Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| EMERGENCY FIBER REPAIR AT DISC KANSAS CITY DATA CENTER | AMERICAN LEGACY CONSTRUCTION. LLC | $4,600 | USDA, DEPARTMENTAL ADMINISTRATION | USDA, OFFICE OF THE CHIEF INFORMATION OFFICER | — | 811213 | Z2BGREPAIR OR ALTERATION OF ELECTRONIC AND COMMUNICATIONS FACILITIES | Mar 31, 2022 | Mar 31, 2022 | Mar 31, 2022 | ||
| LOCATION: 8930 WARD PARKWAY,KANSAS CITY, MISSOURI, 64114 THIS PROCUREMENT IS TO INSTALL A DCIM BUILDING SYSTEM FOR THE UDSA DATA CENTER LOCATED AT 8930 WARD PARKWAY. | AMERICAN LEGACY CONSTRUCTION. LLC | $695,652 | PUBLIC BUILDINGS SERVICE | USDA, OFFICE OF THE CHIEF INFORMATION OFFICER | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Jul 8, 2021 | Jul 8, 2021 | May 3, 2022 | ||
| REPAIR HVAC BYPASS PIPING&SENSORS AT BLDG. 268 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THIS STATEMENT OF WORK TO REPAIR HVAC BYPASS PIPING AND SENSORS AT BUILDING #268. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL HVAC PIPING AND SENSORS. | AMERICAN LEGACY CONSTRUCTION. LLC | $24,623 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 236220Commercial and Institutional Building Construction | Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | Jul 10, 2018 | Jul 10, 2018 | Aug 24, 2018 | ||
| N1511310A POD1A POWER INFRASTRUCTURE WARD PARKWAY FEDERAL BUILDING THE POD 1A POWER INFRASTRUCTURE PROJECT IS TO PROVIDE POWER TO THE REMAINDER OF THE POD 1A DATA CENTER. | AMERICAN LEGACY CONSTRUCTION. LLC | $1,055,538 | PUBLIC BUILDINGS SERVICE | USDA, OFFICE OF THE CHIEF INFORMATION OFFICER | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | May 11, 2018 | May 11, 2018 | Jun 12, 2019 | ||
| IGF::OT::IGF INSTALL TWO (2) 30-AMP 4 WIRE 430C9W POWER WHIPS FOR NITC MAINFRAME IN ST LOUIS, MO. VENDOR: AMERICAN LEGACY COR: DAVID DUDGEON. WAIVER: FY18-0057 R181026 | AMERICAN LEGACY CONSTRUCTION. LLC | $2,918 | USDA, DEPARTMENTAL ADMINISTRATION | USDA, OFFICE OF THE CHIEF INFORMATION OFFICER | — | 238210Electrical Contractors and Other Wiring Installation Contractors | 5995CABLE, CORD, AND WIRE ASSEMBLIES: COMMUNICATION EQUIPMENT | Feb 7, 2018 | Feb 7, 2018 | Feb 28, 2018 | ||
| IGF::OT::IGF INSTALL TWO (2) NEW 60 AMP 4 WIRE POWER WHIPS AND REPLACE FOUR (4) 30 AMP RECEPTACLES FOR IBM MAINFRAME PROJECT. INSTALL WILL TAKE PLACE AT NITC DATACENTER LOCATED IN ST. LOUIS MO. VENDOR: AMERICAN LEGACY COR: DAVID DUDGEON. WAIVER: FY18-0057 R181010 | AMERICAN LEGACY CONSTRUCTION. LLC | $4,058 | USDA, DEPARTMENTAL ADMINISTRATION | USDA, OFFICE OF THE CHIEF INFORMATION OFFICER | — | 238210Electrical Contractors and Other Wiring Installation Contractors | 5999MISCELLANEOUS ELECTRICAL AND ELECTRONIC COMPONENTS | Jan 25, 2018 | Jan 23, 2018 | Feb 28, 2018 | ||
| IGF::OT::IGF INSTALL TWO (2) NEW 60 AMP 4 WIRE POWER WHIPS WITH 460C6W FOR THE IBM MAINFRAME PROJECT. VENDOR: AMERICAN LEGACY COR: DAVID DUDGEON WAIVER: FY18-0057 R18011 R181011, CO-JADAMS, COR-DDUDGEON, AMERICAN LEGACY | AMERICAN LEGACY CONSTRUCTION. LLC | $3,157 | USDA, DEPARTMENTAL ADMINISTRATION | USDA, OFFICE OF THE CHIEF INFORMATION OFFICER | — | 238210Electrical Contractors and Other Wiring Installation Contractors | 5999MISCELLANEOUS ELECTRICAL AND ELECTRONIC COMPONENTS | Jan 23, 2018 | Jan 23, 2018 | Feb 28, 2018 | ||
