• ⌘ + K
  • Home
  • 0
    Inbox
Explore
  • Browse All
  • Health
  • FedCiv
  • Defense
  • Events
Work
  • Teaming Hub
  • Watchlists
  • Bookmarks
  • Notes
Research
  • Grants
    • Contracts
    • Vehicles
    • OTAs
    • OTIDVs
  • Agencies
  • NAICS
  • PSC
  • DOGE Tracker

Federal Contract Awards

57awards

Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.

Awardee
is
JQ1EULCXLK28
Award ID
Description
Recipient
Total Value
Awarding Agency
Funding Agency
Set Aside
NAICS
PSC
Award Date
Start Date
End Date
W912DQ12C4010
IGF::OT::IGF REPLACE WATER LINES PHASE 1 FORT RILEY, KANSAS. THE WORK INCLUDES THE REPLACEMENT OF THE EXISTING POTABLE WATER DISTRIBUTION SYSTEM IN THE HISTORIC MAIN POST AREA OF FORT RILEY, KANSAS. REPLACEMENT WORK INCLUDES INSTALLATION OF WATER MAINS, SERVICE LINES, FIRE HYDRANTS, VALVES, METERS AND INCIDENTAL RELATED WORK AS SHOWN IN DRAWINGS AND SPECIFICATIONS FOR THE PROJECT. THE CONTRACTOR WILL PROVIDE ALL WORK TO REPLACE PHASE I OF THE WATER DISTRIBUTION SYSTEM. 500 LINEAR FOOT OF ROCK BORING AND/OR TRENCHING IS INCLUDED IN THIS ITEM.BEAR PAW CONSTRUCTION, INC$4,804,277DEPT OF THE ARMYDEPT OF THE ARMY—237110Water and Sewer Line and Related Structures ConstructionY1PZCONSTRUCTION OF OTHER NON-BUILDING FACILITIESSep 7, 2012Sep 7, 2012Jan 1, 2015
0004
CONSTRUCT ADA RAMP FOR BLD 43BEAR PAW CONSTRUCTION, INC$23,975DEPT OF THE ARMYDEPT OF THE ARMY—236220Commercial and Institutional Building ConstructionZ2JZREPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGSMar 30, 2012Mar 30, 2012May 14, 2012
0003
REPAIR GRANT POOLBEAR PAW CONSTRUCTION, INC$246,395DEPT OF THE ARMYDEPT OF THE ARMY—236220Commercial and Institutional Building ConstructionZ2PAREPAIR OR ALTERATION OF RECREATION FACILITIES (NON-BUILDING)Feb 28, 2012Feb 24, 2012May 14, 2012
GS06P12TEC0018
ROOF REPAIRS PER THE ATTACHED SCOPE OF WORK AT BUILDING 2, 1500 E. BANNISTER ROAD, KCMOBEAR PAW CONSTRUCTION, INC$14,113PUBLIC BUILDINGS SERVICEPUBLIC BUILDINGS SERVICE—236220Commercial and Institutional Building ConstructionZ1AAMAINTENANCE OF OFFICE BUILDINGSFeb 22, 2012Feb 22, 2012May 31, 2012
0002
RENOVATE VIP AREA AT BUILDING 132BEAR PAW CONSTRUCTION, INC$39,763DEPT OF THE ARMYDEPT OF THE ARMY—236220Commercial and Institutional Building ConstructionZ1BZMAINTENANCE OF OTHER AIRFIELD STRUCTURESNov 14, 2011Nov 14, 2011Nov 23, 2011
GS06P11TEC0039
