Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| TECHNICAL SERVICES (CIRCUIT BOARD LAYOUT) | ESPACE INC. | $19,320 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541690Other Scientific and Technical Consulting Services | DB01IT AND TELECOM - HIGH PERFORMANCE COMPUTING (HPC) SUPPORT SERVICES (LABOR) | Jan 27, 2025 | Feb 1, 2025 | Sep 30, 2025 | ||
| SBIR PHASE II, PRECISION ION NANO THRUSTER | ESPACE INC. | $849,939 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) | AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | Jul 3, 2024 | Jul 3, 2024 | Jul 2, 2026 | ||
| SBIR PHASE 1 - PRECISION ION NANO THRUSTER | ESPACE INC. | $149,563 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) | AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | Jul 24, 2023 | Aug 3, 2023 | Feb 2, 2024 | ||
| PHASE III | ESPACE INC. | $599,410 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) | AJ14GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; R&D ADMINISTRATIVE EXPENSES | May 17, 2023 | May 17, 2023 | May 15, 2025 | ||
| TECHNICIAN SERVICES (CIRCUIT BOARD LAYOUT) | ESPACE INC. | $6,440 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541690Other Scientific and Technical Consulting Services | 5999MISCELLANEOUS ELECTRICAL AND ELECTRONIC COMPONENTS | Jan 18, 2023 | Jan 18, 2023 | Jan 15, 2024 | ||
| BIMODAL ION-CHEMICAL THRUSTER SYSTEM. PERFORMANCE DEMONSTRATION OF HIGH PAYOFF PROPULSION TECHNOLOGY: ROTATING DETONATION ENGINE AND DUAL MODE IONIC LIQUID | ESPACE INC. | $937,065 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) | AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | Jan 26, 2021 | Jan 26, 2021 | May 4, 2024 | ||
| BIMODAL ION-CHEMICAL THRUSTER SYSTEM | ESPACE INC. | $124,468 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) | AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | Aug 11, 2019 | Aug 19, 2019 | Feb 18, 2020 | ||
| IGF::OT::IGF SBIR PHASE III CONTRACT FOR "PRECISION ELECTROSPRAY THRUSTER ASSEMBLY" | ESPACE INC. | $497,398 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541711 | AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | Mar 26, 2014 | Mar 26, 2014 | Sep 24, 2016 | ||
| IGF::OT::IGF PRECISION ELECTROSPRAY THRUSTER ASSEMBLY (PETA) SBIR PHASE III BASE PERIOD ONLY | ESPACE INC. | $99,791 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541711 | AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | Jun 26, 2013 | Jun 26, 2013 | Dec 26, 2013 | ||
| IGF::OT::IGF OTHER FUNCTION - NEW LOW COST, LOW VOLUME, LOW POWER, RUGGED ELECTROSPRAY THRUSTERS WILL BE IDEAL AS ACTUATORS FOR PRECISION THRUSTING, IF PROVIDED WITH PRECISION HIGH VOLTAGE POWER SUPPLIES. THE SMALL THRUSTERS SHOW MINIMUM THRUSTS OF 1.2 NANONEWTON, AND THRUSTS SCALABLE IN A WIDE RANGE TO HUNDREDS OF MICRONEWTONS, WITH AN ISP OF 3500 SEC. WE PROPOSE TO DEVELOP AND TEST A HIGH-PRECISION HIGH-VOLTAGE POWER SUPPLY OPTIMIZED FOR FINE CONTROL OF THE THRUSTERS, AND DESIGNED TO SUPPORT ACCURATE FORMATION FLYING OF SPACE TELESCOPE ELEMENTS, AND PRECISION ALIGNMENT AND STABILIZATION OF SPACE PLATFORMS. THE HV SUPPLY DESIGN WILL BE DEVELOPED INTO A CUBESAT FORMAT PRECISION ELECTROSPRAY THRUSTER ASSEMBLY INCLUDING THRUSTERS, AND READY FOR FLIGHT TESTS OF THE TECHNOLOGY. AT THE END OF PHASE II PETA UNITS WILL BE PROVIDED AS PROTOFLIGHT AVIONICS TO BE FLOWN, TESTED AND QUALIFIED. | ESPACE INC. | $856,492 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541712 | AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | Apr 30, 2012 | Apr 30, 2012 | Mar 16, 2015 | ||
