Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| THE A-E FIRM SHALL VALIDATE THE PROJECT REQUIREMENTS AND PREPARE A REVISED DRAFT AND FINAL DD1391. RENOVATE IMF FOR LRSO BUILDING 1134 AT MINOT AFB, ND WILL COVER ONLY A PORTION OF THE BUILDINGS FOOTPRINT TO INCLUDE ADMIN SPACE AND WORK BAY AREA. | KENNETH HAHN ARCHITECTS INC | $187,426 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C1AZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER ADMINISTRATIVE FACILITIES/SERVICE BUILDINGS | Sep 26, 2025 | Oct 22, 2025 | Sep 30, 2026 | ||
| THE A-E FIRM SHALL VALIDATE THE PROJECT SCOPE, SITE, REQUIREMENTS, COSTS, AND PREPARE A REVISED DRAFT AND FINAL DD1391. THE RENOVATE B-52 SQUADRON OPS BUILDING, B475 WILL COVER ONLY THE 3RD FLOOR, TO INCLUDE SPECIAL ACCESS PROGRAM FACILITY (SAPF). | KENNETH HAHN ARCHITECTS INC | $205,766 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C1AAARCHITECT AND ENGINEERING- CONSTRUCTION: OFFICE BUILDINGS | Sep 26, 2025 | Oct 22, 2025 | Oct 22, 2026 | ||
| THE A-E FIRM SHALL VALIDATE THE PROJECT REQUIREMENTS AND PREPARE A REVISED DRAFT AND FINAL DD1391. IT WILL ALSO PROVIDE THE DESIGNER WITH A BASIS FOR UNDERSTANDING THE PROJECT REQUIREMENTS AND ESTABLISHES A FRAMEWORK FOR PROJECT EXECUTION. | KENNETH HAHN ARCHITECTS INC | $204,484 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C1AZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER ADMINISTRATIVE FACILITIES/SERVICE BUILDINGS | Sep 26, 2025 | Oct 22, 2025 | Sep 30, 2026 | ||
| THE A-E DESIGN SERVICES INCLUDE, BUT NOT LIMITED TO, RECONSTRUCTION OF FLIGHTLINE DRIVE: STORM SEWER, DRAINAGE, SUBGRADE, PAVEMENTS, CURB, GUTTER, SIGNAGE, PAVEMENT MARKINGS, AND OTHER INCIDENTAL FEATURES TO MEET FUTURE TRAFFIC LOADINGS. | KENNETH HAHN ARCHITECTS INC | $485,084 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C1LBARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | Sep 11, 2025 | Oct 1, 2025 | Jun 30, 2026 | ||
| DESIGN DPAA FORENSIC LABORATORY FACILITY AT OFFUTT AIR FORCE BASE, NEBRASKA | KENNETH HAHN ARCHITECTS INC | $3,830,279 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Aug 25, 2025 | Aug 27, 2025 | Aug 31, 2026 | ||
| DESIGN THE REPLACEMENT OF THE HVAC SYSTEM IN BUILDING 774 PMEL TO MEET ALL REGULATORY REQUIREMENTS. | KENNETH HAHN ARCHITECTS INC | $210,997 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C223ARCHITECT AND ENGINEERING- GENERAL: MECHANICAL SYSTEMS | Jul 11, 2025 | Aug 1, 2025 | Aug 1, 2026 | ||
| DESIGN SERVICES TO RECONSTRUCTION OF THE B870 PARKING LOT, INCLUDING STORM SEWER SYSTEMS, DRAINAGE SOLUTIONS, SUBGRADE IMPROVEMENTS, PAVEMENTS, CURBS, GUTTERS, PAVEMENT MARKINGS, AND OTHER FEATURES TO ACCOMMODATE CURRENT AND PLANNED PARKING LOADS. | KENNETH HAHN ARCHITECTS INC | $153,942 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C1LZARCHITECT AND ENGINEERING- CONSTRUCTION: PARKING FACILITIES | Jul 2, 2025 | Jul 18, 2025 | Mar 1, 2026 | ||
