVEL PHASE 1 PRIOR TO RENOVATION, CHARISSA COOPER [22-003913]TOTAL ENVIRONMENTAL CONCEPTS, INC.$18,075NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONJul 7, 2022Jul 7, 2022Aug 10, 2022
N0016722P0136
UNDERGROUND STORAGE TANK TESTINGTOTAL ENVIRONMENTAL CONCEPTS, INC.$2,950DEPT OF THE NAVYDEPT OF THE NAVY—541620Environmental Consulting ServicesR425SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICALMay 31, 2022May 31, 2022Sep 30, 2022
12305B22F0067
REPAIRS: FUEL DEPOT, UNDERGROUND STORAGE TANK (UST), SUMP BOOT @ USNA CAMPUS. VENDOR IS ON GSA. GSA: GS-10F-0270V.TOTAL ENVIRONMENTAL CONCEPTS, INC.$5,375AGRICULTURAL RESEARCH SERVICEAGRICULTURAL RESEARCH SERVICE—541620Environmental Consulting ServicesJ091MAINT/REPAIR/REBUILD OF EQUIPMENT- FUELS, LUBRICANTS, OILS, AND WAXESMay 5, 2022May 3, 2022Jul 31, 2022
75N99021F00030
C106619 BLDG 38 NLM CHANGE ORDER #2, LEAD AND ASBESTOS ABATEMENT - JACOB DEALTOTAL ENVIRONMENTAL CONCEPTS, INC.$259,658NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONSep 8, 2021Sep 8, 2021Jan 28, 2022
75N99021F00008
C107750 - BUILDING 31 2ND FLOOR ASBESTOS ABATEMENT FOR NICHD C108655 - TRAILER 39 CROSS-FIT GYM ASBESTOS ABATEMENTTOTAL ENVIRONMENTAL CONCEPTS, INC.$1,081,159NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONAug 19, 2021Aug 19, 2021Dec 8, 2023
75N99021F00007
C106564 LEAD AND ASBESTOS ABATEMENT IN BLDG 31 FITNESS CENTER (B4CS33A AND B4CS33B) PRIOR TO RENOVATION PROJECT CHARISSA COOPER [21-003382]TOTAL ENVIRONMENTAL CONCEPTS, INC.$66,674NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONJul 20, 2021Jul 20, 2021Oct 31, 2021
75N99021F00006
C105044 AND C109433 ASBESTOS AND LEAD ABATEMENT, NIH BETHESDA CAMPUSTOTAL ENVIRONMENTAL CONCEPTS, INC.$70,418NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONJun 29, 2021Jun 29, 2021Sep 30, 2021
75N99021F00005
C105070 - ABATEMENT OF FLOOR TILE AND STAIR TREADS TO ALLOW FOR INSTALLATION OF ABA CHAIRLIFT IN BLDG 31, CORRIDOR B1 - CHARISSA COOPERTOTAL ENVIRONMENTAL CONCEPTS, INC.$6,732NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONJun 2, 2021Jun 2, 2021Sep 2, 2021
75N99021F00004
C104552 ABATEMENT OF ASBESTOS PIPE INSULATION ALONG CONVENT DRIVE FROM MANHOLE 69 TO 101 TO ALLOW FOR STEAM PIPE REPLACEMENT C106810 ASBESTOS ABATEMENT IN BLDG 31C 1ST FLOOR RESTROOMTOTAL ENVIRONMENTAL CONCEPTS, INC.$114,451NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONMay 11, 2021May 11, 2021Apr 29, 2022
75N99021F00003
C106619 - ASBESTOS ABATEMENT AND REQUIRED DEMOLITION FOR ACCESS FOR THE NLM RENOVATION PHASE I BLDG 38 - MOSES UKAOMATOTAL ENVIRONMENTAL CONCEPTS, INC.$938,178NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONFeb 12, 2021Feb 12, 2021May 14, 2021
75N99021F00002
ASBESTOS ABATEMENT TO SUPPORT BUILDING 38A 9TH FLOOR RENOVATIONTOTAL ENVIRONMENTAL CONCEPTS, INC.$19,043NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONNov 30, 2020Nov 30, 2020Jan 11, 2021