| NEW LOW COST, LOW VOLUME, LOW POWER, RUGGED ELECTROSPRAY THRUSTERS WILL BE IDEAL AS ACTUATORS FOR PRECISION THRUSTING, IF PROVIDED WITH PRECISION HIGH VOLTAGE POWER SUPPLIES. THE SMALL THRUSTERS SHOW MINIMUM THRUSTS OF 1.2 NANONEWTON, AND THRUSTS SCALABLE IN A WIDE RANGE TO HUNDREDS OF MICRONEWTONS, WITH AN ISP OF 3500 SEC. WE PROPOSE IN PHASE I TO DEVELOP, TEST AND CHARACTERIZE WITH ELECTROSPRAY THRUSTERS A HIGH-PRECISION HIGH-VOLTAGE POWER SUPPLY OPTIMIZED FOR FINE CONTROL OF THE THRUSTERS, AND DESIGNED TO SUPPORT ACCURATE FORMATION FLYING OF SPACE TELESCOPE ELEMENTS, AND PRECISION ALIGNMENT AND STABILIZATION OF SPACE PLATFORMS. THE PHASE I HV SUPPLY DESIGN WILL BE DEVELOPED IN PHASE II INTO A CUBESAT FORMAT PRECISION ELECTROSPRAY THRUSTER ASSEMBLY INCLUDING THRUSTERS, AND READY FOR FLIGHT TESTS. AT THE END OF PHASE II PETA UNITS WILL BE PROVIDED AS PROTOFLIGHT AVIONICS TO BE FLOWN, TESTED AND QUALIFIED. | ESPACE INC. | $99,627 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541712 | AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | Feb 17, 2011 | Feb 18, 2011 | Sep 29, 2011 | ||
| DARPA SBIR PHASE I | ESPACE INC. | $98,734 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541712 | AD92 | Dec 28, 2009 | Dec 28, 2009 | Aug 31, 2010 | ||
| THE PHASE I EFFORT DEMONSTRATED, THROUGH ACTUAL DEVELOPMENT AND TESTS WITH A SPACECRAFT SYSTEM, THE TECHNICAL AND PROGRAMMATIC FEASIBILITY OF DEVELOPING, WITHIN THE SBIR PHASE II PROGRAM, THE PROTOTYPE OF AN INNOVATIVE AND LOW-COST OPEN SYSTEM OF AGILE GROUND STATIONS USING THE NEW COMMERCIAL SOFTWARE DEFINED RADIO (SDR) TECHNOLOGY. THE PROTOTYPE AGILE STATIONS WILL OPERATE IN A WIDE BAND USED BY NASA AND OTHER SCIENCE AND TECHNOLOGY SATELLITES AND WILL BE ABLE TO SWITCH BETWEEN COMMUNICATIONS FREQUENCIES, MODES AND DATA PROTOCOLS, IN REAL TIME, TO SERVICE MULTIPLE SATELLITES. THE STATIONS WILL BE REMOTELY PROGRAMMABLE TO STORE PORTFOLIOS OF SATELLITE APPLICATIONS, AND WILL SWITCH BETWEEN APPLICATIONS ON DEMAND FROM THE LARGELY AUTOMATIZED GROUND STATION MANAGEMENT AND MAINTENANCE CENTER (GSMMC). MULTIPLE STATION SITES WILL PROVIDE A HIGH LEVEL OF BACK-UP CAPABILITY AND LINK OPPORTUNITIES AT UP TO 3.5MBITS/S AND WILL ELIMINATE DOWN-TIMES. THE GSMMC WILL INTERFACE WITH THE DIFFERENT SATELLITE MISSION OPERATION CENTERS, AND OVERSEE THE SCHEDULING AND PROGRAMMING OF THE STATION SYSTEM. THE PROTOTYPE SYSTEM WILL BE IMPLEMENTED ON THE EXISTING HETE-2 NETWORK OF THREE STATIONS, OPENING THAT SYSTEM TO SERVICE MULTIPLE MISSIONS AT VERY LOW COST, WHILE SIGNIFICANTLY ENHANCING ITS CAPABILITIES AND PERFORMANCE. | ESPACE INC. | $590,165 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541712 | AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | Sep 28, 2009 | Sep 28, 2009 | Sep 27, 2011 | ||
| SBIR PHASE III FOR TESS PHASE I SUPPORT STUDIES | ESPACE INC. | $149,066 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541712 | AR34 | Sep 11, 2008 | Sep 11, 2008 | Jun 11, 2009 | ||
| OPEN SYSTEMS OF AGILE GROUND STATIONS | ESPACE INC. | $99,547 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541712 | AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | Jan 25, 2008 | Jan 25, 2008 | Jul 24, 2008 |