MORNHINWEG WETLANDS RESERVE EASEMENT RESTORATION NOBLE COUNTY, OK
The Farm Production and Conservation Business Center (FPAC) is soliciting bids for the restoration of the Mornhinweg Wetlands Reserve Easement in Noble County, Oklahoma. This project is an Invitation for Bid (IFB) for a firm-fixed-price construction contract set aside for small businesses. The work involves site preparation and civil engineering, including clearing, grubbing, excavation, and the construction of earth embankments and spillways. The contractor will provide all labor, equipment, and materials for installing steel piping, structural concrete, and site stabilization through topsoiling and seeding. A mandatory site visit is scheduled for June 10, 2026, at the Perry NRCS Field Office. Technical specifications, engineering drawings, and federal wage determinations are provided to define performance standards for earthwork and materials. Bidders must follow the bid schedule and provide a 20% bid bond and a 100% payment bond. The project scope is defined by a technical package of engineering drawings and material specifications. Primary tasks include clearing, excavation, and building earth embankments. The contractor will also install steel piping, place portland cement concrete for structures, and handle seeding and topsoil spreading. All work must meet NRCS standards for heavy construction and environmental restoration. The project involves heavy construction and civil engineering to restore wetland units in Noble County, Oklahoma, under a firm-fixed-price contract. The contractor is responsible for all personnel, supplies, and materials needed for clearing, grubbing, excavation, and embankment construction.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Mark Domingo
OK
USA
Please see attachment 1 Specifications document for further details . Site Showing Details: A site visit will be held on date June 10th, 2026 at 10:00am ET on that day. Attendees will meet at: Where: Perry NRCS Field Office. &...
View moreFurnishing, forming, placing, finishing, and curing portland cement concrete as required to build the structures described in section 24 of this specification.
Furnishing and installing steel pipe complete with lining, coating, fittings, and appurtenances.
Furnishing seed, labor, equipment, and planting seed on designated areas.
*See Specifications document attached to posting for full details of required work.