| IGF::OT::IGF REPAIR FUEL LEAKS IN NITC ST LOUIS GENERATOR FUEL PIPES. VENDOR: AMERICAN LEGACY COR: DAVID DUDGEON WAIVER: FY18-0021 R18800 | AMERICAN LEGACY CONSTRUCTION. LLC | $6,455 | USDA, DEPARTMENTAL ADMINISTRATION | USDA, OFFICE OF THE CHIEF INFORMATION OFFICER | — | 811310Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance | J049MAINT/REPAIR/REBUILD OF EQUIPMENT- MAINTENANCE AND REPAIR SHOP EQUIPMENT | Nov 8, 2017 | Nov 8, 2017 | Nov 30, 2017 | ||
| IGF::OT::IGF REPLACE THE 1600 AMP SQUARE D BREAKER LOCATED IN THE SUB-BASEMENT FOR GENERATOR 1. WAIVER: FY17-0203 R17800 | AMERICAN LEGACY CONSTRUCTION. LLC | $10,600 | USDA, DEPARTMENTAL ADMINISTRATION | USDA, OFFICE OF THE CHIEF INFORMATION OFFICER | — | 238210Electrical Contractors and Other Wiring Installation Contractors | 6115GENERATORS AND GENERATOR SETS, ELECTRICAL | Sep 28, 2017 | Sep 28, 2017 | Oct 31, 2017 | ||
| IGF::OT::IGF CHECK INSPECT AND TEST SQUARE D BREAKERS IN GENERATOR PARALLEL GEAR AT USDA NITC - KANSAS CITY. VENDOR: AMERICAN LEGACY COR: DAVID DUDGEON WAIVER: FY17-0126 R171003 | AMERICAN LEGACY CONSTRUCTION. LLC | $4,202 | USDA, DEPARTMENTAL ADMINISTRATION | USDA, OFFICE OF THE CHIEF INFORMATION OFFICER | — | 423610Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers | 5995CABLE, CORD, AND WIRE ASSEMBLIES: COMMUNICATION EQUIPMENT | Sep 27, 2017 | Sep 27, 2017 | Oct 26, 2017 | ||
| IGF::OT::IGF REPAIR FIVE WALK-IN REFRIGERATORS AND FREEZERS AT BLDG #1140 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THIS STATEMENT OF WORK TO REPAIR FIVE WALK-IN REFRIGERATORS AND FREEZERS AT BUILDING #1140. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL REFRIGERATORS AND FREEZERS. | AMERICAN LEGACY CONSTRUCTION. LLC | $253,040 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 236220Commercial and Institutional Building Construction | Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | Sep 20, 2017 | Sep 20, 2017 | Mar 19, 2018 | ||
| IGF::OT::IGF 2312 E. BANNISTER ROAD, KANSAS CITY, MO. CONTRACTOR SHALL RETROFIT TWELVE POLE LIGHTS WITH 400W EQUIVALENT LED KITS, FIVE WALL-PACK LIGHTS WITH 250W EQUIVALENT LED LIGHT KITS. REPLACE 500W QUARTZ FIXTURE WITH LED WALL PACK LIGHT FIXTURE, REPLACE FOUR ENTRY DOOR DAY-BURNER LIGHTS WITH LED EQUIVALENT AND ENSURE ALL LIGHTING IS PROPERLY CONTROLLED THROUGH PHOTOELECTRIC CONTROLS TO PREVENT DAY- BURNER | AMERICAN LEGACY CONSTRUCTION. LLC | $23,554 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z1AAMAINTENANCE OF OFFICE BUILDINGS | Sep 12, 2017 | Sep 13, 2017 | Dec 12, 2017 | ||
