Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| IGF::OT::IGF REMODEL RESTROOMS BLDG 261 | THE WILSON GROUP INC | $0 | DEPT OF THE ARMY | DEPT OF THE AIR FORCE | — | 236220Commercial and Institutional Building Construction | Y1BZCONSTRUCTION OF OTHER AIRFIELD STRUCTURES | Sep 29, 2017 | Sep 29, 2017 | Apr 12, 2018 | ||
| IGF::OT::IGF RENOVATE BLDG 270 (RENOVATION/REPAIR) | THE WILSON GROUP INC | $0 | DEPT OF THE ARMY | DEPT OF THE AIR FORCE | — | 236220Commercial and Institutional Building Construction | Y1BZCONSTRUCTION OF OTHER AIRFIELD STRUCTURES | Sep 29, 2017 | Sep 29, 2017 | Jun 30, 2018 | ||
| IGF::OT::IGF GSA, UPDATE BASEMENT FINISHES, DENNEY, 100 CENTENNIAL MALL NORTH, LINCOLN, NE 68508. | THE WILSON GROUP INC | $24,852 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Sep 19, 2017 | Sep 18, 2017 | Dec 21, 2017 | ||
| IGF::OT::IGF USDC JURY ROOM REMODEL: ROBERT J DOLE FEDERAL COURTHOUSE, 500 STATE AVE, KANSAS CITY, KS 66101 THE VENDOR SHALL PROVIDE ALL THE LABOR, MATERIAL, AND EQUIPMENT TO DEMO CABINETS, FAUCET, SINK AND REPLACE WITH NEW WALL AND BASE CABINETS, W/SOLID SURFACE SINK WITH FAUCET. REMOVE WALL PAPER, SKIM WALLS, AND PAINT WALLS. INSTALL ELECTRICAL OUTLETS AND RELOCATE TSTATS. REMOVE AND INSTALL NEW LVT FLOORING. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE REVISED STATEMENT OF WORK DATED 03/08/2017. THIS DOCUMENT ALONG WITH THE VENDOR'S PROPOSAL DATED 03/06/2017 ARE HEREBY INCORPORATED BY REFERENCE. JAMES BRADFORD IS DESIGNATED AS THE CONTRACTING OFFICER'S REPRESENTATIVE FOR THIS PROJECT. | THE WILSON GROUP INC | $54,136 | PUBLIC BUILDINGS SERVICE | ADMINISTRATIVE OFFICE OF THE US COURTS | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Sep 14, 2017 | Sep 14, 2017 | Dec 13, 2017 | ||
| IGF::OT::IGF -2312 E. BANNISTER RD, KANSAS CITY, MO CONTRACTOR SHALL REMOVE APPROXIMATELY 32 LINEAL FEET OF CONCRETE CURBING AND APPROXIMATELY 84 SQFT OF CONCRETE FLAT WORK AROUND THE LIGHT POLE. AFTER EXISTING CONCRETE IS REMOVED CONTRACTOR SHALL BACKFILL THE VOIDS WITH GRAVEL, REPLACE THE CURBING AND FORM AN 18 INCH WIDE GUTTER WITH NEW 8 INCH CURBING WITH REINFORCEMENT ON EACH SIDE OF THE GUTTER TO CREATE A PLACE FOR WATER RUNOFF ON THE PARKING LOT TO GO WITHOUT WASHING OUT THE LIGHT POLE FOOTING. THEN RE POUR APPROXIMATELY 84 SQ. FT. OF FLATWORK AROUND THE LIGHT POLE FOOTING. | THE WILSON GROUP INC | $6,456 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Sep 11, 2017 | Sep 12, 2017 | Dec 11, 2017 | ||
