Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| HABITABLE WORLDS OBSERVATORY SYSTEM TECHNOLOGY DEMONSTRATIONS AND MISSION ARCHITECTURE STUDIES | NORTHROP GRUMMAN SYSTEMS CORPORATION | $21,241,364 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) | AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | May 11, 2026 | May 11, 2026 | May 10, 2029 | ||
| DESIGN, DEVELOP, TEST, AND PRODUCE GLOBAL VARIANTS OF THE PROTECTED TACTICAL SATELLITE COMMUNICATION SPACE VEHICLES, ASSOCIATED GROUND SYSTEMS AND ANCHOR STATIONS | NORTHROP GRUMMAN SYSTEMS CORPORATION | $7,500,000 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 336414Guided Missile and Space Vehicle Manufacturing | 1555SPACE VEHICLES | Jul 28, 2025 | Jul 28, 2025 | Jul 28, 2040 | ||
| THE AIR FORCE TECHNICAL APPLICATIONS CENTER UTILIZES DATA FROM SPACE-BASED SENSORS IN SUPPORT OF ITS NUCLEAR SURVEILLANCE MISSION. THE SPACE TEST PROGRAM SATELLITE #6 IS A UNIQUE ASSET THAT CONTRIBUTES TO THE SURVEILLANCE MISSION FROM SPACE. | NORTHROP GRUMMAN SYSTEMS CORPORATION | $842,310 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) | R499SUPPORT- PROFESSIONAL: OTHER | Mar 14, 2025 | Apr 1, 2025 | Dec 2, 2025 | ||
| RAPID ON ORBIT SPACE TECHNOLOGY EVALUATION RING (ROOSTER-5) INTEGRATION, TEST, AND OPERATIONS EFFORTS | NORTHROP GRUMMAN SYSTEMS CORPORATION | $73,131,732 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 336414Guided Missile and Space Vehicle Manufacturing | AC25NATIONAL DEFENSE R&D SVCS; ATOMIC ENERGY DEFENSE ACTIVITIES; R&D FACILITIES & MAJ EQUIP | Feb 12, 2025 | Feb 12, 2025 | Jun 30, 2028 | ||
| ADVANCED X-RAY IMAGING SATELLITE (AXIS) PHASE A | NORTHROP GRUMMAN SYSTEMS CORPORATION | $745,840 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) | AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | Feb 4, 2025 | Feb 4, 2025 | Aug 31, 2026 | ||
| HELIOSWARM PROGRAM SUPPORT | NORTHROP GRUMMAN SYSTEMS CORPORATION | $87,235,504 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) | AR13SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; EXPERIMENTAL DEVELOPMENT | Sep 24, 2024 | Oct 1, 2024 | Oct 31, 2026 | ||
| STABLE: SYSTEMS TECHNOLOGIES FOR ARCHITECTURE BASELINE | NORTHROP GRUMMAN SYSTEMS CORPORATION | $3,502,252 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) | AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | Sep 12, 2024 | Sep 15, 2024 | Sep 14, 2026 | ||
| STRATOSPHERE TROPOSPHERE RESPONSE USING INFRARED VERTICALLY-RESOLVED LIGHT EXPLORER (STRIVE) SPACECRAFT AND MISSION OPS PHASE A | NORTHROP GRUMMAN SYSTEMS CORPORATION | $3,993,999 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) | AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | Aug 21, 2024 | Aug 21, 2024 | Aug 18, 2026 | ||
| STUDY MEASUREMENT OF ORBITAL DEBRIS IMPACTS USING SPACECRAFT TELEMETRY | NORTHROP GRUMMAN SYSTEMS CORPORATION | $999,632 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | — | AJ11GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCH | Jul 2, 2024 | Feb 20, 2024 | Jan 31, 2027 | ||
