Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| STTR PHASE II RESEARCH AND DEVELOPMENT | MP TECHNOLOGIES, LLC | $749,980 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541712 | AC62 | Feb 19, 2015 | Feb 19, 2015 | Apr 18, 2017 | ||
| IGF::OT::IGF SBIR PHASE I TOPIC N142-093 "HIGH POWER MID-INFRARED QUANTUM CASCADED LASER ARRAY WITH CONTINUOUS-WAVE OUTPUT POWER EXCEEDING 100W" | MP TECHNOLOGIES, LLC | $149,045 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541712 | AC51 | Sep 30, 2014 | Sep 30, 2014 | Sep 30, 2015 | ||
| IGF::OT::IGF HIGH PERFORMANCE LWIR DETECTORS ARE HIGHLY NEEDED. IN ORDER TO IMAGE FROM LONG DISTANCE, IT IS IMPORTANT THAT IMAGERS HAVE HIGH SENSITIVITY, HIGH RESOLUTION, AND VERY LOW DARK CURRENTS. THIS LEADS TO TECHNICAL GOALS OF HAVING LOW NOISE, LOW DARK CURRENT IN SMALL SIZE PIXELS IN LARGE ARRAYS. WHILE SATURATED PERFORMANCE LEVELS OF TRADITIONAL SYSTEMS BASED ON BULK SEMICONDUCTORS HAVE NOT QUITE MET THE REQUIREMENT OF APPLICATIONS, IT IS EXPECTED THAT NOVEL QUANTUM SYSTEMS WILL BRING NEW DEVELOPMENT STAGE FOR INFRARED IMAGERS. IN RECENT YEARS, TYPE-II INAS/GASB SUPERLATTICE (T2SL) HAS EXPERIENCED SIGNIFICANT DEVELOPMENT, FROM THEORETICAL MODELING, MATERIAL GROWTH TO DEVICE PROCESSING AND PACKAGING. PERFORMANCE OF LWIR DETECTOR BASED ON T2SL HAS BECOME COMPARABLE, EVEN BETTER THAN THAT OF HGCDTE. HOWEVER, LWIR T2SL DEVICES HAVE BEEN SHOWN TO BE LIMITED BY SURFACE LEAKAGE, ESPECIALLY AT LOWER OPERATING TEMPERATURE. THIS PROPOSED EFFORT WILL INVESTIGATE GATING OF TYPE-II PHOTODIODES AS A MEANS TO SUPPRESS THIS BOTTLE NECK OF T2SL TECHNOLOGY. THE ULTIMATE GOAL OF THIS PROJECT IS TO DEVELOP AN EFFECTIVE METHOD TO COMPLETELY SUPPRESS THE SURFACE LEAKAGE CURRENT IN LWIR TYPE-II SUPERLATTICE PHOTODIODES THAT IS COMPATIBLE WITH THE DEVELOPMENT OF HIGH PERFORMANCE GATED FPAS IN PHASE II. | MP TECHNOLOGIES, LLC | $749,945 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541712 | AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | Apr 23, 2014 | Apr 23, 2014 | Jun 22, 2017 | ||
| IGF::OT::IGF PH I RESEARCH&DEVELOPMENT - "DESIGN AND FABRICATION OF STRAIN-BALANCED NBN DUAL-BAND LWIR/LWIR PHOTODETECTORS, MINI-ARRAYS, AND FOCAL PLANE ARRAYS BASED ON TYPE-II SUPERLATTICES" | MP TECHNOLOGIES, LLC | $124,879 | MISSILE DEFENSE AGENCY (MDA) | MISSILE DEFENSE AGENCY (MDA) | — | 541712 | AC22NATIONAL DEFENSE R&D SERVICES; ATOMIC ENERGY DEFENSE ACTIVITIES; APPLIED RESEARCH | Dec 19, 2013 | Dec 20, 2013 | Jul 19, 2014 | ||
| SBIR PHASE II-TOPIC N121-032 MP TECHNOLOGIES, LLC. | MP TECHNOLOGIES, LLC | $753,605 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541712 | AC52 | Sep 19, 2013 | Sep 19, 2013 | Feb 29, 2016 | ||
| QUANTUM CASCADE LASER WAFERS | MP TECHNOLOGIES, LLC | $0 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 334413Semiconductor and Related Device Manufacturing | 6640LABORATORY EQUIPMENT AND SUPPLIES | Sep 16, 2013 | Sep 13, 2013 | Nov 20, 2013 | ||
