Name | Type | Posted | Actions |
|---|---|---|---|
RFP-BVSS HBEND MG-05132026_Rev. 2.pdf | Jun 4, 2026 | ||
Response to Questions 1 - RFP MG 05132026.pdf | Jun 4, 2026 | ||
Motion_Test_Fixture_Assembly.zip | ZIP | Jun 4, 2026 | |
RFP-BVSS HBEND MG-05132026_Rev. 1.pdf | May 15, 2026 | ||
Price Proposal Schedule Attachment A - Rev. 1 RFP MG-05132026.xlsx | XLSX | May 15, 2026 | |
Sample SubK - RFP MG-05132026 Rev. 1.pdf | May 15, 2026 | ||
AL-1852-0921_SOW_E.pdf | May 15, 2026 | ||
Sample SubK - RFP MG-05132026.pdf | May 13, 2026 | ||
GPs - Commercial Foreign (12-12-25).pdf | May 13, 2026 | ||
AL-1835-2074B.pdf | May 13, 2026 | ||
AL-1208-0209C.pdf | May 13, 2026 | ||
AL-1852-0921D_SOW.pdf | May 13, 2026 | ||
10068B.pdf | May 13, 2026 | ||
AL-1887-9848A.pdf | May 13, 2026 | ||
HBEND_MechSys_STEPs.zip | ZIP | May 13, 2026 | |
HBEND_MechSysDrawings_20260507.zip | ZIP | May 13, 2026 | |
Price Proposal Schedule Attachment A - RFP MG-05132026.xlsx | XLSX | May 13, 2026 | |
Technical Compliance Matrix - HBEND Magnet Mechanical System.xlsx | XLSX | May 13, 2026 | |
Past Performance Reference Information Form Attachment B.docx | DOCX | May 13, 2026 | |
Rep Cert Form RFP MG 05132026.docx | DOCX | May 13, 2026 | |
AL-1866-2948A.pdf | May 13, 2026 | ||
AL-1826-7182C.pdf | May 13, 2026 | ||
RFP-BVSS HBEND MG-05132026.pdf | May 13, 2026 | ||
GPs - Commercial Domestic (12-12-25).pdf | May 13, 2026 |
Advanced Light Source Upgrade (ALS-U) Storage Ring “Hard Bend” (HBEND) Magnets Mechanical System.
Contact and place of performance
Martha Grausz
Berkeley, CA 94720
USA
Dear Prospective Offeror: Please see attached Request for Proposal LBNL - MG-05132026 Revision 2, with the new proposal due date of 06/18/2026. Please note that the submission of the Technical Compliance matrix is no longer required. Also attached to this notice are answers to the 1st set of questions referring to this request for proposal. Thank you. Dear Prospective Offeror: Please dis...
View moreThe University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in the Request for Proposal (RFP) No. MG-05132026, Advanced Light Source Upgrade (ALS-U) Storage Ring “Hard Bend” (HBEND) Magnets Mechanical System.
We request that all prospective suppliers acknowledge receipt of this notice and indicate whether they intend to submit a proposal by May 18, 2026.
If your company does not intend to submit a proposal, please still acknowledge receipt of this notice and provide a brief explanation for the no-bid.
The RFP and associated documents (listed below) are attached to this message. The documents are associated with the email address receiving this notification. If this is not the correct email address, please notify me.
RFP documents include:
TIMELINE OF EVENTS
Release RFP – May 13, 2026
Offeror Questions Due - May 28, 2026, 3:00 PM Pacific Time - submit via email to [email protected]
Proposals Due - June 11 2026, 3:00 PM Pacific Time - submit via email to [email protected]
Thank you,
The Lawrence Berkeley National Laboratory, operated by the University of California on behalf of the Department of Energy, is soliciting proposals for the Advanced Light Source Upgrade (ALS-U) Storage Ring “Hard Bend” (HBEND) Magnets Mechanical System. This requirement is identified under solicitation number MG-05132026 and involves the manufacture and delivery of mechanical systems for magnets used in the ALS-U storage ring. The procurement is classified under NAICS 332999, All Other Miscellaneous Fabricated Metal Product Manufacturing, and PSC 5999, Miscellaneous Electrical and Electronic Components. There is no set-aside designated for this opportunity, which is listed as set-aside NONE (NONE).
The performance of this contract will take place in Berkeley, California. Proposals must be submitted to the point of contact, Martha Grausz, by the response deadline of June 18, 2026. The solicitation documentation includes 24 total attachments, including a Statement of Work, a Price Proposal Schedule, and technical assembly files. Following the release of Revision 2 of the Request for Proposal, offerors are instructed to exclude the Technical Compliance Matrix from their submission packages, as the required information is now detailed within the updated RFP document.
The acquisition schedule was originally published on May 13, 2026, and includes updated delivery due dates for the required ordered items. Evaluation of offers will be based on the criteria established in the provided RFP and associated documents, such as the Quality Evaluation Survey and Past Performance Reference Information Form. Offerors were requested to acknowledge receipt and indicate their intent to bid by May 18, 2026, with the final submission window closing in June 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.