| IGF::OT::IGF USDC JAMES CLERKS REMODEL: ROBERT DOLE FEDERAL COURTHOUSE, 500 STATE AVE, KANSAS CITY, KS 66101 THE VENDOR SHALL PROVIDE ALL THE LABOR, MATERIAL, AND EQUIPMENT TO COMPLETE THE FOLLOWING: WORK TO BE PERFORMED IN JUDGE JAMES CLERKS CHAMBER AND CONFERENCE ROOM TO INSTALL COMPLETED NLB (NON LOAD BEARING WALL) WALL IN CONFERENCE ROOM WITH DOOR AND TRANSOM WINDOWS AND DEMO PARTITION WALL, ADJUST CEILING GRID, AND REPLACE CARPET TILES, AND PAINT WALLS IN CLERKS OFFICE. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE STATEMENT OF WORK DATED 08/14/2017 AND ASSOCIATED DRAWINGS. THESE DOCUMENTS ALONG WITH THE VENDORS QUOTE DATED 08/17/2017 ARE HEREBY INCORPORATED BY REFERENCE. JAMES BRADFORD IS DESIGNATED AS THE CONTRACTING OFFICER'S REPRESENTATIVE FOR THIS PROJECT. | THE WILSON GROUP INC | $20,891 | PUBLIC BUILDINGS SERVICE | ADMINISTRATIVE OFFICE OF THE US COURTS | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Sep 8, 2017 | Sep 8, 2017 | Dec 7, 2017 | ||
| IGF::OT::IGF USCG OFFICE SPACE ALTERATION: 444 SE QUINCY AVE, TOPEKA, KS 66683 THE VENDOR SHALL PROVIDE ALL THE LABOR, MATERIAL, AND EQUIPMENT TO PERFORM THE FOLLOWING TASK. WORK INCLUDES ALTERATION/REPAIR TO OFFICE 116 S, ADMIN OFFICE, INFORMATION DIVISION, ROOM 166 N OFFICE BUILD-OUT, AND 3RD FLOOR COAST GUARD OA. WORK ALSO INCLUDE WALL REMOVAL, ERECTING NEW WALLS (GYPSUM BOARD), PAINTING, ELECTRICAL RE-CIRCUIT, PARTIAL FLOORING, AND THE RELOCATING OF DOORS AND FLORESCENT LIGHTS. INSTALL 3 ADA AUTOMATIC DOOR OPENERS WITH KEY CARD ACCESSIBILITY. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE STATEMENT OF WORK DATED 06/06/2017, AND ASSOCIATED DRAWINGS. THESE DOCUMENTS ALONG WITH THE VENDOR QUOTE ARE HEREBY INCORPORATED BY REFERENCE. JAMES BRADFORD IS DESIGNATED AS THE CONTRACTING OFFICER'S REPRESENTATIVE FOR THIS PROJECT. | THE WILSON GROUP INC | $33,831 | PUBLIC BUILDINGS SERVICE | US COAST GUARD | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Sep 6, 2017 | Sep 6, 2017 | Oct 21, 2017 | ||
| IGF::OT::IGF PROVIDE FACILITY MAINTENANCE AT 3 NWS/WFO LOCATIONS. | THE WILSON GROUP INC | $77,424 | NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION | NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION | — | 236220Commercial and Institutional Building Construction | Z1JZMAINTENANCE OF MISCELLANEOUS BUILDINGS | Aug 31, 2017 | Aug 31, 2017 | Sep 17, 2018 | ||
| IGF::OT::IGF PROVIDE FACILITY MAINTENANCE AT 14 NWS/WFO LOCATIONS. | THE WILSON GROUP INC | $145,246 | NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION | NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION | — | 236220Commercial and Institutional Building Construction | Z1JZMAINTENANCE OF MISCELLANEOUS BUILDINGS | Aug 30, 2017 | Aug 30, 2017 | Sep 30, 2018 | ||
| IGF::OT::IGF. WHITTAKER FEDERAL COURTHOUSE 400 E. 9TH S., US COURTS CHAMBERS 6552 REMODEL, KCMO 64106 | THE WILSON GROUP INC | $25,889 | PUBLIC BUILDINGS SERVICE | ADMINISTRATIVE OFFICE OF THE US COURTS | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Aug 29, 2017 | Aug 29, 2017 | Nov 20, 2017 | ||