CONTRACTOR SHALL PROVIDE ALL SUPERVISION, EQUIPMENT, LABOR AND MATERIALS AS REQUIRED TO UPDATE ACCESS CONTROL SYSTEM WITH CARD READERS, ACCESS CONTROL EQUIPMENT FOR EXISTING DOORS, SOFTWARE, CABLING AND CONDUIT IN GSA S COMPUTER ROOM, 1500 E. BANNISTER ROAD,KANSAS CITY,BEAR PAW CONSTRUCTION, INC$13,251PUBLIC BUILDINGS SERVICEPUBLIC BUILDINGS SERVICE—238990All Other Specialty Trade Contractors7650DRAWINGS AND SPECIFICATIONSSep 28, 2011Sep 28, 2011Dec 31, 2011
0001
ADDITIONAL PARKING BLDG 465BEAR PAW CONSTRUCTION, INC$255,807DEPT OF THE ARMYDEPT OF THE ARMY—236220Commercial and Institutional Building ConstructionY299Sep 24, 2011Sep 24, 2011Jan 15, 2012
GS06P11TEC0031
SCOPE OF WORK: PROVIDE ALL LABOR, EQUIPMENT, MATERIALS, AND SUPERVISION TO PROVIDE OCCUPANCY SENSORS, POWER PACKS, RELAYS AND ALL OTHER EQUIPMENT AND MATERIALS TO CONVERT LIGHT FIXTURES TO TURN ON AND OFF AUTOMATICALLY VIA MOTION DETECTION. THIS WORK IS TO BE PERFORMED ON THE MALL LEVEL OF BUILDING #1 AT THE FEDERAL COMPLEX LOCATED AT 1500 E. BANNISTER ROAD, KANSAS CITY, MISSOURI. I. EXISTING CONDITIONS: 1.1 CONTRACTOR MUST VERIFY ALL MEASUREMENTS AND EXISTING CONDITIONS. II. DESCRIPTION OF WORK: 2.1 CONTRACTOR WILL PROVIDE LONG RANGE OCCUPANCY SENSOR, SENSOR POWER PACKS, CEILING MOUNTED SENSOR, SENSOR WITH BUILT IN RELAY, INFRARED CEILING MOUNT SENSOR AND OCCUPANCY SENSORS. 2.2 CONTRACTOR SHALL INSTALL ALSO PROVIDE AND INSTALL ANY ADDITIONAL MATERIAL OR EQUIPMENT AS NEEDED. III. EXECUTION: 3.1 CONTRACTOR SHALL ALL EQUIPMENT PER MANUFACTURER?S SPECIFICATIONS AND TESTS TO ENSURE EVERYTHING IS WORKING PROPERLY. IV. WORKMANSHIP: 4.1 ALL WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE BEST PRACTICES OF THE TRADE, AND BY ADEQUATELY TRAINED CONTRACTOR PERSONNEL THAT HAVE BEEN PERFORMING THE TYPE OF WORK SPECIFIED IN THIS CONTRACT. V. SPECIAL CONDITIONS: 5.1 ALL WORK MAY BE DONE DURING NORMAL BUSINESS HOURS. VI. MISCELLANEOUS: 6.1 THE CONTRACTOR WILL BE RESPONSIBLE FOR CLEANING UP THE WORK AREA OF ANY DEBRIS, TRASH OR OTHER MATERIAL OR EQUIPMENT (GENERATED BY THE CONTRACTOR) ON A DAILY BASIS AS WELL AS WHEN ALL THE WORK HAS BEEN COMPLETED. THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY DAMAGE DONE TO GOVERNMENT PROPERTY OR ANY UTILITY LINES DAMAGED DURING EXCAVATION. NO GOVERNMENT TRASH CONTAINERS OR DUMPSTERS SHALL BE USED BY THE CONTRACTOR. 6.2 CONTRACTOR SHALL PROVIDE ALL NECESSARY BARRICADES, CONSTRUCTION SIGNS, ETC. TO ENSURE THE SAFETY OF ALL EMPLOYEES, VISITORS OR ANY OTHER PEOPLE IN OR AROUND THE CONSTRUCTION AREA. 6.3 ALL WORK SHALL BE DONE IN A MANNER THAT MINIMIZES ANY DISRUPTION TO THE DAILY BUSINESS CONDUCTED AT THIS FEDERAL BUILDING. VII. COMPLIANCE WITH CODES: 7.1 ALL WORK, WORKMANSHIP, MATERIALS AND PROCEDURES WILL COMPLY