Sanitation and Refuse Services, Cordova Alaska
Contact and place of performance
Mallory Zelenak
Cordova, AK
USA
The Alaska Army National Guard (AKARNG) requires a contractor to provide all necessary personnel, equipment, and materials for comprehensive trash and human waste removal services. These services will support the AKARNG's Annual Training in Cordova, Alaska. Scope of Work: The contractor shall be responsible for the delivery, maintenance, and final removal of sanitation equipment. The specific requirements include...
View morePerform weekly refuse extraction for the 6-yard dumpster.
Ensure sanitation units do not exceed 75% capacity and handwash stations remain at least 25% stocked.
All operations must comply with Federal, State of Alaska, and local health and safety guidelines.
Final Removal and Site Cleanup:
At the conclusion of the contract period, remove all provided equipment from the site.
Ensure the area is left clean, free of residual waste, and restored to its original condition.
Period of Performance:
01 August 2026 – 29 August 2026
The Department of the Army, via the Alaska Army National Guard, is soliciting for comprehensive trash and human waste removal services under solicitation number W91ZRU26QA016. This requirement is designated as an SBA Small Business Administration set-aside and is classified under NAICS 562991 Septic Tank and Related Services and PSC W085 LEASE OR RENTAL OF EQUIPMENT- TOILETRIES. Responses are due by June 6, 2026, and should be directed to Mallory Zelenak at the W7MU USPFO Activity AK ARNG office.
The contractor will provide all personnel, equipment, and materials necessary to support the Alaska Army National Guard’s Annual Training in Cordova, Alaska. The scope includes the delivery and setup of four portable toilets, one handwashing station, and one 6-yard dumpster. Contracted services involve weekly sanitation maintenance such as pumping, cleaning, and restocking to ensure units do not exceed 75% capacity and handwash stations remain at least 25% stocked. All operations must comply with Federal, State of Alaska, and local health and safety guidelines during the performance period of August 1, 2026, through August 29, 2026.
At the conclusion of the performance period, the contractor is responsible for the final removal of all equipment and the restoration of the site to its original condition. The solicitation is supported by four attachments, including a signed solicitation document, a performance work statement, and two documents addressing answered requests for information. All work is to be performed locally in Cordova, Alaska.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.