| STTR PHASE I | MP TECHNOLOGIES, LLC | $149,794 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541712 | AC61 | Aug 13, 2013 | Aug 15, 2013 | Jan 4, 2015 | ||
| IGF::OT::IGF THIS PROPOSAL DESCRIBES DEVELOPMENT OF A NEW TYPE OF QUANTUM-CASCADE LASER FOR USE AS A LOCAL OSCILLATOR AT FREQUENCIES ABOVE 2 THZ. THE THZ SOURCE DESCRIBED IS A SINGLE CHIP SOLUTION THAT OPERATES AT ROOM TEMPERATURE. IN ADDITION, A MECHANISM FOR WIDE TUNING (2-4.7 THZ) IS DESCRIBED THAT REQUIRES NO MOVING PARTS. | MP TECHNOLOGIES, LLC | $124,771 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541712 | AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | May 23, 2013 | May 23, 2013 | Nov 23, 2013 | ||
| IGF::OT::IGF HIGH PERFORMANCE LWIR DETECTORS ARE HIGHLY NEEDED. IN ORDER TO IMAGE FROM LONG DISTANCE, IT IS IMPORTANT THAT IMAGERS HAVE HIGH SENSITIVITY, HIGH RESOLUTION, AND VERY LOW DARK CURRENTS. THIS LEADS TO TECHNICAL GOALS OF HAVING LOW NOISE, LOW DARK CURRENT IN SMALL SIZE PIXELS IN LARGE ARRAYS. WHILE SATURATED PERFORMANCE LEVELS OF TRADITIONAL SYSTEMS BASED ON BULK SEMICONDUCTORS HAVE NOT QUITE MET THE REQUIREMENT OF APPLICATIONS, IT IS EXPECTED THAT NOVEL QUANTUM SYSTEMS WILL BRING NEW DEVELOPMENT STAGE FOR INFRARED IMAGERS. IN RECENT YEARS, TYPE-II INAS/GASB SUPERLATTICE (T2SL) HAS EXPERIENCED SIGNIFICANT DEVELOPMENT, FROM THEORETICAL MODELING, MATERIAL GROWTH TO DEVICE PROCESSING AND PACKAGING. PERFORMANCE OF LWIR DETECTOR BASED ON T2SL HAS BECOME COMPARABLE, EVEN BETTER THAN THAT OF HGCDTE. HOWEVER, LWIR T2SL DEVICES HAVE BEEN SHOWN TO BE LIMITED BY SURFACE LEAKAGE, ESPECIALLY AT LOWER OPERATING TEMPERATURE. THIS PROPOSED EFFORT WILL INVESTIGATE GATING OF TYPE-II PHOTODIODES AS A MEANS TO SUPPRESS THIS BOTTLE NECK OF T2SL TECHNOLOGY. THE ULTIMATE GOAL OF THIS PROJECT IS TO DEVELOP AN EFFECTIVE METHOD TO COMPLETELY SUPPRESS THE SURFACE LEAKAGE CURRENT IN LWIR TYPE-II SUPERLATTICE PHOTODIODES THAT IS COMPATIBLE WITH THE DEVELOPMENT OF HIGH PERFORMANCE GATED FPAS IN PHASE II. | MP TECHNOLOGIES, LLC | $124,902 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541712 | AR11SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; BASIC RESEARCH | May 23, 2013 | May 23, 2013 | Nov 23, 2013 | ||
| SBIR PHASE II RESEARCH&DEV-SURFACE LEAKAGE SUPPRESSION VIA GAITING IN LWIR SINGLE- AND MULTI-COLOR TYPE-II SUPERLATTICE PHOTODETECTORS IGF::OT::IGF | MP TECHNOLOGIES, LLC | $997,853 | MISSILE DEFENSE AGENCY (MDA) | MISSILE DEFENSE AGENCY (MDA) | — | 541712 | AC22NATIONAL DEFENSE R&D SERVICES; ATOMIC ENERGY DEFENSE ACTIVITIES; APPLIED RESEARCH | May 14, 2013 | May 14, 2013 | Nov 16, 2015 | ||
| TOPIC N111-029 AWD | MP TECHNOLOGIES, LLC | $749,920 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541712 | AC62 | Oct 9, 2012 | Oct 9, 2012 | Oct 9, 2014 | ||
| IGF::OT::IGF SBIR/STTR PHASE II RESEARCH&DEV. | MP TECHNOLOGIES, LLC | $996,051 | DEFENSE CONTRACT MANAGEMENT AGENCY (DCMA) | MISSILE DEFENSE AGENCY (MDA) | — | 541712 | AC21NATIONAL DEFENSE R&D SERVICES; ATOMIC ENERGY DEFENSE ACTIVITIES; BASIC RESEARCH | Sep 17, 2012 | Sep 17, 2012 | Sep 15, 2014 | ||