| IGF::OT::IGF - 2312 E. BANNISTER ROAD, KANSAS CITY, MO. CONTRACTOR SHALL REPAIR THE WALL CRACKS AND PAINT THE REPAIRED AREAS TO BLEND IN WITH THE EXISTING PAINT ON SIX INTERIOR DOORS THROUGHOUT THE GSA AND USDA OFFICE SPACES. | THE WILSON GROUP INC | $4,998 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Aug 28, 2017 | Aug 29, 2017 | Oct 28, 2017 | ||
| IGF::OT::IGF GSA, PAINTING AND SIDEWALK REPAIRS, 111 S 18 PLAZA, OMAHA, NE 68102. | THE WILSON GROUP INC | $49,348 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Aug 22, 2017 | Aug 16, 2017 | Oct 20, 2017 | ||
| CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, DISPOSAL, SUPERVISION, COORDINATION, EQUIPMENT, AND SERVICES NECESSARY TO COMPLETE CONTRACTOR WILL PREP AND PAINT 1ST FLOOR EAST AND WEST HALLWAYS. CONTRACTOR WILL PROVIDE AND INSTALL STAINLESS STEEL CORNER PROTECTORS TO MATCH EXISTING IN HALLWAY. CONTRACTOR WILL PROVIDE AND INSTALL FRP BOARD IN CHILD CARE CRIB AREA TO MATCH EXISTING WALLS. LOCATION: 1ST FLOOR 601 E 12TH ST., KCMO 64106. IGF::OT::IGF | THE WILSON GROUP INC | $10,741 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Aug 4, 2017 | Aug 7, 2017 | Oct 30, 2017 | ||
| IGF::OT::IGF GSA, REPAIR PARKING LOT, PAINT RESTROOMS, AND CARPET SHUTTLE ELEVATOR, AT HRUSKA, 111 S 18 PLAZA, OMAHA, NE 68102. | THE WILSON GROUP INC | $29,146 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Jul 25, 2017 | Jul 21, 2017 | Oct 31, 2017 | ||
| IGF::OT::IGF GSA, INSTALL CARPET, HRUSKA, 111 S 18 PLAZA, OMAHA, NE 68102 | THE WILSON GROUP INC | $23,266 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Jul 21, 2017 | Jul 20, 2017 | Oct 31, 2017 | ||
| IGF::OT::IGF GSA, PAINT OFFICE, HRUSKA, 111 S 18 PLAZA, OMAHA, NE 68102 | THE WILSON GROUP INC | $9,198 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Jul 18, 2017 | Jul 17, 2017 | Sep 30, 2017 | ||
| IGF::OT::IGF - 8930 WARD PARKWAY, KANSAS CITY, MO - REMOVE EXISTING CARPET AND COVE BASE THEN INSTALL NEW CARPET AND COVE BASE ON THE 2ND AND 3RD FLOOR. | THE WILSON GROUP INC | $24,800 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Jul 17, 2017 | Jul 18, 2017 | Sep 16, 2017 | ||
| IGF::OT::IGF -2312 E. BANNISTER ROAD, KANSAS CITY, MO. REMOVE TWO EXISTING CHAIN LINK FENCE GATES, 2 FENCE POSTS AND EXCAVATE THE DIRT FROM INSIDE THE CURBING. INSTALL CONCRETE DRIVEWAY AND SECTIONS OF BLACK CHAIN LINK SWINGING FENCE GATES. | THE WILSON GROUP INC | $15,719 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Jul 13, 2017 | Jul 13, 2017 | Nov 10, 2017 | ||
| IGF::OT::IGF GSA, TRACE ELECTRICAL CIRCUITS AND PAINT COMMON AREAS, ZORINSKY, 1616 CAPITOL AVENUE, OMAHA, NE 68102. | THE WILSON GROUP INC | $46,046 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Jun 30, 2017 | Jun 29, 2017 | Oct 10, 2017 | ||
| IGF::OT::IGF GSA, TRACE ELECTRICAL CIRCUITS, DENNEY, 100 CENTENNIAL MALL NORTH, LINCOLN, NE 68508. | THE WILSON GROUP INC | $24,019 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Jun 29, 2017 | Jun 27, 2017 | Sep 14, 2017 | ||
