IGF::OT::IGF 150 SPACE CENTER LOOP, LEE'S SUMMIT, MO. HVAC STUDY AT THE NATIONAL RECORDS CENTER OF THE U.S. CITIZENSHIP AND IMMIGRATION SERVICES, U.S. DEPARTMENT OF HOMELAND SECURITY.
IGF::OT::IGF FRANK CARLSON FEDERAL BUILDING AND U.S. COURTHOUSE, TOPEKA, KS. EBERT MAYO DESIGN GROUP WORK ORDER 20 IS HEREBY ISSUED FOR A FEASIBILITY STUDY FOR PROSPECTUS PROJECTS. IMMEDIATELY UPON SIGNATURE OF THE CONTRACTING OFFICER, WORK ORDER NUMBER 20 IS HEREBY ISSUED TO PROVIDE NECESSARY PROFESSIONAL AE SERVICES IN ACCORDANCE WITH THE STATEMENT OF WORK AND FEE PROPOSAL DATED 3/26/2015 INCLUDED IN THE FILE.
IGF::OT::IGF 8930 WARD PARKWAY FEDERAL BUILDING, 8930 WARD PARKWAY, KANSAS CITY, MO. THIS ORDER IS HEREBY ISSUED TO COMPLETE ACCESSIBILITY STUDY AT THE 8930 WARD PARKWAY FEDERAL BUILDING.
IGF::OT::IGF EBERT MAYO DESIGN GROUP WORK ORDER #14. A/E WORK ORDER FOR ACCESSIBILITY STUDY AT THE CHARLES WHITTAKER FEDERAL COURTHOUSE IN KANSAS CITY, MO.
IGF::OT::IGF EBERT MAYO DESIGN GROUP WORK ORDER #15. A/E WORK ORDER FOR STUDY ON BANNISTER FLOOD CONTROL; CONFIRMATION OF EXISTING FLOOD PLAIN ELEVATIONS AND FEMA FLOOD MAPPING CATEGORY AND OPTION DEVELOPMENT FOR NEW FLOOD PROTECTION STRUCTURES AND CONSTRUCTION COST TO PROTECT 2306/2312 E. BANNISTER RD., KANSAS CITY, MO.
IGF::OT::IGF EBERT MAYO WORK ORDER NO. 9 -- MEN AND WOMEN'S RESTROOM RENOVATIONS AND HOT WATER BOILER REPLACEMENT PROJECT JOE SKUBITZ SSA BUILDING 801 S. BROADWAY PITTSBURG, KS 66762-5409
IGF::OT::IGF BLDG: KS0092ZZ ACCESSSIBILITY STUDY FRANK CARLSON FEDERAL BLDG AND CTHS 444 SE QUINCY ST TOPEKA, KS 66683 GS-06P-10-GYD-0005/GS-P-06-12-GY-5030 PER THE SCOPE OF WORK ATTACHED DATED 05/14/2012 AND HEREBY INCORPORATED THE EBERT MAYO DESIGN GROUP ARCHITECTS&PLANNING CONSULTANTS WORK ORDER #03 IS HEREBY ISSUED TO PROVIDE NECESSARY DESIGN SERVICES FOR THE FOLLOWING: ACCESSIBILITY STUDY FRANK CARLSON FEDERAL BLDG AND CTHS 444 SE QUINCY ST TOPEKA, KS 66683
IGF::OT::IGF BLDG: MO0127ZZ CATWALK BOLLING FEDERAL BLDG 601 12TH ST KANSAS CITY, MO 64106-2818 GS-06P-10-GYD-0005/GS-P-06-12-GY-5029 PER THE SCOPE OF WORK ATTACHED DATED 05/04/2012 AND HEREBY INCORPORATED THE EBERT MAYO DESIGN GROUP ARCHITECTS&PLANNING CONSULTANTS WORK ORDER #4 IS HEREBY ISSUED TO PROVIDE NECESSARY DESIGN SERVICES FOR THE FOLLOWING: BOLLING CATWALK
PCN: STUDY BLDG: KS0070ZZ ACCESIBILITY STUDY WICHITA USCH 401 NORTH MARKET STREET WICHITA, KS 67202-2089 GS-06P-10-GYD-0005/GS-P-06-11-GY-5062 PER THE SCOPE OF WORK ATTACHED DATED 08/31/2011 AND HEREBY INCORPORATED, THE EBERT MAYO DESIGN GROUP ARCHITECTS&PLANNING CONSULTANTS WORK ORDER #02 IS HEREBY ISSUED TO PROVIDE NECESSARY DESIGN SERVICES FOR THE FOLLOWING: WICHITA USCH 401 NORTH MARKET STREET WICHITA, KS 67202-2089
WORK ORDER #1 PCN: RKS00042 MISC. PARKING STRUCTURE IMPROVEMENTS CARLSON FEDERAL BUILDING&USCH 444 S.E. QUINCY TOPEKA, KS PROVIDE PROFESSIONAL DESIGN SERVICES PER THE SCOPE OF WORK ATTACHED AND HEREBY INCORPORATED.