| ATMOSPHERE OBSERVING SYSTEM INCLINED PROPULSIVE EVOLVED EXPENDABLE LAUNCH VEHICLE SECONDARY PAYLOAD ADAPTER SPACECRAFT ACCOMMODATION STUDY DELIVERY ORDERS | NORTHROP GRUMMAN SYSTEMS CORPORATION | $825,000 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 336414Guided Missile and Space Vehicle Manufacturing | 1555SPACE VEHICLES | Sep 15, 2023 | Sep 15, 2023 | Jun 7, 2024 | ||
| ATMOSPHERE OBSERVING SYSTEM INCLINED SPACECRAFT ACCOMMODATION STUDY | NORTHROP GRUMMAN SYSTEMS CORPORATION | $1,175,000 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 336414Guided Missile and Space Vehicle Manufacturing | 1555SPACE VEHICLES | Jun 9, 2023 | Jun 9, 2023 | Feb 16, 2024 | ||
| ATMOSPHERE OBSERVING SYSTEM - POLAR (AOS-P) SPACECRAFT ACCOMMODATION STUDY | NORTHROP GRUMMAN SYSTEMS CORPORATION | $1,800,000 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 336414Guided Missile and Space Vehicle Manufacturing | 1555SPACE VEHICLES | May 5, 2023 | May 5, 2023 | May 6, 2024 | ||
| LANDSAT NEXT (LNEXT) SPACECRAFT STUDY | NORTHROP GRUMMAN SYSTEMS CORPORATION | $1,450,000 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 336414Guided Missile and Space Vehicle Manufacturing | 1555SPACE VEHICLES | Apr 3, 2023 | Apr 3, 2023 | Dec 18, 2023 | ||
| RAPID ON-ORBIT SPACE TECHNOLOGY EVALUATION RING | NORTHROP GRUMMAN SYSTEMS CORPORATION | $86,660,857 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 336414Guided Missile and Space Vehicle Manufacturing | AC24NATIONAL DEFENSE R&D SERVICES; ATOMIC ENERGY DEFENSE ACTIVITIES; R&D ADMINISTRATIVE EXPENSES | Jul 6, 2022 | Jul 6, 2022 | Jul 31, 2027 | ||
| ICE, CLOUD, AND LAND ELEVATION-2 (ICESAT-2) MISSION OPERATIONS CENTER (MOC) SUPPORT CENTER CONTRACT - PROVIDE HIGHLY SPECIALIZED ENGINEERING SERVICES FOR MISSION OPERATIONS SUPPORT TO MEET ICESAT-2 SCIENCE OBJECTIVES. | NORTHROP GRUMMAN SYSTEMS CORPORATION | $30,922,086 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 517919 | AR15SPACE R&D SVCS; SPACE FLIGHT, RESEARCH & SUPPORTING ACTIVITIES; R&D FACILITIES & MAJ EQUIP | Feb 10, 2022 | Feb 14, 2022 | Nov 14, 2026 | ||
| THIS HLS EFFORT FURTHER DEVELOPS SUSTAINING LUNAR LANDER CONCEPT DEVELOPMENT THROUGH DESIGN, TRADE STUDIES AND JOINT WORKING GROUPS AND PERFORM RISK MITIGATION ACTIVITIES TO REDUCE SUSTAINABLE LUNAR LANDER DEVELOPMENT RISKS. | NORTHROP GRUMMAN SYSTEMS CORPORATION | $126,408,519 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) | AR12SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; APPLIED RESEARCH | Sep 27, 2021 | Sep 27, 2021 | Sep 30, 2024 | ||
| NASA GODDARD SPACE FLIGHT CENTER GEOSPACE DYNAMICS CONSTELLATION SPACECRAFT STUDY | NORTHROP GRUMMAN SYSTEMS CORPORATION | $550,000 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 336414Guided Missile and Space Vehicle Manufacturing | 1675SPACE VEHICLE COMPONENTS | Apr 27, 2021 | Apr 27, 2021 | Aug 27, 2021 | ||
| AUXILIARY PROPULSION TRANSPORTATION SYSTEM FOR THE EVOLVED EXPENDABLE LAUNCH VEHICLE SECONDARY PAYLOAD ADAPTER STAR RIDESHARE VEHICLE | NORTHROP GRUMMAN SYSTEMS CORPORATION | $297,373 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 336414Guided Missile and Space Vehicle Manufacturing | AC22NATIONAL DEFENSE R&D SERVICES; ATOMIC ENERGY DEFENSE ACTIVITIES; APPLIED RESEARCH | Mar 31, 2021 | Apr 1, 2021 | Aug 1, 2021 | ||
