INSTALL ROOF TOP ANTENNAS, MOUNTS, RUN POWER AND ELECTRIC CABLING ON THE GERMANTOWN OFFICE COMPLEX PER APPROVED SCOPE OF WORK (SOW) AND DRAWING # 3199 FOR THE FIRM-FIXED PRICE OF $24,780.89
THIS PROJECT IS TO DESIGN AND REPLACE AUTOMATIC DOOR CLOSURES FOR FOUR (4) PAIRS OF EXTERIOR DOORS AT THE EPA PASSPORT EXHIBIT SPACE AND POST OFFICE (DC0028ZZ).
47PM0125C0016 - ANNUAL STEAM PLANT REPAIR FY25 - DESIGN-BID-BUILD PROJECT TO INSTALL/REPAIR EQUIPMENT AT THE STEAM PLANT, PROVIDE OPTIMUM EFFICIENCY, AND EXTEND USEFUL SERVICE LIFE OF EQUIPMENT. LOCATION: 325 13TH STREET SW, WASHINGTON, DC 20407.
REQUISITION 25MA000506 WAS ISSUED TO CREATE A DELIVERY ORDER UNDER IDIQ 89303024DMA000036 TO INSTALL VTC WITH WALL SUPPORT IN THE 7B-240 FOR THE FIRM-FIXED PRICE OF $3,299.35. THE PERIOD OF PERFORMANCE IS 06/24/2025 TO 10/31/2025.
REQUISITION 25MA000453 WAS ISSUED TO CREATE A DELIVERY ORDER UNDER IDIQ 89303024DMA000036 TO DEMO CONCRETE ENCLOSURE, REMOVE AND REPLACE BROKEN CONDUIT PIPE ON THE 12TH STREET RAMP FOR THE FIRM-FIXED PRICE OF $23,521.23. THE PERIOD OF PERFORMANCE I
REQUISITION 25MA000144 WAS ISSUED TO CREATE A DELIVERY ORDER UNDER IDIQ 89303024DMA000036 TO EXPAND TECH CAFE TO 450 SF AND RECONFIGURE CONFERENCE ROOM AND OFFICE TO ACCOMMODATE CHANGE FOR THE FIRM-FIXED PRICE OF $78,257.89. THE PERIOD OF PERFORMAN
REQUISITION SUBMITTED FOR CONSTRUCTION ALTERATION SERVICES TO RENOVATE SUITE S4 7A-097 PER APPROVED SCOPE OF WORK AND SUPPORTING DRAWINGS S4 7A-097 SOW CREATE A SUITE FOR THE WH LIAISON AND TO RELOCATE THE S4 CURRENT CONFERENCE ROOM NEXT TO THE
REQUISITION 25MA000182 WAS ISSUED TO RENOVATE SUITE GA-293 FOR THE FIRM-FIXED PRICE OF $17,734.51. THE PERIOD OF PERFORMANCE IS 01/16/2025 TO 06/15/2025.
REQUISITION 25MA000043 WAS ISSUED TO CREATE A DELIVERY ORDER UNDER IDIQ 89303024DMA000036 FOR THE ALTERATION PROJECT IN GL-073 AND GM-182 FOR THE FIRM FIXED PRICE OF $41,529.37. THE PERIOD OF PERFORMANCE IS 11/20/2024 TO 12/31/2024.
REQUISITION 24MA000821 WAS ISSUED TO CREATE A DELIVERY ORDER UNDER IDIQ 89303022DMA000026 FOR MOLD REMEDIATION WITHIN SUITE BH-061 OF THE FORRESTAL SOUTH BUILDING FOR THE FIRM-FIXED PRICE AMOUNT OF $69,866.01. THE PERIOD OF PERFORMANCE IS 09/27
REQUISITION 24MA000806 WAS ISSUED TO DESIGN AND BUILD APPROVED RENOVATION/CHANGES TO THE FORRESTAL MAIN GARAGE LOBBY AREA FOR THE FIRM FIXED PRICE OF $721,936.99 AND A BOND AMOUNT OF $21,658.10 FOR A TOTAL AMOUNT OF $743,595.09. THE PERIOD OF PERFO
REQUISITION 24MA000806 WAS ISSUED TO RENOVATE GL-073 AND GM-182 FOR THE FIRM FIXED PRICE OF $219,030.61 AND A BOND AMOUNT OF $6,570.91 FOR A TOTAL AMOUNT OF $225,601.52. THE PERIOD OF PERFORMANCE IS 09/25/2024 TO 12/31/2025.