Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Sep 10, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Sep 10, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Sep 10, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911S225U1989¬iceType=CombinedSynopsisSolicitation | LINK | Sep 10, 2025 |
Physical Training Outdoor Shelter
Contact and place of performance
Alexander Cho
98433
Item:PT ShelterBrand Name:Part Number:Salient Characteristics:The PT shelter needs to provide at/or around 1,600 square feet or40x40ft of covered space for operational, training, or storage requirements. It needs to havea weatherproof frame and a UV-resistant, waterproof, and fire-retardant canopy, for use inadverse conditions. The shelter should be deployable in 2?3 hours by 4?6 personnelwithout heavy equipment and...
View moreThe Department of the Army, specifically the W6QM MICC-FT Drum, is seeking to procure a PT Shelter under solicitation number W911S225U1989. This requirement is categorized under NAICS 321991 for Manufactured Home (Mobile Home) Manufacturing and PSC 5411 for Rigid Wall Shelters. The acquisition is designated as an SBA set-aside. Interested parties must submit their responses by the deadline of September 18, 2025.
The required shelter must provide approximately 1,600 square feet of covered space, measuring 40 by 40 feet, to support operational, training, or storage requirements. The unit must feature a corrosion-resistant, weatherproof frame and a UV-resistant, waterproof, and fire-retardant canopy capable of withstanding sustained wind loads of 50 to 60 mph and moderate snow accumulation. Design specifications require a peak height of 14 to 16 feet and a modular construction that allows for scalability by connecting multiple units.
For logistics and deployment, the shelter must be transportable as palletized, forklift-compatible pieces that can be assembled in two to three hours by a team of four to six personnel without the use of heavy equipment. Alexander Cho serves as the point of contact for this notice, which currently includes no attachments. This procurement is documented through SAM.gov and was last updated on September 11, 2025.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.