Analyze awards, watch incumbents and competitors, track new transactions or changes, and use award history to shape recompete and capture strategy.
Award ID | Description | Recipient | Total Value | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | End Date | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ROMAN SPACE TELESCOPE PROPELLANT TANKS | ATK SPACE SYSTEMS LLC | $2,904,574 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 336419Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing | 1675SPACE VEHICLE COMPONENTS | Mar 23, 2021 | Mar 23, 2021 | Oct 15, 2023 | ||
| THIS PROCUREMENT IS FOR A SPACE FLIGHT PROPELLANT TANK FOR THE PLANKTON, AEROSOL, CLOUD, OCEAN ECOSYSTEM (PACE) SPACECRAFT. THIS CONTRACT INCLUDES THE FABRICATING, TEST, INSPECT, AND DELIVER OF ONE (1) DIAPHRAGM PROPELLANT TANK, UTILIZE AN EXISTING PROPELLANT TANK SIMULATOR TO PERFORM DIAPHRAGM AND SLOSH TESTING, AND PERFORM PROPELLANT TANK VIBRATION TESTING. THE CONTRACTOR WILL ALSO PROVIDE GSFC NO-COST USE OF THEIR PROPELLANT TANK SIMULATOR FOR SUPPORTING PROPELLANT TANK CLOSE OUT WELDING. THIS SIMULATOR WILL BE SHIPPED TO GSFC UPON COMPLETION OF SLOSH TESTING. PACE IS COMPRISED OF THREE INSTRUMENTS, AN OCEAN COLOR INSTRUMENT (OCI) AND TWO POLARIMETERS (HARP2 AND SPEXONE). THE OCI IS THE PRIMARY INSTRUMENT ON THE OBSERVATORY AND IS BEING DEVELOPED AT GSFC. THE OCI IS A HYPER-SPECTRAL SCANNING (HSS) RADIOMETER DESIGNED TO MEASURE SPECTRAL RADIANCES FROM THE ULTRAVIOLET TO SHORTWAVE INFRARED (SWIR) TO ENABLE ADVANCED OCEAN COLOR AND HERITAGE CLOUD AND AEROSOL PARTICLE SCIENCE. THE POLARIMETERS ARE SECONDARY INSTRUMENTS ON THE PACE OBSERVATORY, DEVELOPED OUTSIDE OF GSFC. BOTH POLARIMETERS ARE MULTI-BAND, MULTI-ANGLE POLARIMETERS PLANNED TO MEASURE SPECTRAL POLARIZED AND UNPOLARIZED RADIANCES TO ENABLE ADVANCED CLOUD AND AEROSOL PARTICLE SCIENCE, AS WELL AS IMPROVED ATMOSPHERIC CORRECTION FOR OCEAN COLOR ACTIVITIES. THE PACE MISSION REQUIRES AN INTEGRATED PROPULSION SYSTEM. THE PACE PROPULSION SUBSYSTEM CONSISTS OF THE COMPONENTS REQUIRED TO CONTAIN, CONTROL, MONITOR, AND UTILIZE HYDRAZINE PROPELLANT TO ACCOMPLISH ORBIT MANEUVERING AND MOMENTUM MANAGEMENT REQUIREMENTS. THE PROPULSION SUBSYSTEM INCLUDES A PROPELLANT TANK, PROPELLANT FILTER, PRESSURE TRANSDUCERS, SURGE SUPPRESSION DEVICES, LATCHING ISOLATION VALVES, FILL AND DRAIN VALVES, THRUSTERS, AND INTERCONNECTING TUBING. THE PROPULSION SUBSYSTEM ALSO INCLUDES ELECTRICAL HARDWARE CONNECTING COMPONENTS TO AVIONICS AND TEST CONNECTORS, AS WELL AS HEATERS, THERMOSTATS, AND SENSORS ON THE PROPELLANT LINES AND COMPONENTS. THE SYSTEM IS AN ALL WELDED SYSTEM USING STAINLESS STEEL TUBING; ALL WELDS ARE RADIOGRAPHICALLY INSPECTED PRIOR TO THE SYSTEM PROOF PRESSURE TEST AND CHECKED FOR LEAKAGE AFTER THE SYSTEM PROOF PRESSURE TEST. THE PROPULSION SUBSYSTEM IS A MONOPROPELLANT HYDRAZINE SYSTEM USING UNREGULATED (BLOWDOWN) GASEOUS HELIUM PRESSURIZATION | ATK SPACE SYSTEMS LLC | $1,711,241 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 336415Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing | AC24NATIONAL DEFENSE R&D SERVICES; ATOMIC ENERGY DEFENSE ACTIVITIES; R&D ADMINISTRATIVE EXPENSES | Oct 30, 2018 | Oct 30, 2018 | May 31, 2021 | ||