| SBIR I TOPIC N121-032 TITLED "LOW-COST, ROBUST, MONOLITHIC SEMICONDUCTOR MID-INFRARED LASER WITH VERY WIDE TUNABILITY". | MP TECHNOLOGIES, LLC | $149,783 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541712 | AC51 | May 29, 2012 | May 29, 2012 | Sep 17, 2013 | ||
| QUANTUM CASCADE LASER WAFERS | MP TECHNOLOGIES, LLC | $160,000 | DEPT OF THE AIR FORCE | DEPT OF THE AIR FORCE | — | 541712 | AA34 | May 17, 2012 | May 17, 2012 | Jun 29, 2012 | ||
| PH I RESEARCH&DEVELOPMENT | MP TECHNOLOGIES, LLC | $149,866 | MISSILE DEFENSE AGENCY (MDA) | MISSILE DEFENSE AGENCY (MDA) | — | 541712 | AC21NATIONAL DEFENSE R&D SERVICES; ATOMIC ENERGY DEFENSE ACTIVITIES; BASIC RESEARCH | Jan 31, 2012 | Feb 1, 2012 | Jun 6, 2013 | ||
| RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY) | MP TECHNOLOGIES, LLC | $1,409,398 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541712 | AD92 | Jan 9, 2012 | Jan 9, 2012 | Jul 9, 2015 | ||
| SBIR PHASE II RESEARCH AND DEVELOPMENT | MP TECHNOLOGIES, LLC | $999,631 | MISSILE DEFENSE AGENCY (MDA) | MISSILE DEFENSE AGENCY (MDA) | — | 541712 | AC21NATIONAL DEFENSE R&D SERVICES; ATOMIC ENERGY DEFENSE ACTIVITIES; BASIC RESEARCH | Nov 22, 2011 | Nov 22, 2011 | May 21, 2014 | ||
| SBIR PHASE I BRIDGE AND PHASE II AWARD | MP TECHNOLOGIES, LLC | $633,106 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541712 | AD93 | Jul 27, 2011 | Jul 27, 2011 | May 27, 2014 | ||
| PH I RESEARCH&DEVELOPMENT | MP TECHNOLOGIES, LLC | $149,657 | MISSILE DEFENSE AGENCY (MDA) | MISSILE DEFENSE AGENCY (MDA) | — | 541712 | AC21NATIONAL DEFENSE R&D SERVICES; ATOMIC ENERGY DEFENSE ACTIVITIES; BASIC RESEARCH | Jun 29, 2011 | Jun 20, 2011 | Nov 24, 2011 | ||
| PH I RESEARCH&DEVELOPMENT | MP TECHNOLOGIES, LLC | $149,818 | MISSILE DEFENSE AGENCY (MDA) | MISSILE DEFENSE AGENCY (MDA) | — | 541712 | AC21NATIONAL DEFENSE R&D SERVICES; ATOMIC ENERGY DEFENSE ACTIVITIES; BASIC RESEARCH | Jun 21, 2011 | Jun 20, 2011 | Oct 15, 2012 | ||
| SBIR PHASE II FOR MWIR FPA CAMERA BASED ON TYPE II SUPERLATTICES. | MP TECHNOLOGIES, LLC | $750,795 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541712 | AD91 | May 12, 2011 | May 12, 2011 | Dec 31, 2013 | ||
| SBIR PHASE I TOPIC N111-029 | MP TECHNOLOGIES, LLC | $149,369 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541712 | AC61 | May 5, 2011 | May 5, 2011 | Dec 19, 2012 | ||
| RESEARCH AND DEVELOPMENT TOPIC N06-014 | MP TECHNOLOGIES, LLC | $749,579 | DEPT OF THE NAVY | DEPT OF THE NAVY | — | 541712 | AC62 | Sep 22, 2010 | Sep 22, 2010 | Sep 22, 2012 | ||
| PH I RESEARCH & DEVELOPMENT | MP TECHNOLOGIES, LLC | $99,804 | MISSILE DEFENSE AGENCY (MDA) | MISSILE DEFENSE AGENCY (MDA) | — | 541712 | AC21NATIONAL DEFENSE R&D SERVICES; ATOMIC ENERGY DEFENSE ACTIVITIES; BASIC RESEARCH | Apr 30, 2010 | May 3, 2010 | Nov 2, 2010 | ||
| PERFORMANCE OF WORK IN ACCORDANCE WITH | MP TECHNOLOGIES, LLC | $749,759 | DEPT OF THE ARMY | DEPT OF THE ARMY | — | 541330Engineering Services | AD22 | Apr 6, 2010 | Apr 6, 2010 | Apr 5, 2012 |