75N99021F00001
C106662 - THE ABATEMENT OF BLDG 31A ENTIRE 8TH FLOOR INCLUDING 4500 SQ FT OF WALL PLASTER INSULATION ABATEMENT, 150 SQ FT OF FLOORING MATERIAL ABATEMENT - MOSES UKAOMATOTAL ENVIRONMENTAL CONCEPTS, INC.$418,793NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF999OTHER ENVIRONMENTAL SERVICESNov 20, 2020Nov 20, 2020Jun 22, 2021
75N99020F00017
C106000 - ASBESTOS ABATEMENT OF UNDERGROUND (BURIED) STEAM LINES FROM BLDG 2 TO MANHOLE 85 - MOSES UKAOMATOTAL ENVIRONMENTAL CONCEPTS, INC.$67,358NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONSep 23, 2020Sep 28, 2020Jul 9, 2021
75N99020F00016
C109096 - ASBESTOS ABATEMENT OF 330FT OF UNDERGROUND RICWELL STEAM PIPE SYSTEM AT NIH POOLESVILLE, MD. CAMPUS REQUISITION NUMBER: 5799100 PERIOD OF PERFORMANCE:10/01/2020 THROUGH 12/12/2020TOTAL ENVIRONMENTAL CONCEPTS, INC.$52,732NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONSep 18, 2020Sep 18, 2020Dec 31, 2020
75N99020F00015
C107164 - CARPET REMOVAL AND ASBESTOS ABATEMENT OF 1041 SQ FT OF FLOOR SPACE REQUIRED FOR ROOM 3017 IN BLDG 12A WITH SMALL DEMO-FOR-ACCESSTOTAL ENVIRONMENTAL CONCEPTS, INC.$30,092NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONSep 14, 2020Sep 14, 2020Dec 31, 2020
75N99020F00013
C103542 - ASBESTOS ABATEMENT OF BLDG 12 DATA CENTER, BREAK ROOM AND UTILITY CLOSET STEAM PIPES, MOSES UKAOMA - PERIOD OF PERFORMANCE 7/15/2020 - 10/15/2020TOTAL ENVIRONMENTAL CONCEPTS, INC.$20,759NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONJul 15, 2020Jul 15, 2020Nov 30, 2020
75N99020F00012
C109044 - ASBESTOS ABATEMENT FOR STEAM PIPE THERMAL SYSTEMS INSULATION, BLDG 31, B4 MECH. ROOM C-WING, MOSES UKAOMA, PERIOD OF PERFORMANCE 7/15/2020 - 10/15/2020TOTAL ENVIRONMENTAL CONCEPTS, INC.$14,871NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONJul 15, 2020Jul 15, 2020Oct 15, 2020
75N99020F00010
C109041 - ABATEMENT OF ASBESTOS CEILING STRUCTURE, BLDG 31 SUITE 5C02, MOSES UKAOMATOTAL ENVIRONMENTAL CONCEPTS, INC.$30,418NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONMay 18, 2020May 18, 2020Nov 30, 2020
75N99020F00009
C108694 - ENVIRONMENTAL REMEDIATION: CARPET REMOVAL, ASBESTOS ABATEMENT OF 9 X 9 FLOOR TILES AND GLUE MASTIC IN A 1700 SQ FT OFFICE SPACE; B31 - MOSES UKAOMATOTAL ENVIRONMENTAL CONCEPTS, INC.$42,365NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONApr 6, 2020Apr 6, 2020Sep 30, 2020
75N99020F00007
C108266 - ENV REM: ABATEMENT ASBESTOS CONTAINING CEILING; B31A, MAIN HALLWAY - MOSES UKAOMATOTAL ENVIRONMENTAL CONCEPTS, INC.$103,785NATIONAL INSTITUTES OF HEALTHNATIONAL INSTITUTES OF HEALTH—541620Environmental Consulting ServicesF108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATIONFeb 14, 2020Feb 17, 2020Feb 16, 2021
Page 1 of 3
  • Previous
  • Next