Name | Type | Posted | Actions |
|---|---|---|---|
W912EF26RA003 Amendment 0008 JDA_and_LSR_Average_Impedance.pdf | May 7, 2026 | ||
Solicitation Amendment W912EF26RA0030008 SF 30.pdf | May 7, 2026 | ||
W912EF26RA003 Amendment 8 Westinghouse Test Report for 7000374 7000942 and 7001750.pdf | May 7, 2026 | ||
26RA003 - Amend-007 - VOL. 2 - T2 Redlines.pdf | Apr 29, 2026 | ||
Solicitation Amendment W912EF26RA0030007 SF 30.pdf | Apr 29, 2026 | ||
26RA003 - Amend-007 - Transformer Design Specs.pdf | Apr 29, 2026 | ||
26RA003 - Amend-007 - VOL. 1 - T1 Redlines.pdf | Apr 29, 2026 | ||
Solicitation Amendment W912EF26RA0030006 SF 30.pdf | Apr 16, 2026 | ||
Solicitation Amendment W912EF26RA0030005 SF 30.pdf | Mar 16, 2026 | ||
Solicitation Amendment W912EF26RA0030004 SF 30.pdf | Mar 3, 2026 | ||
Solicitation Amendment W912EF26RA0030004 SF 30.pdf | Feb 19, 2026 | ||
26RA003 - Tech Specs Amendment 0003.pdf | Feb 17, 2026 | ||
Solicitation Amendment W912EF26RA0030003 SF 30.pdf | Feb 17, 2026 | ||
Solicitation Amendment W912EF26RA0030002 SF 30.pdf | Jan 15, 2026 | ||
Solicitation Amendment W912EF26RA0030001 SF 30.pdf | Dec 23, 2025 | ||
26RA003_Plans_V1.pdf | Dec 5, 2025 | ||
26RA003_Supplemental_Drawings_V2.pdf | Dec 5, 2025 | ||
26RA003_Supplemental_Drawings_V1.pdf | Dec 5, 2025 | ||
26RA003 Solicitation Tech Specs.pdf | Dec 5, 2025 | ||
Solicitation - W912EF26RA003.pdf | Dec 5, 2025 | ||
NWW_JA Sole Source Determination ABB-Hitachi Bushings_Signed_Print_Redacted.pdf | Dec 5, 2025 | ||
Small Business Participation Proposal.pdf | Dec 5, 2025 | ||
Past Performance Questionnaire Form.pdf | Dec 5, 2025 | ||
26RA003_Plans_V2.pdf | Dec 5, 2025 |
Spare Transformers for the Lower Snake River Plants
Spare Transformers for the Lower Snake River Plants
Contact and place of performance
Preston Jones
WA 99328
USA
Please see attached.
The US Army Corps of Engineers, Walla Walla District, issued solicitation W912EF26RA003 for the acquisition of spare transformers for the Lower Snake River Plants. This requirement is classified under NAICS 335311, Power, Distribution, and Specialty Transformer Manufacturing, and PSC 6120, TRANSFORMERS: DISTRIBUTION AND POWER STATION. Performance of the contract will occur at locations in Washington, USA.
The solicitation period is currently active with a response deadline of June 18, 2026. Preston Jones serves as the point of contact for this notice. The procurement involves detailed technical requirements as evidenced by 24 attachments, including transformer design specifications, average impedance data, and specific test reports for units such as 7000374, 7000942, and 7001750. Documentation also includes multiple solicitation amendments and redlined design volumes.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.