| IGF::OT::IGF SECURE FAILING WOOD TRIM AT BLDG. #127 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO SECURE FAILING WOOD TRIM. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL TRIM. | AMERICAN LEGACY CONSTRUCTION. LLC | $115,544 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 236220Commercial and Institutional Building Construction | Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | Aug 23, 2017 | Aug 23, 2017 | Nov 20, 2017 | ||
| IGF::OT::IGF THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPLACE FLOORING / REFINISHING AT BLDG.1056 AND REPLACE WINDOW AT BLDG.286. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL WINDOWS AND FLOORING. | AMERICAN LEGACY CONSTRUCTION. LLC | $129,731 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 236220Commercial and Institutional Building Construction | Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | Aug 22, 2017 | Aug 22, 2017 | Feb 14, 2018 | ||
| IGF::OT::IGF INSTALL TWO (2) NEW POWER WHIPS WITH 360C6W RECEPTACLES FOR NASS IBM ST LOUIS PROJECT. VENDOR: AMERICAN LEGACY COR: DAVID DUDGEON WAIVER: FY17-0126 R17800 | AMERICAN LEGACY CONSTRUCTION. LLC | $5,596 | USDA, DEPARTMENTAL ADMINISTRATION | USDA, OFFICE OF THE CHIEF INFORMATION OFFICER | — | 238210Electrical Contractors and Other Wiring Installation Contractors | 5995CABLE, CORD, AND WIRE ASSEMBLIES: COMMUNICATION EQUIPMENT | Aug 18, 2017 | Aug 18, 2017 | Aug 31, 2017 | ||
| IGF::OT::IGF INSTALL SIX (6) NEW POWER WHIPS WITH 360C6W RECEPTACLE FOR SMB VERITAS ST LOUIS PROJECT. VENDOR: AMERICAN LEGACY CONSTRUCTION. COR: JOE WALLACE WAIVER: FY17-0056 R17800 | AMERICAN LEGACY CONSTRUCTION. LLC | $6,596 | USDA, DEPARTMENTAL ADMINISTRATION | USDA, OFFICE OF THE CHIEF INFORMATION OFFICER | — | 238210Electrical Contractors and Other Wiring Installation Contractors | 5995CABLE, CORD, AND WIRE ASSEMBLIES: COMMUNICATION EQUIPMENT | Aug 18, 2017 | Aug 18, 2017 | Aug 31, 2017 | ||
| IGF::OT::IGF -2306 E. BANNISTER ROAD, KANSAS CITY, MO PROVIDE ALL LABOR, EQUIPMENT, MATERIALS, AND SUPERVISION TO PROVIDE AND INSTALL ONE APC SYMMETRA PX 25KW POWER MODULE 400/480V IN CAGE 4 SERVER ROOM 1052. | AMERICAN LEGACY CONSTRUCTION. LLC | $11,201 | PUBLIC BUILDINGS SERVICE | DEPT OF THE NAVY | — | 541519Other Computer Related Services | 5963ELECTRONIC MODULES | Aug 16, 2017 | Aug 17, 2017 | Dec 15, 2017 | ||
| IGF::OT::IGF REPAIR TWO CHILLERS AT BLDG.#1144 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THIS STATEMENT OF WORK TO REPAIR TWO CHILLERS AT BUILDING #1144. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL CHILLERS. | AMERICAN LEGACY CONSTRUCTION. LLC | $935,862 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 236220Commercial and Institutional Building Construction | Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | Jul 25, 2017 | Jul 21, 2017 | Jul 24, 2018 | ||
| IGF::OT::IGF CONNECT LEGACY GLYCOL COMPUTER ROOM AIR CONDITIONER TO NEW POD 1A COOLING SYSTEM. VENDOR: AMERICAN LEGACY COR: DAVID DUDGEON. WAIVER: AAR FY17-0058 R17936 | AMERICAN LEGACY CONSTRUCTION. LLC | $126,876 | USDA, DEPARTMENTAL ADMINISTRATION | USDA, OFFICE OF THE CHIEF INFORMATION OFFICER | — | 238210Electrical Contractors and Other Wiring Installation Contractors | 5995CABLE, CORD, AND WIRE ASSEMBLIES: COMMUNICATION EQUIPMENT | Jul 19, 2017 | Jul 19, 2017 | May 11, 2018 | ||