| IGF::OT::IGF SLOSH TESTING AT ATK/PSI/SWRI IN SUPPORT THE GREEN PROPELLANT INFUSION MISSION (GPIM) PROPELLANT TANK VERIFICATION ACTIVITIES. THIS DEVELOPMENT INCLUDES, BUT IS NOT LIMITED TO, TESTING THE SLOSH PROPERTIES OF A SIMULATOR TANK WITH PROPELLANT AND WATER ON A TEST STAND. SUPPORT INCLUDES FABRICATION AND ASSEMBLY OF TEST HARDWARE, INCLUDING ELECTRICAL, FLUID, GAS, AND MECHANICAL INTERFACES; CONDUCTING TESTS; ANALYSIS OF THE RESULTS, AND THE PREPARATION OF A REPORT. | ATK SPACE SYSTEMS LLC | $149,785 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 336415Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing | AC24NATIONAL DEFENSE R&D SERVICES; ATOMIC ENERGY DEFENSE ACTIVITIES; R&D ADMINISTRATIVE EXPENSES | Sep 29, 2014 | Sep 29, 2014 | Apr 29, 2015 | ||
| LUNAR ATMOSPHERE DUST EVIRONMENT EXPLORER (LADEE) PROPELLENT TANK SLOSH ANALYSIS PER THE ATTACHED SOW | ATK SPACE SYSTEMS LLC | $28,446 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 336415Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing | B539SPECIAL STUDIES/ANALYSIS- AERONAUTICAL/SPACE | Feb 8, 2012 | Feb 8, 2012 | Mar 8, 2012 | ||
| LUNAR ATMOSPHERE DUST EVIRONMENT EXPLORER (LADEE) PROPELLENT TANK SLOSH ANALYSIS PER THE ATTACHED SOW | ATK SPACE SYSTEMS LLC | $24,000 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 336415Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing | B539SPECIAL STUDIES/ANALYSIS- AERONAUTICAL/SPACE | Sep 29, 2010 | Sep 29, 2010 | Nov 30, 2010 | ||
| THIS CONTRACT IS FOR THE ELECTRICAL, MECHANICAL, ENVIRONMENTAL, AND VERIFICATION TESTING REQUIREMENTS FOR A SPACE-QUALIFIED PROPULSION SUBSYSTEM PROPELLANT TANK FOR A GODDARD SPACE FLIGHT CENTER (GSFC) PAYLOAD, THE MAGNETOSPHERIC MULTISCALE (MMS) MISSION. | ATK SPACE SYSTEMS LLC | $8,047,965 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 336415Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing | 1820 | May 4, 2010 | May 4, 2010 | Aug 31, 2012 | ||
| MMS PROJECT PMD STUDY TASK | ATK SPACE SYSTEMS LLC | $251,673 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 336415Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing | 1820 | Jun 23, 2009 | Jun 23, 2009 | Dec 22, 2009 | ||
| LRO PROPELLANT MANAGEMENT DEVICE (PMD) AND NUTATION STUDY. | ATK SPACE SYSTEMS LLC | $99,000 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | — | 336415Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing | AZ11 | Aug 8, 2005 | Aug 8, 2005 | Dec 31, 2005 | ||
| NEAR TERM PROCURMENT-PROPELLANT TANKS | ATK SPACE SYSTEMS LLC | $1,764,438 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | — | 336415Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing | AR34 | Sep 17, 2004 | Sep 17, 2004 | Jun 1, 2006 | ||
| — | ATK SPACE SYSTEMS LLC | $0 | DEPT OF THE NAVY | — | — | — | AR61 | Feb 26, 1997 | Feb 26, 1997 | — | ||
| — | ATK SPACE SYSTEMS LLC | $0 | DEPT OF THE NAVY | — | — | — | AR61 | Dec 23, 1996 | Dec 23, 1996 | — |