| N40084-16-D-0026, N4008421F4573 CONSTRUCT GENERATOR FACILITY AT BLDG 1, CAMP FOSTER, OKINAWA, JAPAN (EPROJ#1697076/HQMC BU2401R) | SGE-SSFM JV | $167,856 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C1NZARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER UTILITIES | Jul 26, 2021 | Jul 27, 2021 | Apr 11, 2026 | ||
| X110 AE DESIGN TASK ORDER P349 NAFA SMART GRID WO# 1684820 | SGE-SSFM JV | $322,730 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Jun 3, 2021 | Jun 3, 2021 | Nov 11, 2024 | ||
| AE DESIGN TASK ORDER ELECTRICAL SCADA MODERNIZATION PH1 AND REPL | SGE-SSFM JV | $390,671 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C222ARCHITECT AND ENGINEERING- GENERAL: ELECTRICAL SYSTEMS | Mar 30, 2021 | Mar 30, 2021 | Jul 25, 2022 | ||
| IDIQ A-E, OPTION FOUR, ELECTRIAL ENGINEERING PROJECT IN JAPAN. THIS TASK ORDER IS TO PERFORM ENGINEERING STUDY FOR UPGRADING ELECTRICAL DISTRIBUTION SYSTEM NEW SANNO HOTEL, TOKYO, JAPAN WITH 234 CALENDAR DAYS AFTER DATE OF ORDER. | SGE-SSFM JV | $76,184 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C222ARCHITECT AND ENGINEERING- GENERAL: ELECTRICAL SYSTEMS | Sep 22, 2020 | Sep 23, 2020 | May 15, 2021 | ||
| N40084-16-D-0026, WR#202001 CONSTRUCT SUPPORT FACILITIES FOR THE G-ATOR RADAR SYSTEM, BLDGS 2221 AND 2395, CAMP HANSEN, OKINAWA, JAPAN (ESR852-15/HQMC BU2029R) | SGE-SSFM JV | $86,615 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C1BCARCHITECT AND ENGINEERING- CONSTRUCTION: RADAR AND NAVIGATIONAL FACILITIES | Aug 27, 2020 | Aug 31, 2020 | Sep 30, 2023 | ||
| N40084-16-D-0026, N4008420F4440 REPAIR AND ALTER SHOOT HOUSE, BLDG. 2472, CAMP HANS | SGE-SSFM JV | $82,615 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C1JZARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS | Jun 12, 2020 | Jun 12, 2020 | Sep 17, 2022 | ||
| N40084-16-D-0026, N4008420F4234, PCAS FOR REPAIR PRIMARY FEEDER3 WITH SWITCHING STATION, CAMP KINSER, OKINAWA, JAPAN | SGE-SSFM JV | $15,107 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C222ARCHITECT AND ENGINEERING- GENERAL: ELECTRICAL SYSTEMS | Mar 6, 2020 | Mar 6, 2020 | May 19, 2021 | ||
| N40084-16-D-0026, N4008420F4197 INSTALL DIESEL POWERED BACKUP GENERATOR, B5972, CAMP FOSTER, OKINAWA, JAPAN (RM447-19) | SGE-SSFM JV | $85,437 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C222ARCHITECT AND ENGINEERING- GENERAL: ELECTRICAL SYSTEMS | Feb 26, 2020 | Feb 25, 2020 | Dec 30, 2021 | ||
| N40084-16-D-0026-N4008419F4397/WO#1614253 ELECTRICAL ENGINEERING ASSESSMENT OF UPS SYSTEM AT USNH BUILDING 960 AT CAMP FOSTER, OKINAWA, JAPAN | SGE-SSFM JV | $90,472 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C222ARCHITECT AND ENGINEERING- GENERAL: ELECTRICAL SYSTEMS | May 13, 2019 | May 13, 2019 | Nov 25, 2019 | ||
| IGF::OT::IGF X007 AE DESIGN TASK ORDER; FY19 CFAY SMART GRID; 158 | SGE-SSFM JV | $275,275 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Nov 27, 2018 | Nov 27, 2018 | Dec 25, 2023 | ||
| N4008416D0026_N4008418F4748 SEISMIC ANALYSIS AND DETERIORATION SURVEY REPORT FOR REPAIR BEQ BLDG. 3332, CAMP SCHWAB, OKINAWA, JAPAN. | SGE-SSFM JV | $119,027 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C1FCARCHITECT AND ENGINEERING- CONSTRUCTION: TROOP HOUSING FACILITIES | Sep 24, 2018 | Sep 25, 2018 | Mar 4, 2019 | ||
| IGF::OT::IGF THE ARCHITECT-ENGINEERING (A-E) SHALL PERFORM SERVICES FOR PREPARATION OF A DESIGN-BID-BUILD (DBB) CONSTRUCTION CONTRACT DOCUMENT PACKAGE FOR SMART GRID MULTI-FACILITY DIRECT DIGITAL CONTROL (DDC) SYSTEM UPGRADE FOR MAIN BASE, COMMANDER FLEET ACTIVITIES SASEBO (CFAS), JAPAN FY2020 IN ACCORDANCE WITH THE SCOPE OF ARCHITECT-ENGINEER (A-E) SERVICES (SAES) FOR SPECIAL PROJECT RM17-1883 REVISION 2 AND SGE-SSFM JV'S REVISED A-E FEE PROPOSAL SUBMITTED ON 15 AUGUST 2018. | SGE-SSFM JV | $777,849 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C222ARCHITECT AND ENGINEERING- GENERAL: ELECTRICAL SYSTEMS | Sep 14, 2018 | Sep 10, 2018 | May 7, 2024 | ||
| TO FOR A-E STUDY FOR ROUTING OF EXISTING 6.6KV B FEEDERS DISTRIBUTION SYSTEM AND STRUCTURAL ASSESSMENT OF UTILITY TUNNEL. | SGE-SSFM JV | $398,938 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C222ARCHITECT AND ENGINEERING- GENERAL: ELECTRICAL SYSTEMS | Apr 23, 2018 | Apr 23, 2018 | Dec 7, 2018 | ||
| IGF::OT::IGF ELECTRICAL STUDY TO INSTALL PRIMARY AND SECONDARY GENERATORS AT DATA CENTER BLDG. 1710 WHITE BEACH FOR THE COMMANDER FLEET ACTIVITIES OKINAWA (CFAO), JAPAN. | SGE-SSFM JV | $66,315 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 28, 2016 | Sep 28, 2016 | Apr 28, 2017 | ||
| IGF::OT::IGF N40084-16-D-0026 TO001/WR#1 REPAIR PRIMARY FEEDER #3 WITH SWITCHING STATION, CAMP KINSER, OKINAWA, JAPAN (ESR036-14) | SGE-SSFM JV | $113,866 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541330Engineering Services | C222ARCHITECT AND ENGINEERING- GENERAL: ELECTRICAL SYSTEMS | Sep 14, 2016 | Sep 14, 2016 | Dec 15, 2018 |