| IGF::OT::IGF REPAIR HVAC AT BLDG #268 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THIS STATEMENT OF WORK TO REPAIR HVAC AT BUILDING #268. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL HVAC. | AMERICAN LEGACY CONSTRUCTION. LLC | $569,378 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 236220Commercial and Institutional Building Construction | Z2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | Jul 18, 2017 | Jul 17, 2017 | Mar 30, 2018 | ||
| IGF::OT::IGF - 2306 E. BANNISTER ROAD, KANSAS CITY, MO CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, MATERIALS, AND SUPERVISION TO PROVIDE AND INSTALL ONE APC STATIC BYPASS SWITCH MODEL # 06-SYSW500KD. | AMERICAN LEGACY CONSTRUCTION. LLC | $19,365 | PUBLIC BUILDINGS SERVICE | DEPT OF THE NAVY | — | 236220Commercial and Institutional Building Construction | Z1AAMAINTENANCE OF OFFICE BUILDINGS | Jul 13, 2017 | Jul 13, 2017 | Nov 9, 2017 | ||
| IGF::OT::IGF -2312 E. BANNISTER ROAD, KANSAS CITY, MO REMOVE THE EXISTING INTERIOR OVERHEAD DOOR THEN INSTALL ONE NEW 3 HOUR FIRE RATED ROLL UP OVERHEAD DOOR WITH AN ELECTRONIC OPENER. | AMERICAN LEGACY CONSTRUCTION. LLC | $19,171 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z1AAMAINTENANCE OF OFFICE BUILDINGS | Jun 19, 2017 | Jun 20, 2017 | Sep 18, 2017 | ||
| IGF::OT::IGF CHARLES F. PREVEDEL FEDERAL BUILDING , 9700 PAGE AVENUE, OVERLAND, MO. IMMEDIATELY UPON SIGNATURE OF THE CONTRACTING OFFICER, RMO22640 USDA NASS BASEMENT LAB FIRE SEPARATION IS HEREBY AWARDED TO PROVIDE NECESSARY CONSTRUCTION SERVICES IN ACCORDANCE WITH THE TASK ORDER AGREEMENT. | AMERICAN LEGACY CONSTRUCTION. LLC | $163,905 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | May 26, 2017 | May 26, 2017 | Mar 13, 2018 | ||
| IGF::OT::IGF 2312 E BANNISTER, KANSAS CITY MOM 64131. CONTRACTOR SHALL REMOVE AND REPLACE 3-HOUR FIRE RATED DOUBLE DOORS, HARDWARE, AND ACCESSORIES. CONTRACTOR SHALL ENSURE THAT ALL ASSEMBLIES AND HARDWARE INSTALLED IN THE MEANS OF EGRESS MEETS THE REQUIREMENTS OF THE FIRE EXIT REQUIREMENTS AS OUTLINED IN THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 101, LIFE SAFETY CODE (2015 EDITION). CONTRACTOR SHALL PAINT NEW DOORS AND EXISTING FRAME WITH A NEUTRAL COLOR. PAINT COLOR SHALL BE APPROVED BY BUILDING MANAGEMENT, PRIOR TO PAINTING. | AMERICAN LEGACY CONSTRUCTION. LLC | $8,398 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z1AAMAINTENANCE OF OFFICE BUILDINGS | May 25, 2017 | May 26, 2017 | Dec 24, 2017 | ||
| IGF::OT::IGF INSTALL TWO (2) POWER WHIPDS IN POD 3, 4-WIRE, 60A 3PHASE. VENDOR: AMERICAN LEGACY COR: ERIC CROSS WAIVER: FY17-0124 R17942 | AMERICAN LEGACY CONSTRUCTION. LLC | $5,414 | USDA, DEPARTMENTAL ADMINISTRATION | USDA, OFFICE OF THE CHIEF INFORMATION OFFICER | — | 238210Electrical Contractors and Other Wiring Installation Contractors | 5995CABLE, CORD, AND WIRE ASSEMBLIES: COMMUNICATION EQUIPMENT | May 11, 2017 | May 11, 2017 | May 31, 2017 |