| THE ARCHITECT-ENGINEER (A-E) WILL PROVIDE POST AWARD CONSTRUCTION A-E TITLE II SITE AND INSPECTION SERVICES IN SUPPORT OF THE CONSTRUCTION PROJECT 195777, CONSTRUCT MILITARY WORKING DOG (MWD) KENNEL, LOCATED AT MCCONNELL AFB, WICHITA, KS. | KENNETH HAHN ARCHITECTS INC | $90,667 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541310Architectural Services | C213ARCHITECT AND ENGINEERING- GENERAL: INSPECTION (NON-CONSTRUCTION) | Jun 17, 2025 | Jun 16, 2025 | Jun 15, 2026 | ||
| THE A-E DESIGN TEAM CONTRACTOR SHALL PROVIDE A-E DESIGN SERVICES REQUIRED TO DELIVER 100% COMPLETE CONSTRUCTION BID DOCUMENTS NECESSARY FOR THE ACCOMPLISHMENT OF PROJECT NO 1143173. REPLACE ROOF AND REMODEL MOC BATHROOMS, B768. | KENNETH HAHN ARCHITECTS INC | $102,155 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C1AAARCHITECT AND ENGINEERING- CONSTRUCTION: OFFICE BUILDINGS | Apr 23, 2025 | Mar 12, 2025 | Oct 1, 2025 | ||
| NWK SB AE IDIQ MATOC MINIMUM GUARANTEE- KENNETH HAHN ARCHITECTS, INC. | KENNETH HAHN ARCHITECTS INC | $2,500 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | R707SUPPORT- MANAGEMENT: CONTRACT/PROCUREMENT/ACQUISITION SUPPORT | Apr 18, 2025 | Apr 18, 2025 | Apr 1, 2030 | ||
| THIS PROJECT WILL ALTER AND EXPAND THE EXISTING WASTEWATER TREATMENT PLANT AT MOUNT RUSHMORE NATIONAL MEMORIAL AND ENLARGE THE EXISTING PLANT CAPACITY FOR FLOW AND TREATMENT. THE PLANT PROCESSES WASTEWATER FROM RESTROOMS AND CONCESSION OPERATIONS THA | KENNETH HAHN ARCHITECTS INC | $448,616 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 541310Architectural Services | C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | Feb 11, 2025 | Feb 11, 2025 | Jan 1, 2027 | ||
| PCR FOR DEMOLISH BLDGS 501, 522, AND 597 | KENNETH HAHN ARCHITECTS INC | $1,442,627 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 27, 2024 | Sep 27, 2024 | Dec 1, 2025 | ||
| AREA DEVELOPMENT PLAN FOR US STRATEGIC COMMAND | KENNETH HAHN ARCHITECTS INC | $1,252,156 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 27, 2024 | Sep 30, 2024 | Sep 30, 2025 | ||
| DESIGN SERVICES FOR WELCOME PARK AT INDEPENDENCE NATIONAL HISTORICAL PARK. | KENNETH HAHN ARCHITECTS INC | $296,851 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 541310Architectural Services | C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | Sep 25, 2024 | Sep 25, 2024 | May 30, 2025 | ||
| PCR-1 DELTA 3 PETERSON SFB | KENNETH HAHN ARCHITECTS INC | $639,948 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 24, 2024 | Sep 25, 2024 | Oct 31, 2025 | ||
| ARCHITECT AND ENGINEERING SERVICES INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT | KENNETH HAHN ARCHITECTS INC | $428,333 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C1AAARCHITECT AND ENGINEERING- CONSTRUCTION: OFFICE BUILDINGS | Sep 19, 2024 | Sep 19, 2024 | Jun 20, 2025 | ||
