Track IDIQs, BPAs, and ordering channels, watch vehicle activity for new transactions, and identify where future task-order pursuits may flow.
Reference IDV | Awardee | Description | Vehicle Type | Ceiling | Awarding Agency | Funding Agency | Set Aside | NAICS | PSC | Award Date | Start Date | Last Date to Order | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| GEOSYNTEC CONSULTANTS, INC. | ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) UNRESTRICTED MULTIPLE AGENCY CONTRACT (MAC) | IDC | $999,999,999,999 | FEDERAL ACQUISITION SERVICE | FEDERAL ACQUISITION SERVICE | — | 541690Other Scientific and Technical Consulting Services | R499SUPPORT- PROFESSIONAL: OTHER | Apr 15, 2025 | Apr 15, 2025 | — | ||
| GEOSYNTEC CONSULTANTS, INC. | EO14042 THIS CONTRACT INCLUDES THE FEDERAL ACQUISITION REGULATION (FAR) CLAUSE 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS - FEDERAL SUPPLY SCHEDULE CONTRACT | FSS | $6,000,000 | FEDERAL ACQUISITION SERVICE | FEDERAL ACQUISITION SERVICE | — | 541620Environmental Consulting Services | F999OTHER ENVIRONMENTAL SERVICES | Dec 15, 2021 | Dec 20, 2021 | Dec 19, 2026 | ||
| GEOSYNTEC CONSULTANTS, INC. | IGF::OT::IGF IN SUPPORT OF THE NASA/KSC ENVIRONMENTAL ASSURANCE BRANCH THE FIRM SHALL PROVIDE THE NECESSARY RESOURCES TO DEVELOP AND IMPLEMENT CONTAMINATION ASSESSMENT AND REMEDIATION REQUIREMENTS FOR RESOURCE CONSERVATION AND RECOVERY ACT (RCRA) SITES AND PETROLEUM CONTAMINATION FOR NASA ON KSC AND CCAFS. KSC AND CCAFS ARE REGULATED UNDER THE RCRA PERMIT WHICH INCLUDES HAZARDOUS AND SOLID WASTE AMENDMENTS (HSWA) CORRECTIVE ACTION REQUIREMENTS. AS SUCH, HSWA CORRECTIVE ACTIONS REQUIREMENTS ARE MANAGED UNDER A COMPLIANCE SCHEDULE KNOWN AS A CORRECTIVE ACTION MANAGEMENT PLAN (CAMP). THE CAMP CONTAINS REGULATORY COMPLIANCE DATES THAT INCLUDE STIPULATED PENALTIES FOR FAILURE TO MEET REQUIRED DATES FOR SUBMITTAL OF RCRA CORRECTIVE ACTION DOCUMENTS. REGULATORY DOCUMENTS INCLUDE SOLID WASTE MANAGEMENT UNIT (SWMU) ASSESSMENT REPORTS, CONFIRMATORY SAMPLING WORK PLANS, CONFIRMATORY SAMPLING REPORTS, RCRA FACILITY INVESTIGATION WORK PLANS, RCRA FACILITY INVESTIGATIONS, CORRECTIVE MEASURES STUDY WORK PLANS, CORRECTIVE MEASURES STUDIES, STATEMENTS OF BASIS, CORRECTIVE MEASURES DESIGNS, CORRECTIVE MEASURES IMPLEMENTATION REPORTS, INTERIM MEASURE WORK PLANS, AND INTERIM MEASURE REPORTS. THESE TASKS WILL REQUIRE WORKING WITH THE NASA/KSC ENVIRONMENTAL ASSURANCE BRANCH, OTHER NASA CONTRACTOR ORGANIZATIONS, THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP), AND U.S. ENVIRONMENTAL PROTECTION AGENCY (USEPA). | IDC | $91,000,000 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 541310Architectural Services | C214ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING | Jun 28, 2012 | Jun 28, 2012 | Sep 26, 2019 | ||
| GEOSYNTEC CONSULTANTS, INC. | — | IDC | $0 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | 562910Remediation Services | C211ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | Jan 12, 2009 | Jan 12, 2009 | — | ||
| GEOSYNTEC CONSULTANTS, INC. | CONSTRUCTION&BUILDING MATERIALS, ARCHTCT.&ENG. SUPPLIES | BOA | $0 | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | — | — | 541330Engineering Services | C130 | Jul 15, 2003 | Jul 15, 2003 | Jun 15, 2004 |