Name | Type | Posted | Actions |
|---|---|---|---|
Attachment 1 FA462020QA200 - Combo RFQ Elevators (REV 2).pdf | Feb 21, 2020 | ||
Attachment 2 - Performance Work Statement (REV 2).pdf | Feb 21, 2020 | ||
SF30 Amendment 3 FA462020QA200.pdf | Feb 21, 2020 | ||
SF30 Amendment 2.pdf | Feb 12, 2020 | ||
Attachment 2 Performance Work Statement (REV 1).pdf | Feb 12, 2020 | ||
Attachment 1 FA462020QA200 - Combo RFQ - FY21 Elevators (REV 1).pdf | Feb 12, 2020 | ||
Attachment 4 Past Performance Questionnaire (REV 1).pdf | Feb 4, 2020 | ||
SF30 Amendment 1 FA462020QA200.pdf | Feb 4, 2020 | ||
Attachment 1 Performance Work Statement.pdf | Jan 9, 2020 | ||
Attachment 4 Past Performance Questionnaire.pdf | Jan 9, 2020 | ||
Attachment 2 Wage Determination.pdf | Jan 9, 2020 | ||
FA462020QA200 - Combo RFQ - FY21 Elevators.pdf | Jan 9, 2020 | ||
Attachment 3 OPSEC Information.pdf | Jan 9, 2020 |
Elevator Maintenance, Repair and Inspection Services
Elevator Maintenance, Repair and Inspection Services
The Department of the Air Force, 92 CONS LGC, is seeking a contractor to provide all management, tools, supplies, equipment, parts, and labor necessary to maintain, repair, and inspect vertical transportation equipment at Fairchild AFB, WA. Under solicitation FA462020QA200, the selected full-maintenance provider assumes total service responsibility for 15 elevators to ensure continuous and safe operation in compliance with state and federal guidance. The ordering period for these services is scheduled from October 1, 2020, through September 30, 2025.
This opportunity is designated as an SBA (SBA) set-aside. It falls under NAICS code 811310, Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance, and PSC J035, MAINT/REPAIR/REBUILD OF EQUIPMENT- SERVICE AND TRADE EQUIPMENT. Responses must be submitted by February 24, 2020, to the primary point of contact, Clifford C Dockter.
The solicitation includes 13 total attachments, such as the Performance Work Statement, various amendments, and the combined Request for Quotes. Recent updates include Amendment 2, which provided questions and answers, a revised Performance Work Statement, and an updated Combo RFQ. Final revisions to the solicitation documents and the Performance Work Statement were posted on February 21, 2020.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Clifford C Dockter
Fairchild AFB, WA 99011
USA
NOTE: This posting has 2 Amendments as of 12Feb20. Amendment 2 Consists of questions and answers for the solicitation, updated PWS and updated Combo RFQ. The Contractor shall provide all management, tools, supplies, equipment, parts and labor necessary to maintain, repair, and inspect the vertical transportation equipment (VTE) at Fairchild AFB WA. All work shall be performed in a manner that will ensure continuous a...
View more