| UPGRADE ELECTIRCAL DISTRIBUTION SYS PCR | KENNETH HAHN ARCHITECTS INC | $392,602 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 13, 2024 | Sep 17, 2024 | Mar 13, 2026 | ||
| DEVELOP DESIGN BUILD RFP PACKAGE DOCUMENTS THAT OUTLINE REPAIRS REQUIRED FOR B44 AND INCLUDES FURTHER DEVELOPMENT OF THE PROVIDED DB TEMPLATE IN A FORMAT THAT CAN BE TAILORED TO PROJECTS OF VARYING SCOPES, DISCIPLINES, AND COST THRESHOLDS. | KENNETH HAHN ARCHITECTS INC | $69,622 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C220ARCHITECT AND ENGINEERING- GENERAL: STRUCTURAL ENGINEERING | Sep 11, 2024 | Sep 11, 2024 | Jun 6, 2025 | ||
| DESIGN AN ADDITIONAL NEW ELEVATOR IN THE BUILDING 1003 LOADING DOCK TO THE EXACT SPECIFICATIONS, PARTS, FUNCTION, AND CAPABILITIES AS THE EXISTING FREIGHT ELEVATOR, OR IF NOT, AS SIMILAR AS PHYSICALLY POSSIBLE. | KENNETH HAHN ARCHITECTS INC | $111,585 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C220ARCHITECT AND ENGINEERING- GENERAL: STRUCTURAL ENGINEERING | Aug 30, 2024 | Sep 16, 2024 | Feb 13, 2025 | ||
| DESIGN MECHANICAL AND ELECTRICAL CONNECTIONS TO INCLUDE BUILDING MANAGEMENT SYSTEM MODIFICATIONS REQUIRED TO SUPPORT MOBILIZATION, STARTUP, AND CONTINUOUS OPERATIONS OF EXTERNAL AIR-COOLED CHILLERS TO SUPPORT THE C2F CAMPUS COOLING REQUIREMENTS. | KENNETH HAHN ARCHITECTS INC | $73,425 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C220ARCHITECT AND ENGINEERING- GENERAL: STRUCTURAL ENGINEERING | Aug 28, 2024 | Sep 16, 2024 | Mar 21, 2025 | ||
| GENERAL SERVICES ADMINISTRATION. WORK ORDER 19 IS ISSUED FOR A FACADE AND HVAC STUDY AT THE EDWARD ZORINSKY FEDERAL BUILDING. 1616 CAPITOL AVE, OMAHA, NE 68102 | KENNETH HAHN ARCHITECTS INC | $82,730 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 541310Architectural Services | C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | Jul 31, 2024 | Jul 31, 2024 | Apr 7, 2025 | ||
| AE DESIGN MECHANICAL VENTILATION SYSTEMS FOR SUB-STATION 5, B457 | KENNETH HAHN ARCHITECTS INC | $51,716 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C220ARCHITECT AND ENGINEERING- GENERAL: STRUCTURAL ENGINEERING | Jul 3, 2024 | Jul 8, 2024 | Dec 5, 2024 | ||
| FOLS - ALARM SYSTEM TITLE III SERVICES | KENNETH HAHN ARCHITECTS INC | $0 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 541310Architectural Services | C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | Jul 1, 2024 | Jul 1, 2024 | Aug 7, 2024 | ||
| BADL, BEN RIEFEL VISITOR CENTER AE DD-CD SERVICES | KENNETH HAHN ARCHITECTS INC | $898,888 | NATIONAL PARK SERVICE | NATIONAL PARK SERVICE | — | 541310Architectural Services | C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | Jun 17, 2024 | Jun 17, 2024 | Aug 29, 2025 | ||
| EVALUATE SCIF ELECTRICAL SYSTEM UNDER UTILITY AND GENERATOR POWER, IDENTIFY ISSUES, AND DESIGN A RELIABLE GENERATOR CONNECTION POINT FOR OUTAGES. | KENNETH HAHN ARCHITECTS INC | $30,999 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | Jun 14, 2024 | Jun 14, 2024 | Jan 20, 2025 |