Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ATTEND MANDATORY VIRTUAL POST AWARD CONFERENCE ON 30 SEPTEMBER 2025 AT 1100 CDT. IN-PERSON KICK-OFF AWARD CONFERENCE TO BE SCHEDULED WITHIN 45 DAYS OF AWARD. THIS SATISFIES THE MINIMUM GUARANTEE. | BERING-WESTON JV, LLC | $3,000 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Sep 23, 2025 | Sep 30, 2025 | Sep 29, 2026 | ||
| THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, EQUIPMENT, AND TRANSPORTATION NECESSARY TO REMOVE UNDERGROUND TANK STORAGE AT THE J3 AND J4 FORMER PUMPHOUSE AREA AT DAVIS-MONTHAN AIR FORCE BASE, ARIZONA. | BERING-WESTON JV, LLC | $4,440,816 | DEPT OF THE AIR FORCE | DEFENSE LOGISTICS AGENCY | — | 237120Oil and Gas Pipeline and Related Structures Construction | Y1MFCONSTRUCTION OF EPG FACILITIES - PETROLEUM | Sep 3, 2025 | Sep 3, 2025 | May 5, 2026 | ||
| ATTEND POST AWARD CONFERENCE TO BE SCHEDULED WITHIN 45 DAYS OF AWARD. THIS SATISFIES THE MINIMUM GUARANTEE. | BERING-WESTON JV, LLC | $3,000 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Jul 9, 2025 | Jul 9, 2025 | Oct 7, 2025 | ||
| HURRICANE HELENE MOBILE TURBIDITY REDUCTION SYSTEM BEE TREE RESERVIOR, ASHEVILLE, NC | BERING-WESTON JV, LLC | $41,041,521 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 221310Water Supply and Irrigation Systems | X1NELEASE/RENTAL OF WATER SUPPLY FACILITIES | Dec 11, 2024 | Nov 16, 2024 | Aug 15, 2025 | ||
| PENTAGON SPD OFFICE SUITE 2D543 AND 2D545 SCIF RENOVATIONS, WASHINGTON, D.C. AND MARKS CENTER | BERING-WESTON JV, LLC | $3,221,998 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Sep 30, 2024 | Sep 30, 2024 | Mar 31, 2026 | ||
| TRI-SERVICE RESEARCH LABORATORY (TSRL) RENOVATIONS BUILDING 3260 | BERING-WESTON JV, LLC | $3,539,433 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Sep 29, 2024 | Sep 30, 2024 | Nov 6, 2025 | ||
| (EVCS) AT BLDG. 332 AT LETTERKENNY ARMY DEPOT (LEAD) AND BLDG. S3315 AT LETTERKENNY MUNITIONS CENTER (LEMC). | BERING-WESTON JV, LLC | $2,107,537 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 236220Commercial and Institutional Building Construction | Y1JZCONSTRUCTION OF MISCELLANEOUS BUILDINGS | Sep 29, 2024 | Sep 28, 2024 | Mar 31, 2026 | ||
| REPAIR BUILDING 500, FORT SHAFTER, OAHU, HAWAII | BERING-WESTON JV, LLC | $79,476,650 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 236220Commercial and Institutional Building Construction | Y1AACONSTRUCTION OF OFFICE BUILDINGS | Sep 20, 2024 | Sep 30, 2024 | Jun 8, 2028 | ||
| THIS IS A NEW CONSTRUCTION REQUIREMENT TO REMOVE AND DISPOSE OF APPROXIMATELY 13,500 CUBIC YARDS (CY) OF SEDIMENT, TEMPORARY SEDIMENT STOCKPILE, AND A TWO-ACRE HIGH-DENSITY POLYETHYLENE (HDPE) POND LINER TO CLASS D LANDFILL FACILITY, OFF BASE. | BERING-WESTON JV, LLC | $4,499,000 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 562211Hazardous Waste Treatment and Disposal | F108ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATION | Jul 31, 2024 | Aug 1, 2024 | Jan 31, 2025 |