Name | Type | Posted | Actions |
|---|---|---|---|
Revised PRICE COST SCHEDULE on Page 9 of the solicitation.docx | DOCX | Jun 1, 2026 | |
36C78626B0006 0004.docx | DOCX | Jun 1, 2026 | |
36C78626B0006 0003.docx | DOCX | May 15, 2026 | |
36C78626B0006 0002.docx | DOCX | May 11, 2026 | |
Prebid Site Visit Attendance Sheet 823 CM3024 Renovate Roads and FCA corrections at Wood NC.pdf | May 11, 2026 | ||
Revised Statement of Work 823CM3024 Renovate Roads and FCA Corrections at Wood NC.pdf | Apr 28, 2026 | ||
Revised IFB Cost Estimate Worksheet.xlsx | XLSX | Apr 28, 2026 | |
Revised Page Two of 36C78626B0006_1 Document.docx | DOCX | Apr 28, 2026 | |
36C78626B0006 0001.docx | DOCX | Apr 28, 2026 | |
IFB Cost Estimate Worksheet.xlsx | XLSX | Apr 22, 2026 | |
36C78626B0006_1.docx | DOCX | Apr 22, 2026 | |
DIGNITY STANDARDS.pdf | Apr 22, 2026 | ||
Statement of Work 823CM3024 Renovate Roads and FCA Corrections at Wood NC.pdf | Apr 22, 2026 | ||
Bid Specifications 823CM3024 Renovate Roads and FCA Corrections at Wood NC.pdf | Apr 22, 2026 | ||
Bid Geotechnical Report_823CM3024 Renovate Roads and FCA Corrections at Wood NC.pdf | Apr 22, 2026 | ||
Bid Drawings Vol. 1 of 3_823CM3024 Renovate Roads and FCA Corrections at Wood NC.pdf | Apr 22, 2026 | ||
Bid Drawings Vol. 2 of 3_823CM3024 Renovate Roads and FCA Corrections at Wood NC.pdf | Apr 22, 2026 | ||
Bid Drawings Vol. 3 of 3_823CM3024 Renovate Roads and FCA Corrections at Wood NC.pdf | Apr 22, 2026 | ||
Davis-Bacon Wage Determination_Heavy_WI20260015 01-02-2026.pdf | Apr 22, 2026 | ||
VAAR 852.219-75 VA Notice of Limitations On Subcontracting Certificate.docx | DOCX | Apr 22, 2026 |
Y1PZ--823CM3024 Renovate Roads and FCA Corrections at Wood National Cemetery
The Department of Veterans Affairs is soliciting bids for project 823CM3024, which involves renovating roads and correcting Facility Condition Assessment (FCA) deficiencies at Wood National Cemetery in Milwaukee, Wisconsin. This procurement is an Invitation for Bid (IFB) set aside for 100% Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The scope includes road rehabilitation, curb and gutter repairs, sidewalk replacement, and drainage corrections, with a performance period of 270 calendar days from the notice to proceed. Four amendments have been issued to date, introducing a revised pricing structure and clarifying technical requirements. Amendment 0004 added CLIN 0005 to the Price/Cost Schedule for roadway base repairs. Bidders are required to use the revised versions of the Statement of Work, SF-1442, and Cost Estimate Worksheet. The final deadline for bid submission is June 2, 2026, at 2:00 PM EDT. The attachment package includes three volumes of bid drawings, technical specifications, a geotechnical report, and National Cemetery Administration (NCA) Dignity Standards. These documents establish operational constraints such as coordination with burial schedules, prohibitions on onsite storage containers, and behavioral protocols for working within a national cemetery. Submissions must also include a bid bond and a signed VA Notice of Limitations on Subcontracting Certificate of Compliance. The solicitation has been updated through four amendments. These changes added CLIN 0005 for roadway base repairs and released revised versions of the Statement of Work, Price/Cost Schedule, and Cost Estimate Worksheet. Bidders must use these updated documents and acknowledge all amendments. The project involves rehabilitating cemetery roads, curbs, gutters, and sidewa…
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Richard Adu
Not specified
This amendment to solicitation number 36C78626B0006 for 823CM3024 Renovate Roads and FCA Corrections at Wood National Cemetery, is to add CLIN 0005 to A.4 PRICE/COST SCHEDULE on page 9 of the solicitation document.