Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPAIR FAILED AIR CONDITIONING SYSTEM AT THE PIKES PEAK NATIONAL CEMETERY MAINTENANCE BUILDING | HARTLAND EXCAVATION, INC. | $8,995 | VETERANS AFFAIRS, DEPARTMENT OF | VETERANS AFFAIRS, DEPARTMENT OF | — | 238220Plumbing, Heating, and Air-Conditioning Contractors | J041MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT | Sep 7, 2023 | Sep 20, 2023 | Dec 29, 2023 | ||
| RAMPART RANGE LVL 3 RD MTC | HARTLAND EXCAVATION, INC. | $37,306 | FOREST SERVICE | FOREST SERVICE | — | 237310Highway, Street, and Bridge Construction | Y222 | Jun 7, 2011 | Jun 7, 2011 | Dec 20, 2011 | ||
| DECOM SPRINGDALE & DEVILS HEAD TLTS, S.MEADOWS DUMP STA | HARTLAND EXCAVATION, INC. | $9,565 | FOREST SERVICE | FOREST SERVICE | — | 238910Site Preparation Contractors | Y294 | Feb 28, 2011 | Feb 28, 2011 | May 15, 2011 | ||
| NON-PERSONAL SERVICES - DEBRIS REMOVAL | HARTLAND EXCAVATION, INC. | $1,724 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 562119Other Waste Collection | P999SALVAGE- OTHER | Feb 15, 2011 | Feb 15, 2011 | Feb 15, 2012 | ||
| NFSR 2250-PWC ROAD RESURFACING | HARTLAND EXCAVATION, INC. | $0 | FOREST SERVICE | FOREST SERVICE | — | 237990Other Heavy and Civil Engineering Construction | C122 | Jun 2, 2010 | Jun 2, 2010 | Jul 26, 2010 | ||
| CONCRETE DEBRIS REMOVAL | HARTLAND EXCAVATION, INC. | $7,686 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 562119Other Waste Collection | P999SALVAGE- OTHER | Jan 4, 2010 | Dec 30, 2009 | Dec 31, 2010 | ||
| HAYMAN ROAD DECOMMISSIONING | HARTLAND EXCAVATION, INC. | $24,896 | FOREST SERVICE | — | — | 237990Other Heavy and Civil Engineering Construction | Y222 | Sep 21, 2009 | Sep 21, 2009 | Dec 31, 2009 | ||
| FARLEY AND STACKOW ISOLATED CABIN REMOVAL PROJECT DESCRIPTION: THIS PROJECT CONSISTS OF THE DEMOLITION AND REMOVAL OF 2 (QTY) CABINS AS WELL AS 2 (QTY) PIT TOILETS. ALL DEBRIS SHALL BE REMOVED FROM THE PROJECT SITES. ALL DISTURBED AREAS SHALL BE GRADED, SCARIFIED, SEEDED AND MULCHED, AND REHABILITED TO A NEAR NATURAL CONDITION AS DIRECTED BY THE CONTRACTING OFFICER. LOCATION: ALL ISOLATED CABINS ARE LOCATED ON THE BOULDER RANGER DISTRICT. STACKOW AND FARLEY CABINS ARE NOT LOCATED ON THE SAME SITE. STACKOW ISOLATED CABIN LOCATION: FROM ROLLINSVILLE, TAKE HW 119 SOUTH FOR A DISTANCE OF APPROXIMATELY 1 MILE. TURN RIGHT (SOUTH) ONTO CINDY LN. CONTINUE ON CINDY LN FOR A DISTANCE OF APPROXIMATELY 1 MILE. THE TURNOUT FOR THE CABIN IS LOCATED ON THE WEST SIDE OF CINDY LN. THE COORDINATES OF THE STRUCTURES ARE: N 39 53 38.4 , W 105 29 39.5 . FARLEY ISOLATED CABIN LOCATION: FROM NEDERLAND, TAKE HWY 119 SOUTH APPROXIMATELY 2 MILES. THEN FOLLOW HWY 132-W WEST APPROXIMATELY 1.5 MILES, AND TAKE THE LEFT BRANCH WHERE THE ROAD SPLITS. CONTINUE FOR APPROXIMATELY 0.5 MILES, AND TAKE A RIGHT ON THE FIRST AVAILABLE ROAD. THE STRUCTURES ARE LOCATED AT THE END OF THE ROAD. THE COORDINATES OF THE STRUCTURES ARE N 39O 56 30.2 W 105O 31 18.4 . PROJECT TIME: 45 CALENDAR DAYS. SET ASIDE STATUS: SMALL DISABLED VETERAN OWNED BUSINESS SET ASIDE. | HARTLAND EXCAVATION, INC. | $20,455 | FOREST SERVICE | — | — | 238910Site Preparation Contractors | P400SALVAGE- DEMOLITION OF BUILDINGS | Sep 16, 2009 | Sep 16, 2009 | Dec 31, 2009 | ||
| FINDLEY GULCH CULVERT REPLACEMENT | HARTLAND EXCAVATION, INC. | $19,546 | FOREST SERVICE | — | — | 237990Other Heavy and Civil Engineering Construction | AD61 | Sep 2, 2009 | Sep 2, 2009 | Nov 30, 2009 | ||
