Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| VALUE ENGINEERING STUDY - IOWA | YAEGER ARCHITECTURE INC | $102,065 | US FISH AND WILDLIFE SERVICE | US FISH AND WILDLIFE SERVICE | — | 541330Engineering Services | C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | Apr 24, 2026 | Apr 24, 2026 | Jun 30, 2026 | ||
| A-E DESIGN REPLACE HVAC IN BUILDING 3278 | YAEGER ARCHITECTURE INC | $385,070 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C223ARCHITECT AND ENGINEERING- GENERAL: MECHANICAL SYSTEMS | Jan 5, 2026 | Jan 5, 2026 | Jan 4, 2027 | ||
| ERCIP WATER WELL CONSTRUCTION SERVICES PHASE AE AT BUCKLEY SFB | YAEGER ARCHITECTURE INC | $607,227 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Oct 29, 2025 | Oct 21, 2025 | Oct 11, 2027 | ||
| THIS ACQUISITION IS FOR SUPPORT OF RESILIENT SURVEILLANCE MISSION REDUNDANT ELECTRICAL SUPPLY AT BUCKLEY SFB, CO. | YAEGER ARCHITECTURE INC | $406,783 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Oct 21, 2025 | Oct 22, 2025 | Oct 12, 2027 | ||
| GERRITY FITNESS CENTER (AE RFP) TAFB | YAEGER ARCHITECTURE INC | $600,205 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 30, 2025 | Sep 30, 2025 | May 28, 2026 | ||
| FT. LEAVENWORTH TRAILS AND RECREATION MASTER PLAN | YAEGER ARCHITECTURE INC | $513,186 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Sep 29, 2025 | Sep 30, 2025 | Mar 31, 2027 | ||
| PROVIDE PROFESSIONAL SERVICES REQUIRED FOR AND RELATED TO THE DEVELOPMENT AND COMPLETION OF AFCS EUCOM METRIC FACILITY DESIGN TECHNICAL DOCUMENTS. | YAEGER ARCHITECTURE INC | $1,872,650 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | Sep 17, 2025 | Oct 1, 2025 | Apr 1, 2027 | ||
| BUILDING 392 STUDY TO DETERMINE THE OPTIMAL PARTIAL DEMOLITION OF BUILDING 392 AND PREPARING CONTRACT DOCUMENTS TO ADD A FIRE SUPPRESSION SYSTEM TO B392 USING THE DEMOLITION STUDY RESULTS TO INFORM BASE PLUS OPTIONS FOR THE CONSTRUCTION CONTRACT. | YAEGER ARCHITECTURE INC | $335,253 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | Sep 16, 2025 | Sep 15, 2025 | Sep 15, 2027 | ||
| P12020-AE GBSD CONSOLIDATED OPS COMPLEX, MINOT AFB ND - INFRASTRUCTURE STUDY [513572] | YAEGER ARCHITECTURE INC | $1,302,955 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Aug 18, 2025 | Aug 22, 2025 | Aug 22, 2026 | ||
| THIS REQUIREMENT WILL BE USED TO SATISFY A NEED FOR ARCHITECT-ENGINEER SERVICES FOR A DESIGN FOR BUILDING 706 HVAC. | YAEGER ARCHITECTURE INC | $135,357 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | DE01IT and Telecom - End User: Help Desk; Tier 1-2, Workspace, Print, Output, Productivity Tools (Labor) | Jul 28, 2025 | Aug 4, 2025 | Jan 30, 2026 | ||
| MINIMUM GUARANTEE: TRAINING & KICK-OFF MEETING. COMPLETE AND SUBMIT PROOF OF ANTI-TERRORISM LEVEL 1, IWATCH, & THREAT AWARENESS REPORTING PROGRAM (TARP) TRAININGS, AND E-VERIFY SCREENINGS FOR KEY PERSONNEL, AND PARTICIPATE IN IDIQ KICK-OFF MEETING. | YAEGER ARCHITECTURE INC | $2,500 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | Jul 14, 2025 | Jul 17, 2025 | Aug 18, 2025 | ||
| ARCHITECT-ENGINEERING SERVICES FOR LTUY199004 ADD/ALTER (ADAL) SECURITY FORCES OPERATIONS FACILITY. SEE ATTACHED STATEMENT OF WORK. | YAEGER ARCHITECTURE INC | $521,462 | DEPT OF THE ARMY | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C1JZARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS | May 2, 2025 | May 2, 2025 | Apr 1, 2026 | ||
| NWK SB AE IDIQ MATOC MINIMUM GUARANTEE YAEGER ARCHITECTURE, INC. | YAEGER ARCHITECTURE INC | $2,500 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | R707SUPPORT- MANAGEMENT: CONTRACT/PROCUREMENT/ACQUISITION SUPPORT | Apr 18, 2025 | Apr 18, 2025 | Apr 1, 2030 | ||
| ARCHITECT-ENGINEER (A-E) TASK ORDER UNDER CONTRACT TO PREPARE A DESIGN-BUILD RFP PACKAGE FOR DESIGN OF MARSHALLING AREAS, LOADING DOCKS AND IMPROVED LIGHTING AT CAMP FUNSTON, FORT RILEY. | YAEGER ARCHITECTURE INC | $1,233,259 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C220ARCHITECT AND ENGINEERING- GENERAL: STRUCTURAL ENGINEERING | Apr 10, 2025 | Apr 8, 2025 | Jun 18, 2027 | ||