| MOD P00001 PROVIDES FUNDING FOR CONTRACT PERFORMANCE AND UPDATES CLAUSE B.3 ACCORDINGLY. | NORTHROP GRUMMAN SYSTEMS CORPORATION | $328,641 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) | AR13SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; EXPERIMENTAL DEVELOPMENT | Feb 18, 2021 | Feb 18, 2021 | Mar 31, 2022 | ||
| HELIO SWARM PHASE A SUPPORT | NORTHROP GRUMMAN SYSTEMS CORPORATION | $5,850,260 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541715Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) | AR13SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; EXPERIMENTAL DEVELOPMENT | Jan 5, 2021 | Jan 5, 2021 | Sep 30, 2024 | ||
| SPACECRAFT IMAGE FILE, SPACECRAFT SUMMARY DATA SHEET AND CORE SYSTEMS PERFORMANCE CHARACTERISTICS&SUBSYSTEM DETAILS FOR SETUP OF RAPID IV CONTRACT CATALOG. | NORTHROP GRUMMAN SYSTEMS CORPORATION | $500 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 336414Guided Missile and Space Vehicle Manufacturing | 1555SPACE VEHICLES | Sep 30, 2020 | Sep 30, 2020 | Oct 30, 2020 | ||
| IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS | NORTHROP GRUMMAN SYSTEMS CORPORATION | $2,001,207,555 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541712 | AR21 | Sep 3, 2015 | Sep 3, 2015 | May 31, 2029 | ||
| JOINT POLAR SATELLITE SYSTEM-2 SPACECRAFT. GD-300HP CORE SPACECRAFT INCLUDING ALL ASSOCIATED HARDWARE, SOFTWARE, SOURCE CODE, MAINTENANCE SYSTEM AND DOCUMENTATION FOR THE JPSS-2 SPACECRAFT MISSION. | NORTHROP GRUMMAN SYSTEMS CORPORATION | $606,723,242 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION | — | 336414Guided Missile and Space Vehicle Manufacturing | 1810 | Mar 23, 2015 | Mar 30, 2015 | Apr 30, 2028 | ||
| THIS EFFORT IS FOR WORK PERFORMED DURING PHASE B THROUGH F OF THE TRANSITING EXOPLANET SURVEY SATELLITE (TESS) MISSION. THE SPECIFIC REQUIREMENTS FOR EACH OF THESE PHASES ARE PRESENTED IN INDIVIDUAL SECTIONS BELOW. THE EFFORT ALSO INCLUDES TASKS TO: DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, AND DELIVER THE TESS SPACECRAFT; INTEGRATE, TEST, AND OPERATE THE TESS OBSERVATORY; AND DEVELOP, TEST, OPERATE, AND SUSTAIN THE ASSOCIATED MISSION OPERATIONS CENTER (MOC). THE CONTRACTOR IS RESPONSIBLE FOR THE DEVELOPMENT OF THE SPACECRAFT AND CAMERA ACCOMMODATION STRUCTURE, INCLUDING THE SUNSHADE. THE TESS INSTRUMENT, CONSISTING OF THE CAMERA STRUCTURE ASSEMBLY, DATA HANDLING UNIT AND HARNESS, WILL BE PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INTEGRATION ACTIVITIES BETWEEN THE INSTRUMENT AND THE SPACECRAFT WITH INSTRUMENT PERSONNEL SUPPORT. THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, MATERIALS, FACILITIES AND RESOURCES NECESSARY TO CONDUCT THESE ACTIVITIES. | NORTHROP GRUMMAN SYSTEMS CORPORATION | $102,015,890 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 336414Guided Missile and Space Vehicle Manufacturing | 1810 | May 28, 2014 | Mar 24, 2014 | Jul 31, 2026 |