WITH ALL LOCAL, STATE AND FEDERAL REGULATIONS. VIII. PRE-CONSTRUCTION MEETING: 8.1 THE CONTRACTOR WILL BE REQUIRED TO ATTEND A PRE-CONSTRUCTION MEETING AFTER THE AWARD OF THE CONTRACT AND PRIOR TO STARTING ANY WORK ON THIS PROJECT. COMPLETION TIME: 30 DAYS AFTER NOTICE TO PROCEED. WALK-THROUGH AT JOB SITE: PLEASE CONTACT BRYAN HUFF @ 816-823-1695 FOR AN APPOINTMENT TO VISIT THE WORK SITE. MR. HUFF WILL BE THE COORDINATOR FOR THIS PROJECT AND CAN ANSWER ANY QUESTIONS YOU MIGHT HAVE REGARDING THIS SOLICITATION.BEAR PAW CONSTRUCTION, INC$7,977PUBLIC BUILDINGS SERVICEPUBLIC BUILDINGS SERVICE—238210Electrical Contractors and Other Wiring Installation Contractors6145WIRE AND CABLE, ELECTRICALAug 9, 2011Aug 9, 2011Oct 14, 2011
V589KC1487
MAINTENANCE, REPAIR&REBUILDINGBEAR PAW CONSTRUCTION, INC$8,129VETERANS AFFAIRS, DEPARTMENT OFVETERANS AFFAIRS, DEPARTMENT OF—423450Medical, Dental, and Hospital Equipment and Supplies Merchant WholesalersJ041MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENTApr 20, 2011Apr 20, 2011Apr 30, 2011
V589KC0901
MAINTENANCE, REPAIR&REBUILDINGBEAR PAW CONSTRUCTION, INC$8,129VETERANS AFFAIRS, DEPARTMENT OFVETERANS AFFAIRS, DEPARTMENT OF—423450Medical, Dental, and Hospital Equipment and Supplies Merchant WholesalersJ099Apr 6, 2011Apr 6, 2011Apr 16, 2011
GS06P11TEC0014
LIGHT SENSORS AND SWITCHES, BUILDING 6, 1500 E. BANNISTER ROADBEAR PAW CONSTRUCTION, INC$41,795PUBLIC BUILDINGS SERVICEPUBLIC BUILDINGS SERVICE—238210Electrical Contractors and Other Wiring Installation Contractors6145WIRE AND CABLE, ELECTRICALFeb 23, 2011Feb 23, 2011May 10, 2011
GS06P11TEC0008
ELECTRICAL AND CABLING WORK FOR US FOREST SERVICEBEAR PAW CONSTRUCTION, INC$5,452PUBLIC BUILDINGS SERVICEPUBLIC BUILDINGS SERVICE—238210Electrical Contractors and Other Wiring Installation Contractors6145WIRE AND CABLE, ELECTRICALJan 5, 2011Jan 5, 2011Feb 8, 2011
0016
RAISED FLOOR IN SHERIDAN HALL 3RD FLOORBEAR PAW CONSTRUCTION, INC$58,793DEPT OF THE ARMYDEPT OF THE ARMY—236220Commercial and Institutional Building ConstructionZ111Sep 29, 2010Sep 29, 2010May 10, 2011
W912P910C0440
CHILLED WATER PLANT UPGRADEBEAR PAW CONSTRUCTION, INC$4,078,364DEPT OF THE ARMYVETERANS AFFAIRS, DEPARTMENT OF—236220Commercial and Institutional Building ConstructionZ141Sep 20, 2010Sep 20, 2010Oct 31, 2012
W912P910C0441
ITEM I - CONSTRUCTION PROJECT 08-113BEAR PAW CONSTRUCTION, INC$0DEPT OF THE ARMYVETERANS AFFAIRS, DEPARTMENT OF—236220Commercial and Institutional Building ConstructionY141Sep 20, 2010Sep 20, 2010Sep 30, 2013
0015