| HARTLAND EXCAVATION KEVIN DUIS | HARTLAND EXCAVATION, INC. | $522,583 | FOREST SERVICE | FOREST SERVICE | — | 237990Other Heavy and Civil Engineering Construction | Y299 | Jun 5, 2009 | Jun 5, 2009 | May 31, 2012 | ||
| FR 300-RAMPART RANGE RD GRADING | HARTLAND EXCAVATION, INC. | $0 | FOREST SERVICE | — | — | 237990Other Heavy and Civil Engineering Construction | F004NATURAL RESOURCES/CONSERVATION- FOREST/RANGE FIRE REHABILITATION (NON-CONSTRUCTION) | Jun 3, 2009 | Jun 3, 2009 | Oct 28, 2009 | ||
| SPK/SPL LVL 3 RD MTCE | HARTLAND EXCAVATION, INC. | $0 | FOREST SERVICE | — | — | 237990Other Heavy and Civil Engineering Construction | F004NATURAL RESOURCES/CONSERVATION- FOREST/RANGE FIRE REHABILITATION (NON-CONSTRUCTION) | May 15, 2009 | May 15, 2009 | Oct 28, 2009 | ||
| TAS::12 1102::TAS FOR CAPITAL IMPROVEMENT AND MAINTENANCE ARRA::YES::ARRA | HARTLAND EXCAVATION, INC. | $65,718 | FOREST SERVICE | — | — | 238910Site Preparation Contractors | Z199 | Apr 15, 2009 | Apr 15, 2009 | Sep 30, 2009 | ||
| FOREST ROAD 44. | HARTLAND EXCAVATION, INC. | $649,461 | FOREST SERVICE | FOREST SERVICE | — | 237310Highway, Street, and Bridge Construction | AD61 | Sep 26, 2008 | Sep 26, 2008 | Dec 21, 2011 | ||
| — | HARTLAND EXCAVATION, INC. | $21,430 | FOREST SERVICE | — | — | 237990Other Heavy and Civil Engineering Construction | Y299 | Sep 19, 2008 | Sep 19, 2008 | Nov 30, 2008 | ||
| — | HARTLAND EXCAVATION, INC. | $37,926 | FOREST SERVICE | — | — | 238910Site Preparation Contractors | P500SALVAGE- DEMOLITION OF STRUCTURES/FACILITIES (OTHER THAN BUILDINGS) | Sep 18, 2008 | Sep 18, 2008 | Jan 15, 2009 | ||
| LEVEL 3 ROAD MAINTENANCE ON S.PARK RD, PIKE NATIONAL FOREST | HARTLAND EXCAVATION, INC. | $42,892 | FOREST SERVICE | — | — | 237990Other Heavy and Civil Engineering Construction | F004NATURAL RESOURCES/CONSERVATION- FOREST/RANGE FIRE REHABILITATION (NON-CONSTRUCTION) | Jun 6, 2008 | Jun 6, 2008 | Dec 5, 2008 | ||
| — | HARTLAND EXCAVATION, INC. | $24,995 | FOREST SERVICE | — | — | 237310Highway, Street, and Bridge Construction | Z222 | Sep 21, 2007 | Sep 21, 2007 | Oct 30, 2007 | ||
| RAMPART RANGE ROAD SURFACE TREATMENT | HARTLAND EXCAVATION, INC. | $43,527 | FOREST SERVICE | — | — | 237310Highway, Street, and Bridge Construction | Y222 | May 21, 2007 | May 21, 2007 | Jul 13, 2007 | ||
| IDIQ ROADS AND RELATED CONSTRUCTION SAN ISABEL | HARTLAND EXCAVATION, INC. | $230,653 | FOREST SERVICE | FOREST SERVICE | — | 237990Other Heavy and Civil Engineering Construction | Y299 | May 15, 2007 | May 15, 2007 | Nov 17, 2010 | ||
| IDIQ ROAD CONST PIKE N | HARTLAND EXCAVATION, INC. | $0 | FOREST SERVICE | — | — | 237990Other Heavy and Civil Engineering Construction | Y299 | May 14, 2007 | May 14, 2007 | May 26, 2010 | ||
| INSTALL EXHAUST FAN B. 8000 | HARTLAND EXCAVATION, INC. | $7,465 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 236210Industrial Building Construction | Y199 | Sep 29, 2006 | Sep 29, 2006 | Nov 13, 2006 | ||
| — | HARTLAND EXCAVATION, INC. | $4,850 | FOREST SERVICE | — | — | 238990All Other Specialty Trade Contractors | P500SALVAGE- DEMOLITION OF STRUCTURES/FACILITIES (OTHER THAN BUILDINGS) | Jul 26, 2006 | Jul 26, 2006 | Aug 15, 2006 | ||
| TRENCHIN AT WILDERNESS AND BUTTS ROAD | HARTLAND EXCAVATION, INC. | $5,675 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 236210Industrial Building Construction | Y199 | May 2, 2006 | May 2, 2006 | Jun 2, 2006 | ||
| AG RANCH IRRIGATION PROJECT | HARTLAND EXCAVATION, INC. | $22,060 | FOREST SERVICE | — | — | 237110Water and Sewer Line and Related Structures Construction | Y212 | Sep 17, 2005 | Sep 17, 2005 | — |