Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MINE DRILLING | COASTAL DRILLING EAST, LLC | $249,749 | CENTERS FOR DISEASE CONTROL AND PREVENTION | CENTERS FOR DISEASE CONTROL AND PREVENTION | — | 213113Support Activities for Coal Mining | AG11ENERGY R&D SERVICES; ENERGY SUPPLY; BASIC RESEARCH | Jul 14, 2023 | Jul 14, 2023 | Sep 30, 2024 | ||
| PIKE ISLAND MONOLITH R33 AND R34 RIVER WALL CRACK STABILIZATION | COASTAL DRILLING EAST, LLC | $952,195 | DEPT OF THE ARMY | US ARMY CORPS OF ENGINEERS - CIVIL PROGRAM FINANCING ONLY | — | 237990Other Heavy and Civil Engineering Construction | Z1KAMAINTENANCE OF DAMS | Sep 25, 2020 | Oct 15, 2020 | Oct 15, 2021 | ||
| ROAD PREPARATION, DRILL SITE PREPARATION AND BOARING OF 8" BOREHOLE. | COASTAL DRILLING EAST, LLC | $174,850 | CENTERS FOR DISEASE CONTROL AND PREVENTION | CENTERS FOR DISEASE CONTROL AND PREVENTION | — | 213113Support Activities for Coal Mining | AG11ENERGY R&D SERVICES; ENERGY SUPPLY; BASIC RESEARCH | Aug 4, 2020 | Aug 4, 2020 | Aug 2, 2021 | ||
| ANCHORAGE REPAIRS AT WINFIELD LOCKS AND DAM, RED HOUSE, WV | COASTAL DRILLING EAST, LLC | $846,882 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 237990Other Heavy and Civil Engineering Construction | Z1KAMAINTENANCE OF DAMS | Sep 18, 2018 | Sep 18, 2018 | Nov 3, 2019 | ||
| SCHEDULE A - STABILIZATION OF TWO ROCK SLOPE SITES (TEMPORARY FIX) 1. INSTALLATION OF TEMPORARY TRAFFIC CONTROL DEVICES AND COORDINATION WITH OTHER CONTRACTOR(S) WORKING WITHIN PROJECT SITE. 2. ROCK SCALING TO REMOVE ANY LOOSE ROCK AND MATERIALS FROM SLOPE FACE THAT MAY PRESENT HAZARD TO TRAFFIC AND WORKERS. ROCK SLOPES SHOULD BE SCALED FROM TOP DOWN. ONLY HAND TOOLS BE UTILIZED DURING ROCK SCALING AND NO MACHINE SCALING SHOULD BE ALLOWED. THE EXACT LOCATIONS AND THE EXTENT OF THE AREAS TO BE SCALED WILL BE DETERMINED IN THE FILED BY THE CO. SALVAGE ALL SCALED ROCK AND DELIVER TO DANGERFIELD ISLAND, LOCATED APPROXIMATELY 9 MILES FROM PROJECT SITE. 3. DESIGN AND INSTALLATION OF TENSIONED ROCK ANCHORS ALONG THE CREST OF THE SLOPE. PROOF TEST ALL ROCK ANCHORS FOR A LOAD OF 50 KIPS. LOCK ANCHORS AT 7 KIPS 4. DESIGN AND INSTALLATION OF ACTIVE DRAPED ROCKFALL PROTECTION. SUSPEND ROCKFALL DRAPE ALONG THE CREST OF THE SLOPE AND DRAPE IT DOWN THE FACE SO AS TO RESTRAIN LOOSE AND BROKEN ROCK THAT MAY FALL. THE DRAPE SHOULD BE TERMINATED 4 FT ABOVE THE GROUND SURFACE. THE NET SHOULD CONSIST OF A LIGHTER MESH OVERLAIN BY A LARGE OPENING WIRE OR STEEL STRAND MESH NETTING. THE HIGH TENSILE STEEL WIRE FOR THE LARGE OPENING MESH SHOULD HAVE A MINIMUM DIAMETER OF 0.157 IN (4 MM) AND A TENSILE STRENGTH STEEL WIRE OF EQUAL TO OR GREATER THAN 256 KSI. 5. TEMPORARY TRAFFIC CONTROL CONCRETE BARRIERS FOR LANE CLOSURE AT MP 7.25 WILL REMAIN IN PLACE TILL APRIL 2011. PRICE FOR CONCRETE BARRIER PAID FOR ONCE. ANY RELOCATION OR MOVEMENT OF BARRIER IS INCIDENTAL TO BARRIER COST. | COASTAL DRILLING EAST, LLC | $3,092,924 | FEDERAL HIGHWAY ADMINISTRATION | FEDERAL HIGHWAY ADMINISTRATION | — | 237310Highway, Street, and Bridge Construction | Y1LBCONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Oct 13, 2011 | Oct 13, 2011 | Sep 27, 2013 | ||
| DRILLING AND GROUTING - RECLAMATION WORK | COASTAL DRILLING EAST, LLC | $382,716 | OFFICE OF SURFACE MINING, RECLAMATION AND ENFORCEMENT | — | — | 237990Other Heavy and Civil Engineering Construction | Z300 | Feb 14, 2006 | Feb 15, 2006 | May 4, 2006 |