GRADING OF EXISTING BERM AREABEAR PAW CONSTRUCTION, INC$199,205DEPT OF THE ARMYDEPT OF THE ARMY—236220Commercial and Institutional Building ConstructionZ244Sep 15, 2010Sep 15, 2010Jun 3, 2011
W912P910C0439
VA SEWER LINES PROJECT 589-10-229BEAR PAW CONSTRUCTION, INC$3,500,000DEPT OF THE ARMYDEPT OF THE ARMY—237110Water and Sewer Line and Related Structures ConstructionZ244Sep 15, 2010Sep 15, 2010Aug 15, 2011
0014
BUILDING 77 ELEVATOR MODERNIZATIONBEAR PAW CONSTRUCTION, INC$284,027DEPT OF THE ARMYDEPT OF THE ARMY—236220Commercial and Institutional Building ConstructionZ111Aug 30, 2010Aug 30, 2010May 20, 2011
GS06P10TEC0043
PROVIDE ALL LABOR AND MATERIALS AS REQUIRED TO INSTALL OCCUPANCY SENSORS, POWER PACKS, RELAYS, AND ALL OTHER EQUIPMENT AND MATERIALS AS PER THE ATTACHED SCOPE OF WORK FOR 1500 BANNISTER ROAD, KANSAS CITY, MO, IN THE AMOUNT OF $8593.76BEAR PAW CONSTRUCTION, INC$0Public Buildings ServicePublic Buildings Service—236220Commercial and Institutional Building ConstructionZ111Aug 17, 2010Aug 17, 2010Sep 21, 2010
GS06P10TEC0038
INSTALL FORTY (40) ELECTRICAL RECEPTACLESBEAR PAW CONSTRUCTION, INC$0Public Buildings ServicePublic Buildings Service—236220Commercial and Institutional Building ConstructionZ111Jun 29, 2010Jun 29, 2010Aug 3, 2010
0002
TAS::96 3134::TAS RECOVERYPROJECT#::149255::RP# REPLACE SANITARY LINES IN BUILDING 26: 3RD FLOOR AND SECTIONS 3 & 4 OF 1ST FLOOR AT THE KANSAS CITY VA MEDICAL CENTER, KANSAS CITY, MOBEAR PAW CONSTRUCTION, INC$700,000DEPT OF THE ARMYDEPT OF THE ARMY—237110Water and Sewer Line and Related Structures ConstructionZ244Mar 12, 2010Mar 11, 2010Aug 31, 2010
W912DQ10C4005
TAS::21 2022::TAS RECOVERYPROJECT#::34227 REPAIR ELECTRICAL SYSTEM IN BLDG 136BEAR PAW CONSTRUCTION, INC$2,536,964DEPT OF THE ARMYDEPT OF THE ARMY—238210Electrical Contractors and Other Wiring Installation ContractorsZ219Feb 12, 2010Feb 12, 2010Jul 13, 2012
W912DQ10C4009
TAS::21 2022::TAS RECOVERY- 34229- REPAIR INT/EXT, HVAC TO LIBRARY, EISENHOWER HALL, #120BEAR PAW CONSTRUCTION, INC$3,423,175DEPT OF THE ARMYDEPT OF THE ARMY—236220Commercial and Institutional Building ConstructionY119Feb 11, 2010Feb 10, 2010Apr 15, 2012
0013
CONSTRUCT SECURITY CAGESBEAR PAW CONSTRUCTION, INC$44,336DEPT OF THE ARMYDEPT OF THE ARMY—236220Commercial and Institutional Building ConstructionZ111Sep 30, 2009Sep 30, 2009Nov 20, 2009
0001
REPLACE SANITARY LINES - PHASE IBEAR PAW CONSTRUCTION, INC$926,812DEPT OF THE ARMYDEPT OF THE ARMY—237110Water and Sewer Line and Related Structures ConstructionZ244Sep 28, 2009Sep 28, 2009Oct 31, 2010
Page 1 of 3
  • Previous
  • Next