| IGF::OT::IGF - REFRESH PAINTING THE VISITOR CENTER FOR THE GENERAL SERVICES ADMINISTRATION (GSA), AT 2306 E BANNISTER RD, KANSAS CITY, MO, 64131. | THE WILSON GROUP INC | $4,744 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Jun 26, 2017 | Jun 26, 2017 | Sep 30, 2017 | ||
| IGF::OT::IGF REFINISH GSA CONFERENCE ROOMS PL202&203, FRANK CARLSON FEDERAL COURTHOUSE, 444 SE QUINCY AVE, TOPEKA, KS 66683. THE CONTRACTOR SHALL PROVIDE ALL THE LABOR, MATERIALS, AND EQUIPMENT TO DEMO EXISTING CARPET AND WALL BASE. CARPET, PAINT WALLS AND DOORS. INSTALL NEW WALL BASE. (TSS/ Y0000TSS). ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE STATEMENT OF WORK DATED 05/01/2017. THIS DOCUMENT ALONG WITH THE CONTRACTORS PROPOSAL DATED 05/25/2017 ARE HEREBY INCORPORATED BY REFERENCE. ALLEN SCHERR IS DESIGNATED AS THE CONTRACTING OFFICER'S REPRESENTATIVE FOR THIS PROJECT. | THE WILSON GROUP INC | $10,110 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Jun 20, 2017 | Jun 20, 2017 | Sep 18, 2017 | ||
| IGF::OT::IGF - TEAR OUT AND REPLACE APPROXIMATELY 650 SQUARE FEET OF SIDEWALK AND 40 LINEAL FEET OF 8 INCHES CURBING. LOCATED ON THE SOUTH EAST SIDE OF BUILDING 2306 E. BANNISTER ROAD, KANSAS CITY, MO. | THE WILSON GROUP INC | $24,542 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Jun 8, 2017 | Jun 8, 2017 | Oct 6, 2017 | ||
| IGF::OT::IGF CONTRACTOR SHALL PROVIDE ALL DESIGN, LABOR, MATERIALS, DISPOSAL, SUPERVISION, COORDINATION, EQUIPMENT, AND SERVICES NECESSARY TO COMPLETE THE REQUIREMENTS OF THE GENERAL SERVICE ADMINISTRATION. CONTRACTOR WILL PROVIDE SIDE WALK BARRICADES, WHILE CONSTRUCTION IN UNDERWAY. CONTRACTOR WILL REMOVE DESIGNATED CONCRETE ON THE SOUTH SIDE OF THE COURTHOUSE (SEE DRAWINGS). CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING ALL DEBRIS FROM SITE. CONTRACTOR WILL PROVIDE AND INSTALL REINFORCING IN NEW CONCRETE SIDE WALK. CONTRACTOR WILL FINISH CONCRETE IN SAME PATTERN AS EXISTING. PLACE OF PERFORMANCE GENERAL SERVICE ADMINISTRATION CHARLES EVANS WHITTAKER FEDERAL COURTHOUSE 400 EAST NINTH STREET KANSAS CITY, MO 64106. | THE WILSON GROUP INC | $24,160 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Jun 8, 2017 | Jun 9, 2017 | Aug 31, 2017 | ||
| IGF::OT::IGF - 2306 E. BANNISTER ROAD, KANSAS CITY, MO - PAINTING OF COMMON SPACE HALLWAY WALLS ALONG THE MAIN BUILDING EAST ENTRANCE AND THE THREE CONNECTING HALLWAYS AND ONE SECTION OF HALLWAY BY THE STORAGE LOCKERS ON THE WEST SIDE OF THE BUILDING. | THE WILSON GROUP INC | $24,420 | PUBLIC BUILDINGS SERVICE | PUBLIC BUILDINGS SERVICE | — | 236220Commercial and Institutional Building Construction | Z2AAREPAIR OR ALTERATION OF OFFICE BUILDINGS | Jun 6, 2017 | Jun 7, 2017 | Oct 31, 2017 |