Name | Type | Posted | Actions |
|---|---|---|---|
FA811822R0038.pdf | Jun 3, 2022 | ||
PWS.pdf | Jun 3, 2022 | ||
CAV Reporting.pdf | Jun 3, 2022 | ||
Government Prop. Invent. Report_DID.pdf | Jun 3, 2022 | ||
3034609_WAGEDET.pdf | Jun 3, 2022 | ||
3434499_PKGRQMT_REPORT.pdf | Jun 3, 2022 | ||
3434500_TRNSPDATA_REPORT.pdf | Jun 3, 2022 | ||
2884914_CDRL1_REPORT.pdf | Jun 3, 2022 | ||
Production Surge Plan_DID.pdf | Jun 3, 2022 | ||
Contract depot Maint. Prod. Report_DID.pdf | Jun 3, 2022 | ||
CAV AF REPORTING REQUIREMENTS.pdf | Jun 3, 2022 |
B-2 Rollover Mechanism Assembly
B-2 Rollover Mechanism Assembly
Contact and place of performance
Phaedra Prather
USA
Updated Contact Information, Due Date remains Unchanged. The United States Air Force through Air Force Sustainment Center (AFSC), Tinker AFB 73145 is contemplating the Overhaul of B-2 Rollover Mechanism1680-01-397-4363FW. A firm fixed price type contract is contemplated. The requirements set forth in this notice are defined per Purchase Request FD20301902830 as follows: Written response is required. CLIN 0001: Overha...
View moreThe Department of the Air Force, through the Air Force Sustainment Center at Tinker Air Force Base, is soliciting proposals for the overhaul of the B-2 Rollover Mechanism under solicitation number FA811822R0038. This requirement is classified under NAICS 336413 for Other Aircraft Parts and Auxiliary Equipment Manufacturing and PSC J016 for the maintenance, repair, and rebuilding of aircraft components and accessories. The government intends to award a firm-fixed-price contract to provide 180 degrees of rotational movement for the deployment and stowing of the Aerial Refueling Receptacle. The assembly consists of four mechanical links and a hydraulic actuator made of aluminum, measuring 18.5 by 26 by 36 inches and weighing 40 pounds.
The scope of work includes testing, teardown, evaluation, and overhaul of the mechanisms (NSN 1680-01-397-4363FW) with a minimum requirement of three units and a maximum of 12 units over a three-year contract period. Performance will take place in the United States, with a delivery schedule of three units every 90 days after the receipt of order and reparable assets. Engineering source approval is required to maintain the quality of the part due to the unique design capability and manufacturing knowledge necessary for the overhaul; Parker-Hannifin Corp is currently an approved source. There is no set-aside (N/A) designated for this acquisition.
Written responses must be submitted by the deadline of August 2, 2022, to the point of contact, Phaedra Prather. Offerors are required to specify their business size, such as small or large business status, and whether they are U.S. or foreign-owned. The solicitation includes 11 attachments, including a Performance Work Statement, Wage Determination, and CAV Reporting instructions. The government will not use policies contained in FAR Part 12 for commercial items but allows interested parties to identify their capability to satisfy the requirement with a commercial item.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.