• ⌘ + K
  • Home
  • 0
    Inbox
Explore
  • Browse All
  • Health
  • FedCiv
  • Defense
  • Events
Work
  • Teaming Hub
  • Watchlists
  • Bookmarks
  • Notes
Research
  • Grants
    • Contracts
    • Vehicles
    • OTAs
    • OTIDVs
  • Agencies
  • NAICS
  • PSC
  • DOGE Tracker

Federal Contract Awards

28awards

Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.

Awardee
is
HWG4CG5VK931
Award ID
Description
Recipient
Total Value
Awarding Agency
Funding Agency
Set Aside
NAICS
PSC
Award Date
Start Date
End Date
31310024P0039
INNOVATIVE CABLE CONDITION MONITORING METHODSANALYSIS AND MEASUREMENT SERVICES CORPORATION$198,994NUCLEAR REGULATORY COMMISSIONNUCLEAR REGULATORY COMMISSION—541690Other Scientific and Technical Consulting ServicesAG42ENERGY R&D SERVICES; ENERGY INFORMATION, POLICY AND REGULATION; APPLIED RESEARCHSep 27, 2024Sep 27, 2024Dec 31, 2025
1333ND18PNB730184
CHAR CABLE CONDITION MONITORING SYSTEM AS A CONDITION MONITORING TOOL FOR LOW VOLTAGE CABLES.ANALYSIS AND MEASUREMENT SERVICES CORPORATION$100,000NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGYNUCLEAR REGULATORY COMMISSION—541330Engineering ServicesR425SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICALJul 26, 2018Jul 26, 2018Dec 31, 2020
DOCSB134112SU1209
POLYMER AGING MONITORANALYSIS AND MEASUREMENT SERVICES CORPORATION$60,000NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGYNATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY—334516Analytical Laboratory Instrument Manufacturing6640LABORATORY EQUIPMENT AND SUPPLIESSep 6, 2012Sep 6, 2012Jan 4, 2014
NNX11CA41C
THE HEALTH AND INTEGRITY OF AIRCRAFT SENSORS PLAY A CRITICAL ROLE IN AVIATION SAFETY. UNFORTUNATELY, INACCURATE OR FALSE READINGS FROM THESE SENSORS CAN LEAD TO IMPROPER DECISION-MAKING RESULTING IN SERIOUS AND SOMETIMES FATAL CONSEQUENCES. THE RESEARCH PERFORMED IN PHASE I DEMONSTRATED THE FEASIBILITY OF USING ADVANCED DATA ANALYSIS TECHNIQUES TO IDENTIFY ANOMALIES IN PITOT TUBES RESULTING FROM BLOCKAGE SUCH AS ICING, MOISTURE, OR FOREIGN OBJECTS. THE CORE TECHNOLOGY USED IN THIS PROJECT IS REFERRED TO AS "NOISE ANALYSIS" SINCE IT RELATES A SENSOR'S RESPONSE TIME TO THE DYNAMIC COMPONENT (NOISE) FOUND IN THE SIGNAL OF THESE SAME SENSORS. THIS ANALYSIS TECHNIQUE HAS USED EXISTING ELECTRICAL SIGNALS OF PITOT TUBE SENSORS THAT RESULT FROM MEASURED PROCESSES DURING IN-FLIGHT CONDITIONS AND/OR INDUCED SIGNALS IN PRE-FLIGHT CONDITIONS TO DETECT ANOMALIES IN THE SENSOR READINGS.ANALYSIS AND MEASUREMENT SERVICES CORPORATION$599,904NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541712AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCHJun 1, 2011Jun 1, 2011Nov 30, 2013
NNX11CA79C