| A) INCORPORATE STATEMENT OF WORK DATED 19 MARCH 2025 B) INCORPORATE YAEGER ARCHITECTURE PROPOSAL DATED 3 APRIL 2025C) THE PERIOD OF PERFORMANCE IS 108 CALENDAR DAYS BEGINNING 15 APRIL 2025 ////LAST ITEM//// | YAEGER ARCHITECTURE INC | $147,418 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C1JZARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS | Apr 9, 2025 | Apr 15, 2025 | Aug 1, 2025 | ||
| THE A-E IS TO PROVIDE THE PROFESSIONAL SERVICES NEEDED TO PRODUCE TWO 100% DESIGNS FOR REPAIRING AND/OR SHORING UP THE FOUNDATION AND THE CMU WALLS OF BUILDING 412 AND BUILDING 1099, IAW STATEMENT OF WORK DATED, 1 JANUARY 2025. | YAEGER ARCHITECTURE INC | $189,850 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541310Architectural Services | C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | Feb 11, 2025 | Feb 11, 2025 | Oct 16, 2025 | ||
| MINIMUM GUARANTEE | YAEGER ARCHITECTURE INC | $2,500 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C212ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | Feb 5, 2025 | Feb 5, 2025 | Mar 6, 2025 | ||
| MINIMUM GUARANTEE FOR THE INDEFINITE DELIVERY CONTRACT (IDC) FOR ARCHITECT ENGINEERING SERVICES FOR USE WITHIN SOUTHWESTERN DIVISION (SWD), PROJECTS ASSIGNED TO SWD, AND PRIMARILY IN SUPPORT OF TULSA DISTRICT (SWT). | YAEGER ARCHITECTURE INC | $2,500 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Jan 31, 2025 | Jan 31, 2025 | Jan 30, 2030 | ||
| DESIGN BASE OPERATIONS/MOBILITY CENTER AT OFFUTT AFB | YAEGER ARCHITECTURE INC | $4,933,839 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Oct 18, 2024 | Oct 18, 2024 | Sep 29, 2029 | ||
| THIS REQUIREMENT WILL BE USED TO SATISFY A NEED FOR ARCHITECT-ENGINEER SERVICES REQUIRED TO PROVIDE AN ANALYSIS ON A JET FUEL SPILL AND PROVIDE POSSIBLE REMEDIATION SOLUTIONS. | YAEGER ARCHITECTURE INC | $108,621 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C1JZARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS | Sep 18, 2024 | Sep 25, 2024 | Feb 24, 2025 | ||
| THE A-E IS TO PROVIDE THE PROFESSIONAL SERVICES NEEDED TO PRODUCE A 100% DESIGN FOR THE BUILDING 412 COOLING TOWER REPAIRS, IAW SOW 3, DATED 10 SEP 2024. | YAEGER ARCHITECTURE INC | $199,744 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541310Architectural Services | C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | Sep 18, 2024 | Sep 18, 2024 | Jun 27, 2025 | ||
| THE A-E IS TO PROVIDE THE PROFESSIONAL SERVICES NEEDED TO CONDUCT AN ON-SITE PLANNING CHARRETTE AND PREPARE A PROJECT CHARRETTE REPORT (PCR I) TO DETERMINE AND VALIDATE THE PROJECT REQUIREMENTS PER THE ASSOCIATED STATEMENT OF WORK. | YAEGER ARCHITECTURE INC | $211,175 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541310Architectural Services | C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | Aug 22, 2024 | Aug 26, 2024 | Mar 19, 2025 | ||
| CONTRACT YEAR FOUR A-E TASK ORDERS | YAEGER ARCHITECTURE INC | $153,079 | DEPT OF THE ARMY | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C1JZARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS | Aug 22, 2024 | Aug 22, 2024 | Apr 30, 2025 | ||
| CONDUCT A THOROUGH EVALUATION OF THE CONDENSATE RETURN SYSTEM, SPECIFICALLY LINE A, TO DETERMINE THE CAUSE(S) OF THE WATER HAMMER. THE RECOMMENDED COURSE OF ACTION SHALL INCLUDE A NARRATIVE FOR THE PROPOSED SOLUTION AND/OR REDESIGN OF THE SYSTEM. | YAEGER ARCHITECTURE INC | $164,971 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541330Engineering Services | C1JZARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS | Jul 11, 2024 | Oct 1, 2024 | Jun 16, 2025 | ||
| MHC CONSTRUCTION PHASE A-E SERVICES, FE WARREN AFB, WY | YAEGER ARCHITECTURE INC | $3,223,685 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | C219ARCHITECT AND ENGINEERING- GENERAL: OTHER | Jun 4, 2024 | Jun 3, 2024 | Aug 13, 2026 |