Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Apr 16, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 16, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 16, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912GB26RA002¬iceType=SolicitationNotice | LINK | Apr 16, 2026 |
FY25 SMITH BARRACKS UNACCOMPANIED PERSONNEL HOUSING (UPH), BAUMHOLDER, GERMANY
Contact and place of performance
Christian Solinsky
Not specified
The purpose of Amendment 02 is to provide Engineering Studies, extend the period of performance, and update the FAR/DFARS Clauses. Please see Amendment 02 for more details.The purpose of Amendment 01 is to provide a revised Drawings set. Attachments 12-14 are replaced in their entirety. The proposal due date has been extended. Please see Amendment 01 for more details. FY25 Smith Barracks Unaccompanied Personnel Housing (UPH), Baumholder, Germany Design-Bid-Build Construction of 108 personnel Enlisted Unaccompanied Personnel Housing Facility at Smith Barracks in Baumholder
The Department of the Army, Engineering District Europe, is soliciting bids for the design-bid-build construction of a 108-person Enlisted Unaccompanied Personnel Housing (UPH) facility at Smith Barracks in Baumholder, Germany. This project, identified under solicitation number W912GB26RA002, involves Commercial and Institutional Building Construction (NAICS 236220) and the Construction of Family Housing Facilities (PSC Y1FA). Recent amendments to the requirement have provided engineering studies, updated FAR/DFARS clauses, and issued a revised set of drawings to replace several previous attachments.
Interested parties must submit their proposals by the response deadline of June 11, 2026. The contract scope includes the full construction of the housing facility and an extended period of performance as outlined in the solicitation amendments. Christian Solinsky serves as the point of contact for this requirement, which includes one PDF attachment containing further technical details and engineering studies.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.