THE PRIMARY GOAL OF THIS PROJECT IS TO DESIGN AND DEVELOP AN AUTONOMOUS INSTRUMENTATION AND CONTROL (I&C) HEALTH MONITORING SYSTEM FOR SPACE NUCLEAR POWER APPLICATIONS. THE SYSTEM, ONCE FULLY DEVELOPED, WILL BE ABLE TO DETECT SYSTEM ANOMALIES BASED ON ANALYTICAL MODELING TECHNIQUE USING DATA FROM EXISTING SENSORS IN THE POWER GENERATOR. THE PRIMARY APPLICATION FOR THE PROPOSED TECHNOLOGY WILL BE WITH SPACE NUCLEAR REACTORS AND THE NON-NUCLEAR TEST SYSTEMS THAT ARE BEING USED FOR COMPONENT AND SYSTEM LEVEL VALIDATION.ANALYSIS AND MEASUREMENT SERVICES CORPORATION$599,869NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541712AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCHJun 1, 2011Jun 1, 2011Nov 30, 2013
N6553810C0040
STATUS REPORTANALYSIS AND MEASUREMENT SERVICES CORPORATION$149,666Department of the NavyDEPT OF THE NAVY—541712AD21Jul 13, 2010Jul 13, 2010Jan 12, 2011
NNX10CD36P
THERE CURRENTLY EXISTS NO END-TO-END REACTOR/POWER CONVERSION MONITORING SYSTEM THAT CAN PROVIDE BOTH AUTONOMOUS HEALTH MONITORING, BUT ALSO IN-SITU SENSOR CALIBRATION AND RESPONSE TIME TESTING WITHOUT HUMAN INTERFACE. ONE OF THE KEY CHALLENGES FACING SPACE NUCLEAR POWER SYSTEMS IS THEIR EXTREMELY REMOTE LOCATION AND REQUIREMENT FOR MULTI-YEAR MISSIONS. THE CURRENT BENCHMARK SYSTEM HAS A MISSION LIFE OF AT LEAST 8 YEARS DURING WHICH TIME THERE IS NO OPPORTUNITY FOR REPAIR, SENSOR CALIBRATIONS, OR ANY MAINTENANCE OF ANY KIND. BY CONTRAST, TERRESTRIAL-BASED NUCLEAR POWER PLANTS UNDERGO PERIODIC OUTAGES DURING WHICH TIME SENSOR CALIBRATIONS CAN BE PERFORMED. CURRENT TECHNOLOGY RELIES HEAVILY ON REAL-TIME HUMAN INTERACTION, MONITORING AND CONTROL. DUE TO THE LONG COMMUNICATION TIMES BETWEEN THE EARTH AND MOON, OR MARS, REAL-TIME HUMAN CONTROL IS NOT POSSIBLE. THEREFORE, THESE EMERGING PROGRAMS HAVE A CRITICAL NEED TO DEVELOP AUTONOMOUS HEALTH MONITORING AND CONTROL TECHNOLOGY.ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541712AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCHJan 27, 2010Jan 29, 2010Jul 29, 2010
NNX10CC65P
THE HEALTH AND INTEGRITY OF AIRCRAFT SENSORS AND INSTRUMENTS PLAY A CRITICAL ROLE IN AVIATION SAFETY. HOWEVER, INACCURATE OR FALSE READINGS FROM THESE SAME SENSORS/INSTRUMENTS CAN LEAD TO IMPROPER DECISION-MAKING RESULTING IN SERIOUS IF NOT FATAL CONSEQUENCES. THIS PROPOSAL OFFERS A RESEARCH AND DEVELOPMENT (R&D) EFFORT TO DEMONSTRATE THE FEASIBILITY OF USING ADVANCED DATA ANALYSIS TECHNIQUES TO IDENTIFY FAILURES IN PITOT TUBES RESULTING FROM BLOCKAGE, ICING, OR MOISTURE. THESE DATA ANALYSIS TECHNIQUES WILL USE EXISTING ELECTRICAL SIGNALS OF PITOT TUBE SENSORS THAT RESULT FROM MEASURED PROCESSES DURING IN-FLIGHT CONDITIONS AND/OR INDUCED SIGNALS IN PRE-FLIGHT CONDITIONS TO DETECT ANOMALIES IN THE SENSOR READINGS.ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0NATIONAL AERONAUTICS AND SPACE ADMINISTRATIONNATIONAL AERONAUTICS AND SPACE ADMINISTRATION—541712AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCHJan 26, 2010Jan 29, 2010Jul 29, 2010
PURCH200008D00N7D264441000
—ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0TENNESSEE VALLEY AUTHORITY———S222HOUSEKEEPING- WASTE TREATMENT/STORAGEAug 15, 2000Aug 15, 2000Aug 15, 2000
PURCH199912D00N2H259703000
—ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0TENNESSEE VALLEY AUTHORITY———H259EQUIPMENT AND MATERIALS TESTING- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTSDec 15, 1999Dec 15, 1999Feb 15, 2000
PURCH199812D99N7D245859000
—ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0TENNESSEE VALLEY AUTHORITY———H266EQUIPMENT AND MATERIALS TESTING- INSTRUMENTS AND LABORATORY EQUIPMENTDec 15, 1998Dec 15, 1998Sep 15, 1999
PURCH199806D98N5F236071000
—ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0TENNESSEE VALLEY AUTHORITY———L059TECHNICAL REPRESENTATIVE- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTSJun 15, 1998Jun 15, 1998Oct 15, 1998
PURCH199710D98NAN104642001
—ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0TENNESSEE VALLEY AUTHORITY———J099Oct 15, 1997Oct 15, 1997Apr 15, 1998
PURCH199702D97N5F202452000
—ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0TENNESSEE VALLEY AUTHORITY———L059TECHNICAL REPRESENTATIVE- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTSFeb 15, 1997Feb 15, 1997Feb 15, 1997
PURCH199602D96N4E167875000
—ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0TENNESSEE VALLEY AUTHORITY———L059TECHNICAL REPRESENTATIVE- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTSFeb 15, 1996Feb 15, 1996Apr 15, 1996
NRCHQ199508DNRC0495079
—ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0NUCLEAR REGULATORY COMMISSION———AG51Aug 15, 1995Aug 15, 1995Sep 15, 1997
PURCH199507D95N4E146568000
—ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0TENNESSEE VALLEY AUTHORITY———L059TECHNICAL REPRESENTATIVE- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTSJul 15, 1995Jul 15, 1995Jul 15, 1995
NRCHQ199409DNRC0494088
—ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0NUCLEAR REGULATORY COMMISSION———AG51Sep 15, 1994Sep 15, 1994Sep 15, 1996
PURCH199408B93NLH84172C
—ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0TENNESSEE VALLEY AUTHORITY———U099EDUCATION/TRAINING- OTHERAug 15, 1994Aug 15, 1994Jul 15, 1995
PURCH199408B93NLH84105C
—ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0TENNESSEE VALLEY AUTHORITY———9999MISCELLANEOUS ITEMSAug 15, 1994Aug 15, 1994Jul 15, 1995
NRCHQ199407DNRC0494066
—ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0NUCLEAR REGULATORY COMMISSION———AG52Jul 15, 1994Jul 15, 1994Jan 15, 1995
MSFC0199405BNAS840165
—ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0NATIONAL AERONAUTICS AND SPACE ADMINISTRATION———AR91May 15, 1994May 15, 1994Jan 15, 1996
PURCH199403D94N3F104642
—ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0TENNESSEE VALLEY AUTHORITY———H266EQUIPMENT AND MATERIALS TESTING- INSTRUMENTS AND LABORATORY EQUIPMENTMar 15, 1994Mar 15, 1994Apr 15, 1998
MSFC0199402DNAS840165
—ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0NATIONAL AERONAUTICS AND SPACE ADMINISTRATION———AR91Feb 15, 1994Feb 15, 1994Jan 15, 1996
MSFC0199305BNAS839814
—ANALYSIS AND MEASUREMENT SERVICES CORPORATION$0NATIONAL AERONAUTICS AND SPACE ADMINISTRATION———AR91May 15, 1993May 15, 1993Jun 15, 1993
Page 1 of 2
  • Previous
  • Next